ML20099C999

From kanterella
Jump to navigation Jump to search

Har 2019 Mtg Slides
ML20099C999
Person / Time
Site: Harris, Brunswick  Duke Energy icon.png
Issue date: 04/08/2020
From: Phil Niebaum
NRC/RGN-II/DRP/RPB4
To:
References
Download: ML20099C999 (17)


Text

Shearon Harris Annual Assessment Meeting 2019 Reactor Oversight Process Nuclear Regulatory Commission - Region 2 ML20099C999

Agenda Introductions - Harris Resident Inspectors and Regional Staff Responsible for Oversight Strategic Plan Goals Annual Assessment Summary Findings Performance Indicators NRC Plans for 2020 NCR COVID-19 Response Questions/Answers

Introductions

Resident Inspectors John Zeiler - Senior Resident Inspector Andy Patz - Resident Inspector Regional Personnel Stewart Bailey - Branch Chief Phil Niebaum - Senior Project Engineer Jeffrey Hamman - Senior Project Engineer Donna Jackson - Project Engineer

The NRCs Resident Inspectors

The NRCs Resident Inspectors NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection of the secure use and management of radioactive materials

NRC Annual Assessment Summary Shearon Harris Duke Energy/Harris operated the plant safely and in a manner that preserved public health and safety and protected the environment Harris was in the Licensee Response Column (Column 1) of the NRCs ROP Action Matrix for all of 2019

NRC Inspection Activities Shearon Harris for 2019 Approx. 6000 hours0.0694 days <br />1.667 hours <br />0.00992 weeks <br />0.00228 months <br /> of inspection and related activities Two resident inspectors on site - residents walk through the plant every day and document an inspection report each quarter 5 major team inspections Design Basis Assurance Inspection Problem Identification & Resolution Inspection Emergency Preparedness Exercise Reactor Vessel Head Replacement Inspections Radiological Protection Inspections

Harris PIs and Findings January 1 through December 31, 2019 All Green Performance Indicators 3 Green inspection findings

NRC Inspection Findings Shearon Harris Both Containment Vacuum Relief Trains Inoperable Failure to Develop a Valid Mathematical Model for ASCO Solenoid Valves Failure to Implement Effective Corrective Actions to Preclude Repetition of a Significant Condition Adverse to Quality

Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety or security significance White Low to moderate safety or security significance Yellow Substantial safety or security significance Red High safety or security significance

NRC Inspection Plans for 2020 NRC currently plans baseline inspections at Shearon Harris for the remainder of 2020. This includes:

Design Basis Assurance Inspection Radiological Protection Inspection Problem Identification & Resolution

NRC Response to COVID-19 Mission Critical Functions Monitoring plant activities through inspections and oversight Maintaining emergency response capabilities with Regional IRCs and HQ Risk-informing "eyes on" inspections through residents and regional inspections

NRC Response to COVID-19 Additional Actions Established a COVID-19 Task Force When on site, residents are social distancing as much as possible Dedicated Continuity of Operations Plan available Coordinating actions with industry on best practices to minimize impacts

Getting in Touch with the NRC Website - www.nrc.gov Questions/Information -

OPA2.Resource@nrc.gov or 404-997-4417 Allegations 800-695-7403 Employment - 301-415-7400 or www.usajobs.gov

NRC Social Media

  • GovDelivery:

https://service.govdelivery.com/accounts/USNRC/subscriber/new

Questions?

Nuclear Regulatory Commission Region 2 April 29, 2020