ML102160373
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/28/2010
From: Madden F
Luminant Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CPSES-201001000, TXX-10106
Download: ML102160373 (2)


Text

Rafael Flores Luminant Power Senior Vice President P.O. Box 1002

& Chief Nuclear Officer 6322 North FM 56 rafael.flores@luminant.com Glen Rose, TX 76043 Luminant T 254 897 5209 C 817 559 9085 F 254 897 6652 CPSES-201001000 Ref: 10 CFR 55.40 TXX-10106 July 28, 2010 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, DOCKET NO. 50-445 AND 50-446 OPERATOR LICENSING EXAMINATION DATA

REFERENCE:

NRC Regulatory Information Summary 2010-08, "Preparation and Scheduling of Operator Licensing Examinations"

Dear Sir or Madam:

In response to the referenced letter, enclosed please find a completed NRC Form 536, "Operator Licensing Examination Data," which estimates the number of Luminant Power candidates for examination during CYs 2012 through 2015.

If you have any questions concerning these estimates, please call Mr. Garry W. Struble at (254) 897-6628.

This communication contains no new licensing basis commitments regarding Comanche Peak Nuclear Power Plant Units 1 and 2.

Sincerely, Luminant Generation Company LLC Rafael Flores By: _ _ _ _ _

'Fred W. Madden Director, Oversight and Regulatory Affairs JRW

Enclosure:

NRC Form 536 c- E. E. Collins, Region IV M. Haire, Region IV B. Singal, NRR Resident Inspectors, CPNPP A member of the STARS (Strategic Teaming and Resource Sharing) Alliance i LXI. 3

  • Callaway Comanche Peak . Diablo Canyon - Palo Verde San Onofre South Texas Project Wolf Creek

Enclosure to TXX-10106 NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY 0MB NO 3150-0131 EXPIRES 10/31/2011 (10-2008) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the OPERATOR LICENSING Records and FOIA/Privacy Services Branch (T-5 F53) US Nuclear Regulatory Commission, Washington, DC 20555-0001 or by internet email to EXAMINATION DATA infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-1 0202, (3150-0131), Office of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid 0MB control number, the NRC may not conduct or sponsor, anda person is not required to respond to, the information collection.

FACILITY NRC REGION COMANCHE PEAK NUCLEAR POWER PLANT IV P. 0. BOX 1002 GLEN ROSE, TX 76043 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 12 CY 13 CY 14 CY 15 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY 12 CY 13 CY 14 CY 15 NUMBER OF REACTOR 10 10 10 10 OPERATORS NUMBER OF SENIOR REACTOR 2 3 2 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 6 5 6 5 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE June 2012 March 2013 March 2014 March 2015 ALTERNATE DATE July 2012 April 2013 April 2014 April 2015 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE I

NRC FORM 536 (10-2008) PRINTED ON RECYCLED PAPER