Meeting Summary - Shearon Harris - Slide Presentation
ML111100026
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/20/2011
From:
NRC/RGN-II
To:
Shared Package
ML111100021 List:
References
Download: ML111100026 (17)


Text

Shearon Harris Annual Assessment Meeting 2010 Reactor Oversight Process Nuclear Regulatory Commission - Region II Enclosure 2

NRC Strategicg Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials Enclosure 2

Reactor Oversight Process Strategic Performance Areas S f t Safety Cornerstones Baseline Inspection Performance Indicator R

Results lt Results Significance Significance Threshold Threshold Action Matrix Regulatory Response Enclosure 2

Action Matrix Concept Licensee Regulatory Degraded Multiple/R ep. Unacceptable Response Response Cornerstone Degraded Perform ance Cornerstone Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Enclosure 2

Significance g Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safetyy issue Yellow Substantial safety issue Red High safety issue Enclosure 2

National Summary of Plant Performance Status as of 12/31/2010 Licensee Response 89 Regulatory Response 9 Degraded Cornerstone 6 Multiple/Repetitive Deg Deg. Cornerstone 0 Unacceptable 0 Total 104 Enclosure 2

National Summary Performance Indicator Results for 2010*

- Green 7009

- White 23

- Yellow 0

- Red 0

  • PIs are counted per plant per quarter Total Inspection Findings in 2010

- Green 816

- White 9

- Yellow 2

- Red 0 Finding data current as of 3/3/2011 Enclosure 2

NRC Inspection p Activities Shearon Harris Nuclear Plant for 2010 7,389 hours0.0045 days <br />0.108 hours <br />6.431878e-4 weeks <br />1.480145e-4 months <br /> of inspection and related activities 2 resident inspectors on site - residents make four quarterly inspections per year and routinely walk through g the pplant 9 regional inspections 1 major team inspections Modifications - 10 CFR 50.59 Enclosure 2

Shearon Harris Nuclear Plant PIs and Findings 31 2010 January 1 through December 31, All Green Performance Indicators 10 Green inspection findings and 1 Severity Level IV findingg Enclosure 2

NRC Annual Assessment Summary Shearon Harris Nuclear Plant Progress Energy operated the plant safely and in a manner that preserved the public p

health and safetyy and protected the environment.

Shearon Harris Nuclear Plant was in the p

Licensee Response Column of the NRCs ROP Action Matrix for the entire year of 2010.

Enclosure 2

NRC Plans for 2011 NRC plans baseline inspections at Shearon Harris Nuclear Plant for the remainder of 2011. This includes:

Component Design Bases Inspection Problem Identification and Resolution Inspection Triennial Fire Protection Inspection P bli R Public Radiation di ti P Protection t ti IInspection ti In addition, in response to the event at Japan, the residents inspectors are completing temporary instruction, TI-2515/183, Follow-up to the Fukushima Daiichi Nuclear Station Fuel Damage E t Event.

Enclosure 2

Progress Energy Response and Remarks Chris Burton Site Vice-President Shearon Harris Nuclear Plant Enclosure 2

What Do You Think of the ROP???

The biennial ROP external survey is coming 3rd Quarter 2011 and we want to hear from you!

2011, Email ROPsurvey@nrc.gov ROPsurvey@nrc gov to be notified when the ROP survey is available.

For information on ROP stakeholder feedback, please visit our website at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/program-htt // /NRR/OVERSIGHT/ASSESS/

evaluations.html#section3 Enclosure 2

Contacting the NRC Report an emergency (301) 816-5100 (call collect)

Report a safety concern (800) 695-7403 Allegation@nrc.gov G

Generall iinformation f i or questionsi www.nrc.gov S l t Wh Select Whatt W We D Do ffor P Public bli Aff Affairs i

Enclosure 2

NRC Representatives Richard Croteau, Director, Division Reactor Projects (DRP)

(404) 997-4500 William Jones,, Deputy p y Division Director,, DRP (404) 997-4501 Randall Musser, Branch Chief

((404)) 997-4603 Joseph Austin, Senior Resident Inspector (919) 362-0601 Patrick Lessard, Resident Inspector (919) 362-0601 Gerald J. Wilson, Senior Project Engineer (404) 997 997-4613 4613 Jannette G. Worosilo, Project Engineer (404) 997-4485 Brenda Mozafari, Mozafari Project Manager, Manager NRR (301) 415-2020 Enclosure 2

References Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/ind ex.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html P bli D Public Document R Room 1-800-397-4209 ((Toll Free))

Enclosure 2

End of Presentation Nuclear Regulatory Commission Region II Atlanta GA Atlanta, A il 14, April 14 2011 Enclosure 2