01/30/2008 Slides Used During Dseis Meeting Related to the License Renewal Review of Shearon Harris Nuclear Power Plant
ML080460154
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/30/2008
From:
NRC/NRR/ADRO/DLR
To:
Shared Package
ML080460469 List:
References
Download: ML080460154 (11)


Text

Preliminary Results of the Environmental Review for Shearon Harris Nuclear Power Plant U.S. Nuclear Regulatory Commission January 30, 2008 Purpose of Todays Meeting Discuss the results of environmental review Provide the review schedule Describe how to submit comments in the future Accept oral and written comments today

SHEARON HARRIS Current operating license expires in October 24, 2026.

Application requests authorization to operate Shearon Harris for an additional 20 years.

Environmental Review NRC Decision Application Submitted Draft SEIS to NRC Meetiing Final SEIS Issued Review Scoping Draft SEIS Meeting Issued Audit

Environmental Review National Environmental Policy Act requires Federal agencies to use a systematic approach to consider environmental impacts.

NRC prepares an Environmental Impact Statement (EIS) for all proposed license renewals.

Scope Generic Environmental Impact Statement (GEIS)

Site-specific Supplemental Environmental Impact Statement (SEIS)

Decision Standard for Environmental Review To determine whether or not the adverse environmental impacts of license renewal for Shearon Harris are so great that preserving the option of license renewal for energy planning decisionmakers would be unreasonable.

Information Gathering License Renewal Application NRC Staff Staffs Public Site Audit Comments SEIS State & Local Permitting Agencies Authorities Team Expertise Atmospheric Science Radiation Socioeconomics/ Protection Environmental Justice Terrestrial Land Use Ecology Aquatic Ecology Archaeology/Historical Resources Hydrology

Environmental Impacts of Continued Operation Cooling system Radiological Impacts Threatened or Endangered Species Postulated Accidents Cumulative Impacts How Impacts are Quantified NRC-defined impact levels:

SMALL: Effect is not detectable or too small to destabilize or noticeably alter any important attribute of the resource.

MODERATE: Effect is sufficient to alter noticeably, but not destabilize important attributes of the resource.

LARGE: Effect is clearly noticeable and sufficient to destabilize important attributes of the resource.

Cooling System Impacts Twenty Six Category 1 issues Preliminary findings No new and significant information identified GEIS concluded impacts are SMALL Radiological Impacts Category 1 issues Radiation exposures to the public Occupational radiation exposures Preliminary findings No new and significant information identified GEIS concluded impacts are SMALL

Threatened or Endangered Species Category 2 issue 2 Federal T&E terrestrial species identified as historically occurring on or near Harris site or associated transmission lines Red-cockaded woodpecker Michauxs sumac No aquatic T&E species Preliminary findings Impacts are SMALL on terrestrial T&E species Postulated Accidents Category 1 issues Design-basis accidents Severe Accidents Severe accidents Severe accident mitigation alternatives (SAMAs)

SAMA Evaluation Process Preliminary Findings 22 potential SAMAs considered After screening, number of SAMAs reduced to 20 3 SAMAs are cost-beneficial based on detailed, cost-benefit analysis None of the SAMAs relate to managing the effects of aging; therefore, none are required to be implemented as part of license renewal.

Cumulative Impacts of Operation Considered impacts of renewal term operations combined with other past, present, and reasonably foreseeable future actions.

Evaluated to end of 20-year renewal term.

Preliminary Findings Considered potential construction of New Nuclear Units Impacts could range from SMALL to LARGE

Alternatives No-action (license not renewed)

Conservation Alternative energy sources New generation (Coal, Natural Gas, Nuclear)

Purchased electrical power Other alternatives (Wind, Solar, Wood Waste)

Combination of alternatives Preliminary Findings Environmental impacts of likely power-generation alternatives could reach MODERATE to LARGE significance in some impact areas Impacts of the No-action alternative as well as the Conservation alternative are SMALL for all impact areas Preliminary Conclusions Impacts of license renewal are SMALL for all impact areas.

Impacts of likely power-generation alternatives may reach MODERATE to LARGE in some impact areas.

Impacts of the No-action alternative as well as the Conservation alternative are SMALL for all impact areas The NRC staffs preliminary recommendation is that the environmental impacts of license renewal for Shearon Harris are not so great that license renewal would be unreasonable.

Shearon Harris Environmental Review Milestones Draft Supplemental EIS issued December 11, 2007 Comment Period ends March 5, 2008 Final Supplemental EIS to be issued August 13, 2008 Additional Information Environmental PM: Safety PM:

Samuel Hernandez Maurice Heath (800) 368-5642, Ext. 4049 (800) 368-5642, Ext. 3137 shq@nrc.gov mlh5@nrc.gov The draft SEIS and GEIS can be viewed at:

West Regional Library - 4000 Louis Stephens Dr, Cary Eva H. Perry Library - 2100 Shepherds Vineyard Dr, Apex Online: NRC Reading Room http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1437

Submitting Comments By e-mail: ShearonHarrisEIS@nrc.gov By mail: Chief, Rules and Directives Branch Division of Administrative Services Mailstop T- 6D59 U.S. NRC Washington, DC 20555 In person: 11555 Rockville Pike Rockville, Maryland