Shearon Harris Shearon Harris Annual Assessment Meeting Annual Assessment Meeting 2010 Reactor Oversight Process Nuclear Regulatory Commission Region II Nuclear Regulatory Commission - Region II

NRC Strategic Plan Goals g

Safety Ensure adequate protection of public Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive secure use and management of radioactive materials

Reactor Oversight Process S f t Strategic Performance Areas S f t Strategic Performance Areas Safety Cornerstones Baseline Inspection R

lt Performance Indicator Results Safety Cornerstones Baseline Inspection R

lt Performance Indicator Results Results Significance Threshold Significance Threshold Results Results Significance Threshold Significance Threshold Results Action Matrix Action Matrix Regulatory Response Regulatory Response

Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Unacceptable Performance

Response

Cornerstone Degraded Cornerstone Performance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions

Significance Threshold g

Green Baseline Inspection Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Inspection Findings Green Very low safety issue White Low to moderate safety issue y

Yellow Substantial safety issue Red High safety issue

National Summary of Plant Performance Status as of 12/31/2010 Status as of 12/31/2010 Licensee Response 89 Regulatory Response 9

Regulatory Response 9

Degraded Cornerstone 6

Multiple/Repetitive Deg Cornerstone 0

Multiple/Repetitive Deg. Cornerstone 0

Unacceptable 0

Total 104 Total 104

National Summary Performance Indicator Results for 2010*

- Green 7009

- White 23

- Yellow 0

- Red 0

Red 0

  • PIs are counted per plant per quarter Total Inspection Findings in 2010

- Green 816

- White 9

- Yellow 2

- Yellow 2

- Red 0

Finding data current as of 3/3/2011

NRC Inspection Activities p

Shearon Harris Nuclear Plant for 2010 7,389 hours0.0045 days <br />0.108 hours <br />6.431878e-4 weeks <br />1.480145e-4 months <br /> of inspection and related activities 2 resident inspectors on site residents make 2010 2 resident inspectors on site - residents make four quarterly inspections per year and routinely walk through the plant g

p 9 regional inspections 1 major team inspections Modifications - 10 CFR 50.59

Shearon Harris Nuclear Plant PIs and Findings January 1 through December 31 2010 All Green Performance Indicators January 1 through December 31, 2010 10 Green inspection findings and 1 Severity Level IV finding

NRC Annual Assessment Summary Progress Energy operated the plant safely Shearon Harris Nuclear Plant Progress Energy operated the plant safely and in a manner that preserved the public health and safety and protected the y

p environment.

Shearon Harris Nuclear Plant was in the Licensee Response Column of the NRCs p

ROP Action Matrix for the entire year of 2010.

NRC Plans for 2011 NRC plans baseline inspections at Shearon Harris Nuclear Plant for the remainder of 2011. This includes:

Component Design Bases Inspection Problem Identification and Resolution Inspection Triennial Fire Protection Inspection P bli R di ti P

t ti I

ti Public Radiation Protection Inspection In addition, in response to the event at Japan, the residents inspectors are completing temporary residents inspectors are completing temporary instruction, TI-2515/183, Follow-up to the Fukushima Daiichi Nuclear Station Fuel Damage E

t Event.

Progress Energy Response and Remarks Chris Burton Site Vice-President Shearon Harris Nuclear Plant

What Do You Think of the ROP???

The biennial ROP external survey is coming 3rd Quarter 2011 and we want to hear from you!

2011, and we want to hear from you!

Email ROPsurvey@nrc gov to be notified when the Email ROPsurvey@nrc.gov to be notified when the ROP survey is available.

For information on ROP stakeholder feedback, please visit our website at htt //

/NRR/OVERSIGHT/ASSESS/

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/program-evaluations.html#section3

Contacting the NRC Report an emergency (301) 816-5100 (call collect)

Report a safety concern (800) 695-7403 Allegation@nrc.gov G

l i f i

i General information or questions www.nrc.gov S l t Wh t W D f P bli Aff i Select What We Do for Public Affairs

NRC Representatives Richard Croteau, Director, Division Reactor Projects (DRP)

(404) 997-4500 William Jones, Deputy Division Director, DRP p

y (404) 997-4501 Randall Musser, Branch Chief (404) 997-4603

(

)

Joseph Austin, Senior Resident Inspector (919) 362-0601 Patrick Lessard, Resident Inspector Patrick Lessard, Resident Inspector (919) 362-0601 Gerald J. Wilson, Senior Project Engineer (404) 997-4613 (404) 997 4613 Jannette G. Worosilo, Project Engineer (404) 997-4485 Brenda Mozafari Project Manager NRR Brenda Mozafari, Project Manager, NRR (301) 415-2020

References Sources Reactor Oversight Process http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/ind ex.html Public Electronic Reading Room http://www.nrc.gov/reading-rm.html P bli D R

Public Document Room 1-800-397-4209 (Toll Free)

(

)

End of Presentation End of Presentation Nuclear Regulatory Commission Nuclear Regulatory Commission Region II Atlanta GA Atlanta, GA A

il 14 2011 April 14, 2011