ML061360494

From kanterella
Revision as of 19:49, 7 December 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of the Annual Assessment Meeting with FPL Energy Seabrook
ML061360494
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/16/2006
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Florida Power & Light Energy Seabrook
Krohn P, RI/DRP/PB6/610-337-5120
Shared Package
ML060660563 List:
References
MN 06-009
Download: ML061360494 (2)


Text

May 16, 2006 MEETING

SUMMARY

LICENSEE: FPL ENERGY SEABROOK, LLC FACILITY: SEABROOK STATION

SUBJECT:

SUMMARY

OF MARCH 30, 2006, ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 30, 2005, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn of Hampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRCs assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2005.

The NRC presented and discussed its assessment of the safety performance of Seabrook Unit 1 for the period between January 1 through December 31, 2005. The NRC presentations included a discussion of the reactor oversight process, general background on the plant, performance assessment results, and an overview of calendar year 2006 planned inspections.

As part of this annual assessment meeting, Seabrook presented an overview of their performance and initiatives in selected areas.

The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the design of spent fuel storage facilities and security issues that occurred during 2005. The meeting notice with attached meeting agenda can be located in ADAMS Accession No. ML060660573. The slides for the meetings can be found at ADAMS Accession No. ML060820248.

Sincerely,

/RA/

Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects

Distribution:

P. Krohn, DRP S. Barber, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP N. Sieller, DRP E. Huang, DRP E. Miller, NRR SISP Review Complete: __PGK________

DOCUMENT NAME: E:\Filenet\ML061360494.wpd After declaring this document An Official Agency Record it will be released to the Public.