Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves
ML062280434
Person / Time
Site: Pilgrim
Issue date: 08/18/2006
From: James Shea
NRC/NRR/ADRO/DORL/LPLA
To: Kansler M
Entergy Nuclear Operations
SHea J, NRR/DORL, 415-1388
References
TAC MD1218
Download: ML062280434 (6)


Text

August 18, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO PRESSURE AND TEMPERATURE CURVES (TAC NO. MD1218)

Dear Mr. Kansler:

By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification pressure and temperature curves.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 60 days.

Sincerely,

/RA/

James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page

August 18, 2006 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO PRESSURE AND TEMPERATURE CURVES (TAC NO. MD1218)

Dear Mr. Kansler:

By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification pressure and temperature curves.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 60 days.

Sincerely,

/RA/

James J. Shea, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDORLLpl1-1 RidsOgcRP LLois LPLI-1 R/F RidsNrrLASLittle RidsAcrsAcnwMailCenter RidsNrrPMJShea RidsNrrDORLDpr RidsRgn1MailCenter Accession Number: ML062280434 OFFICE LPL1-1/PM LPL1-1/LA SBWB/BC LPL1-1/BC NAME JShea SLittle GCranston RLaufer DATE 8/17/06 8/18/06 8/18/06 8/18/06 Official Record Copy

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICAL SPECIFICATION CHANGES TO REVISE PILGRIM PRESSURE AND TEMPERATURE CURVES ENTERGY NUCLEAR OPERATIONS, INC.

PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. (Entergy) submitted an amendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification (TS) pressure and temperature (P-T) curves.

The Nuclear Regulatory Commission staff has been reviewing the submittal and has determined that additional information is needed to complete its review.

In your submittal, you requested TS 3.6.A.2 changes regarding revisions to the P-T limit curves.

The revised P-T limits are based on recalculated vessel fluence values using the RAMA code.

The technical analysis in Section 4 of the submittal gives peak fluence values for 54 effective full-power years (EFPYs) at the 1-338A/C weld and the lower intermediate shell location.

However, the submittal includes curves for 24, 34, 44, and 54 EFPYs of operation for which fluence values are not presented. In addition, the RAMA approval includes limitations regarding the benchmarking of the code. Accordingly, please respond to the following request for additional information:

1. Provide fluence values for the exposure for which you calculate limit P-T curves.
2. Identify the limiting material for each of the exposures if required.
3. Address the RAMA limitations for the Pilgrim application.

Enclosure

Pilgrim Nuclear Power Station cc:

Regional Administrator, Region I Secretary of Public Safety U. S. Nuclear Regulatory Commission Executive Office of Public Safety 475 Allendale Road One Ashburton Place King of Prussia, PA 19406-1415 Boston, MA 02108 Senior Resident Inspector Director, Massachusetts Emergency U. S. Nuclear Regulatory Commission Management Agency Pilgrim Nuclear Power Station Attn: James Muckerheide Post Office Box 867 400 Worcester Road Plymouth, MA 02360 Framingham, MA 01702-5399 Chairman, Board of Selectmen Mr. William D. Meinert 11 Lincoln Street Nuclear Engineer Plymouth, MA 02360 Massachusetts Municipal Wholesale Electric Company Chairman P.O. Box 426 Nuclear Matters Committee Ludlow, MA 01056-0426 Town Hall 11 Lincoln Street Mr. Kevin H. Bronson Plymouth, MA 02360 General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5508 Duxbury, MA 02332 Mr. Michael A. Balduzzi Office of the Commissioner Site Vice President Massachusetts Department of Entergy Nuclear Operations, Inc.

Environmental Protection Pilgrim Nuclear Power Station One Winter Street 600 Rocky Hill Road Boston, MA 02108 Plymouth, MA 02360-5508 Office of the Attorney General Mr. Stephen J. Bethay One Ashburton Place Director, Nuclear Safety Assurance 20th Floor Entergy Nuclear Operations, Inc.

Boston, MA 02108 Pilgrim Nuclear Power Station 600 Rocky Hill Road MA Department of Public Health Plymouth, MA 02360-5508 Radiation Control Program Schrafft Center, Suite 1M2A Mr. Bryan S. Ford 529 Main Street Manager, Licensing Charlestown, MA 02129 Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

Pilgrim Nuclear Power Station cc:

Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Colomb Sr. VP and Chief Operating Officer Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Oscar Limpias Assistant General Counsel Vice President, Engineering Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Ms. Stacey Lousteau Mr. Christopher Schwarz Treasury Department Vice President, Operations Support Entergy Services, Inc.

Entergy Nuclear Operations, Inc. 639 Loyola Avenue 440 Hamilton Avenue New Orleans, LA 70113 White Plains, NY 10601 Mr. James Sniezek Mr. Michael Kansler 5486 Nithsdale Drive President Salisbury, MD 21801-2490 Entergy Nuclear Operations, Inc.

440 Hamilton Avenue Mr. Michael D. Lyster White Plains, NY 10601 5931 Barclay Lane Naples, FL 34110-7306 Mr. John F. McCann Director, Nuclear Safety Assurance Mr. Garrett D. Edwards Entergy Nuclear Operations, Inc. 814 Waverly Road 440 Hamilton Avenue Kennett Square, PA 19348 White Plains, NY 10601