Letter Sequence Acceptance Review |
---|
TAC:MD0011, Addition of LCO 3.0.8, Inoperability of Snubbers (Open) TAC:MD0012, Addition of LCO 3.0.8, Inoperability of Snubbers (Open) |
|
|
|
---|
Category:Technical Specification
MONTHYEARML24183A2622024-06-19019 June 2024 Unit, Technical Specification Bases, Manual ML24183A2682024-06-19019 June 2024 Technical Specifications Bases, Manual ML24103A2152024-04-0505 April 2024 Revision to Technical Bases Manual PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 PLA-7892, Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-78922020-11-0505 November 2020 Temporary Change to the Technical Specifications to Allow Replacement of Transformers 1X230 and 1X240 PLA-7892 ML20129J9132020-04-23023 April 2020 Technical Specification Bases, Unit 1, Manual ML20036C9682020-01-29029 January 2020 Technical Specifications Bases, Manual ML20036C9732020-01-29029 January 2020 Technical Specification Bases, Manual ML19161A1372019-05-15015 May 2019 Technical Specification Bases Manual ML19078A1332019-03-0606 March 2019 Technical Requirements Manual ML19078A1342019-03-0606 March 2019 Technical Requirements Manual ML19078A2102019-03-0606 March 2019 Technical Specification Bases, Manual ML19078A2112019-03-0606 March 2019 Technical Specifications Bases, Manual PLA-7751, Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping2019-01-0909 January 2019 Proposed Amendment to Licenses NPF-14 and NPF-22: Temporary Change to the Technical Specifications to Allow Replacement of Emergency Service Water System Piping ML19011A0572019-01-0707 January 2019 Technical Requirements Manual ML19011A0582019-01-0404 January 2019 Technical Specifications Bases Manual ML19011A0592019-01-0404 January 2019 Technical Specification Bases Manual ML18306A4882018-10-25025 October 2018 Revised Technical Specifications Manual ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 ML18201A1992018-07-11011 July 2018 Technical Specifications Bases, Manual ML18197A0782018-07-0909 July 2018 Revision 15 to Technical Specifications Bases Manual ML18128A2022018-04-25025 April 2018 Revision to Technical Specifications Bases Manual ML18128A2032018-04-25025 April 2018 Revision to Technical Specification Bases, Manual ML18072A0992018-02-28028 February 2018 Technical Specification Bases Manual ML18072A1002018-02-28028 February 2018 Revision 11 to Technical Specifications Bases Manual ML18033A3342018-01-24024 January 2018 Technical Specifications Bases Manual ML18033A3312018-01-24024 January 2018 Technical Specification Bases Manual PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17284A1772017-10-0202 October 2017 Technical Specification Bases Manual ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) ML17270A0632017-09-18018 September 2017 Technical Specifications Bases, Manual ML17164A1772017-06-0101 June 2017 Revision to Technical Specifications Bases Manual ML17118A0752017-04-20020 April 2017 Revision to Technical Specification Bases Manual ML17118A0762017-04-20020 April 2017 Revisions to Technical Specifications Bases Unit 2 Manual PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML16334A2652016-11-17017 November 2016 Technical Specification Bases Manual ML16110A3162016-04-14014 April 2016 Technical Specification Bases Manual ML16040A2032016-02-0303 February 2016 Technical Specification Bases Manual ML15329A1652015-11-11011 November 2015 Technical Requirements Manual ML15329A1662015-11-11011 November 2015 Technical Requirements Manual ML15317A0092015-11-0505 November 2015 Technical Specifications Bases Manual ML15317A0102015-11-0505 November 2015 Technical Specifications Bases Manual ML15077A4562015-03-0606 March 2015 Technical Requirements Manual ML15034A3112015-01-23023 January 2015 Technical Specifications Bases, Unit 2 Manual ML15034A3102015-01-23023 January 2015 Technical Specification Bases Unit 1 Manual 2024-06-19
[Table view] Category:Amendment
MONTHYEARPLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) ML18267A3792018-10-0303 October 2018 Correction to Technical Specification Page 3.6-37 for Error Introduced During the Issuance of Amendment Nos. 266 and 247 PLA-7644, Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644)2017-12-14014 December 2017 Proposed Amendments to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements (PLA-7644) ML17265A4412017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 2 of 3) ML17265A4432017-09-20020 September 2017 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control PLA-7625 (Part 3 of 3) PLA-7444, Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To...2017-02-0101 February 2017 Proposed Amendment Requests to License No. NPF-14 and License No. NPF-22: Adoption of Technical Specification Task Force Traveler TSTF-522-A, Revision 0, Revise Ventilation System Surveillance Requirements To... ML12242A2442012-08-14014 August 2012 Technical Specifications Bases Unit 2 Manual PLA-6539, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information2009-07-10010 July 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Tech Spec 3.8.1 Supplemental PRA Information PLA-6509, Supplemental Electrical Information to License Amendment Request on the Technical Specifications2009-05-12012 May 2009 Supplemental Electrical Information to License Amendment Request on the Technical Specifications PLA-6505, Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information2009-04-30030 April 2009 Amendment Request No. 305 to Unit 1 License NPF-14 and Amendment Request No. 276 to Unit 2 License NPF-22: One-Time Extension of Technical Specification 3.8.1 PRA Supplemental Information PLA-6235, Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f2009-03-24024 March 2009 Emergency Core Cooling System Instrumentation - Technical Specification (TS) Table 3.3.5.1+1 and Editorial Change to TS 3.10.8.f PLA-6480, One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-64802009-03-24024 March 2009 One-Time Extension to Technical Specification 3.8.1 Allowable Completion Time for Offsite AC Circuits, PLA-6480 PLA-6474, Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 262009-03-24024 March 2009 Amendment Request No. 304 and 275, Adoption of TSTF-511, Rev 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 PLA-6359, Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-63592009-02-20020 February 2009 Application to Revise Technical Specifications Regarding Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process (CLIIP) PLA-6359 PLA-5604, Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP2008-07-0707 July 2008 Proposed Amendment No. 253 to License NPF-14 and Proposed Amendment No. 218 to License NPF-22: Request for Adoption of TSTF-460-A, Rev. 0, Control Rod Scram Time Test Frequency Using the CLIIP PLA-6304, Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.42008-03-28028 March 2008 Proposed Amendment No. 298 to Unit 1 License NPF-14 and Amendment No. 268 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specification 3.8.4 PLA-6306, Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement2007-11-30030 November 2007 Proposed License Amendments 285 and 253 - Constant Pressure Power Uprate Application - Supplement PLA-6266, Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS2007-08-28028 August 2007 Proposed License Amendment No. 285 for Unit 1, License No. NPF-14 & Proposed License Amendment No. 253 for Unit 2, License No. NPF-22, Extended Power Uprate Application Regarding Change to Technical Specification SR 3.7.1 - RHRSW and UHS PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-61722007-03-22022 March 2007 Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 PLA-6114, Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67...2006-09-15015 September 2006 Proposed Amendment Nos. 281 and 251 to Licenses NPF-22 and NPF-22, Application for License Amendment and Related Technical Specification Changes to Implement Full-Scope Alternative Source Term in Accordance with 10 CFR 50.67... ML0619100912006-07-0707 July 2006 Technical Specifications Pages Re 3.0 Limiting Condition for Operation (LCO) Applicability PLA-6049, Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System2006-04-28028 April 2006 Proposed License Amendment Nos. 289 and 257, Standby Liquid Control System ML0609603342006-03-31031 March 2006 Susquehanna - Proposed License Amendment Numbers 285 for Unit 1 and 253 for Unit 2, Constant Pressure Power Uprate, PLA-6002 ML0609004652006-03-30030 March 2006 Technical Specification 3.4.10 RCS Pressure and Temperature (P/T) Limits, October 5, 2005 ML0608007312006-03-20020 March 2006 Tech Spec for Susquehanna, Unit 1 - Issuance of Amendment Regarding Minimum Critical Power Ratio Safety Limit and Reference Changes ML0603306392006-02-0202 February 2006 Tech Spec Susquehanna Steam Electric Station, Unites 1 and 2 - Issuance of Amendment Revision to Specification Surveillance Requirement 3.6.4.1.4 and 3.6.4.1.5, Secondary Containment and Draw Down Testing PLA-5993, Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times.2006-02-0101 February 2006 Proposed Amendment No. 284 to License NPF-14 & Proposed Amendment No. 252 to License NPF-22 to Revise Technical Specification 3.1.4, Control Rod Scram Times. ML0531803282005-11-10010 November 2005 Technical Specification Page Regarding Minimum Critical Power Ratio Safety Limit PLA-5967, Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit2005-10-14014 October 2005 Proposed Amendment No. 282 to Facility Operating License NPF-14: Proposed Change to Technical Specification 2.1.1.2 MCPR Safety Limit PLA-5888, Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports.2005-10-0505 October 2005 Proposed Amendment Nos. 274 and 243 to License Nos. NPF-14 and NPF-22, Application for Technical Specification Improvement to Revise Technical Specifications to Eliminate Requirements for Monthly Operating Reports. ML0521700382005-08-0404 August 2005 Technical Specification Pages Re Containment Purge Value Leak Rate Test Frequency PLA-5880, Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-58802005-06-27027 June 2005 Proposed License Amendment Numbers 272 for Unit 1 Operating License No. NTF-14 and 241 for Unit 2 Operating License No. NPF-22, Power Range Neutron Monitor System Digital Upgrade PLA-5880 PLA-5891, Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-58912005-04-27027 April 2005 Proposed Amendment No. 275 to Unit 1 Facility Operating License NPF-14 and Proposed Amendment No. 244 to Unit 2 Facility Operating License NPF-22: Exigent Change to Technical Specification 3.8.4, PLA-5891 ML0509000432005-03-29029 March 2005 Technical Specification Pages Re ADS-LPCI Discharge Pressure PLA-5869, Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.72005-03-18018 March 2005 Proposed Amendment No. 240 to License No. NPF-22 Regarding Revision to Technical Specifications 3.3.8.1 and 3.8.7 PLA-5850, Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-58502005-01-28028 January 2005 Proposed Amendment No. 238 to Unit 2 License NFP-22: Editorial Change to Technical Specification Table 3.3.5.1-1 PLA-5850 PLA-5840, Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-58402005-01-28028 January 2005 Proposed Amendment: Revision to Technical Specification 5.5.6., PLA-5840 PLA-5825, Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-58252004-11-0909 November 2004 Proposed Amendment No. 269 to Unit 1 License NPF-14 and Amendment No. 236 to Unit 2 License NPF-22: DC Electrical Power Systems Technical Specifications Rewrite PLA-5825 PLA-5764, Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-57642004-09-22022 September 2004 Proposed License Amendment Numbers 267 for Unit 1 and 232 for Unit 2 Mode Change Limitations Using the Consolidated Line Item Improvement (CLIIP) Process PLA-5764 PLA-5811, Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-58112004-09-22022 September 2004 Proposed Amendment No. 235 to License NFP-22: Changes to Reactor Pressure Vessel Pressure-temperature (P-T) Limits PLA-5811 PLA-5755, Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume.2004-09-0808 September 2004 Proposed Amendment No. 265 to License NPF-14 & Proposed Amendment No. 230 to License NPF-22: Application for Technical Specification Improvement to Revise Technical Specification 3.1.8 Scram Discharge Volume. PLA-5785, Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-57852004-07-15015 July 2004 Table of Contents Revisions Proposed Amendment No. 259 and Proposed Amendment No. 224 Revised Response to GL 94-02: Long-Term Stability Solution PLA-5785 PLA-5739, Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws2004-05-11011 May 2004 Proposed Amendment Nos. 264 and 229, Respectively Regarding Resolution of URI 2001-04-03 Standby Liquid Control/Atws PLA-5726, Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.32004-03-0505 March 2004 Proposed License Amendment Regarding Secondary Containment Access Doors Surveillance Requirements 3.6.4.1.3 PLA-5722, Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f2004-03-0404 March 2004 Proposed License Amendments Regarding ADS-LPCI Discharge Pressure, TS 3.3.5.1-1, Function 4.f and 5.f PLA-5686, Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution2003-12-22022 December 2003 Proposed Amendment No. 259 to License NPF-14, and Proposed Amendment No. 224 to License NPF-22, Revised Response to Gl 94-02: Long-term Stability Solution PLA-5694, Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements2003-12-0505 December 2003 Proposed Amendment Regarding Revised Main Turbine Bypass System Requirements ML0330904032003-10-29029 October 2003 Tech Spec Pages for Amendments 215 & 190 Revised Response to Generic Letter 94-02 Long-Term Stability Solution 2023-11-02
[Table view] |
Text
(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational tests, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 236, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
For Surveillance Requirements (SRs) that are new in Amendment 178 to Facility Operating License No. NPF-14, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 178. For SRs that existed prior to Amendment 178, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 178.
(3) Conduct of Work Activities During Fuel Load and Initial Startup.
The operating licensee shall review by committee all facility construction, Preoperational Testing, and System Demonstration activities performed concurrently with facility initial fuel loading or with the facility Startup Test Amendment No. 5, +43, +78, 4-8e, +8-8, 4-94, £-5, 236 I
PPL Rev. 2 LCO Applicability 3.0 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7 and LCO 3.0.8.
LCO 3.0.2 Upon discovery of a failure to meet an LCQ, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
Ifthe LCO is met or Is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or ifdirected by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a. MODE 2 within 7 hours0.292 days <br />0.0417 weeks <br />0.00959 months <br />;
- b. MODE 3 within 13 hours0.542 days <br />0.0774 weeks <br />0.0178 months <br />; and
- c. MODE 4 within 37 hours1.542 days <br />0.22 weeks <br />0.0507 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation In accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 Is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
(continued)
SUSQUEHANNA - UNIT 1 TS / 3.0-1 Amendment 18, 2/19 236,
PPL Rev. 2 LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.6 program, the appropriate Conditions and Required Actions of the (continued) LCO in which the loss of safety function exists are required to be entered. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance with LCO 3.0.2.
LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br />; or
- b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.
At the end of the specified period, the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.
(continued)
SUSQUEHANNA - UNIT 1 TS / 3.0-3 rmendment 1/'8, A 9
(4) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; and (5) PPL Susquehanna, LLC, pursuant to the Act and 10 CFR Parts 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(1) Maximum Power Level PPL Susquehanna, LLC is authorized to operate the facility at reactor core power levels not in excess of 3489 megawatts thermal (100% power) in accordance with the conditions specified herein and in Attachment 1 to this license. The preoperational test, startup tests and other items identified in Attachment 1 to this license shall be completed as specified. Attachment 1 is hereby incorporated into this license.
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 213, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
For Surveillance Requirements (SRs) that are new in Amendment 151 to Facility Operating License No. NPF-22, the first performance is due at the end of the first surveillance interval that begins at implementation of Amendment 151. For SRs that existed prior to Amendment 151, including SRs with modified acceptance criteria and SRs whose frequency of performance is being extended, the first performance is due at the end of the first surveillance interval that begins on the date the Surveillance was last performed prior to implementation of Amendment 151.
2.C.(3) PPL Susquehanna, LLC shall implement and maintain in effect all provisions of the approved fire protection program as described in the Fire Protection Review Report for the facility and as approved in Fire Protection Program, Section 9.5, SER, SSER#1, SSER#2, SSER#3, SSER#4, SSER#6, Safety Evaluation of Fire Protection Report dated August 9, 1989, Safety Evaluation Amendment No. 1-, 2, 1-G3, 4-50, +5+, 1-53, +62, +69, 2-1-2, 213 I
PPL Rev. 2 LCO Applicability 3.0 3.0 LCO APPLICABILITY LCO 3.0.6 program, the appropriate Conditions and Required Actions of the (continued) LCO in which the loss of safety function exists are required to be entered. When a support system's Required Action directs a supported system to be declared inoperable or directs entry into Conditions and Required Actions for a supported system, the applicable Conditions and Required Actions shall be entered in accordance witlh LCO 3.0.2.
LCO 3.0.7 Special Operations LCOs in Section 3.10 allow specified Technical Specifications (TS) requirements to be changed to permit performance of special tests and operations. Unless otherwise specified, all other TS requirements remain unchanged. Compliance with Special Operations LCOs is optional. When a Special Operations LCO is desired to be met but is not met, the ACTIONS of the Special Operations LCO shall be met. When a Special Operations LCO is not desired to be met, entry into a MODE or other specified condition in the Applicability shall only be made in accordance with the other applicable Specifications.
LCO 3.0.8 When one or more required snubbers are unable to perform their associated support function(s), any affected supported LCO(s) are not required to be declared not met solely for this reason if risk is assessed and managed, and:
- a. The snubbers not able to perform their associated support function(s) are associated with only one train or subsystem of a multiple train or subsystem supported system or are associated with a single train or subsystem supported system and are able to perform their associated support function within 72 hours3 days <br />0.429 weeks <br />0.0986 months <br />; or
- b. The snubbers not able to perform their associated support function(s) are associated with more than one train or subsystem of a multiple train or subsystem supported system and are able to perform their associated support function within 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br />.
At the end of the specified period, the required snubbers must be able to perform their associated support function(s), or the affected supported system LCO(s) shall be declared not met.
(continued)
SUSQUEHANNA - UNIT 2 TS / 3.0-3 Amendment 15f, 145 213
PPL Rev. 2 LCO Applicability 3.0 3.0 LIMITING CONDITIONS FOR OPERATION (LCO) APPLICABILITY LCO 3.0.1 LCOs shall be met during the MODES or other specified conditions in the Applicability, except as provided in LCO 3.0.2, LCO 3.0.7 and LCO 3.0.8.
LCO 3.0.2 Upon discovery of a failure to meet an LCO, the Required Actions of the associated Conditions shall be met, except as provided in LCO 3.0.5 and LCO 3.0.6.
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required, unless otherwise stated.
LCO 3.0.3 When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS, the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Acti6n shall be initiated within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in:
- a. MODE 2 within 7 hours0.292 days <br />0.0417 weeks <br />0.00959 months <br />;
- b. MODE 3 within 13 hours0.542 days <br />0.0774 weeks <br />0.0178 months <br />; and
- c. MODE 4 within 37 hours1.542 days <br />0.22 weeks <br />0.0507 months <br />.
Exceptions to this Specification are stated in the individual Specifications.
Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
LCO 3.0.3 is only applicable in MODES 1, 2, and 3.
(continued)
SUSQUEHANNA - UNIT 2 TS / 3.0-1 Amendment 15/I, 1h5 213,