ML111250617

From kanterella
Revision as of 01:06, 13 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IR 05000269-11-010, IR 05550270-11-010, IR 05000287-11-010, on 08/15 - 09/2011, Notification Oconee Nuclear Report
ML111250617
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/04/2011
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Gillespie T
Duke Energy Carolinas
References
IR-11-010
Download: ML111250617 (7)


See also: IR 05000269/2011010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 4, 2011

Mr. T. Preston Gillespie, Jr.

Site Vice President

Duke Energy Carolinas, LLC

Oconee Nuclear Station

7800 Rochester Highway

Seneca, SC 29672

SUBJECT: NOTIFICATION OCONEE NUCLEAR PLANT - COMPONENT DESIGN BASES

INSPECTION - NRC INSPECTION REPORT 05000269,270,287/2011010

Dear Mr. Gillespie:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Oconee Nuclear Power

Plant reactor facility during the period of August 15 - September 30, 2011. The inspection team

will be led by Mr. Patrick Higgins, a Senior Reactor Inspector from the NRC's Region II Office.

This inspection will be conducted in accordance with the baseline inspection procedure,

Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a discussion on April 26, 2011, Mr. Higgins confirmed, with Ms. Judy Smith of your staff,

arrangements for an information gathering site visit and the three-week onsite inspection. The

schedule is as follows:

  • Information gathering visit: July 11 - July 15, 2011
  • Week 1 of onsite inspection: August 29 - September 2, 2011
  • Week 2 of onsite inspection: September 12 - September 16, 2011
  • Week 3 of onsite inspection: September 26 - September 30, 2011

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified and gathered or requested. Mr. Rudolph Bernhard,

Region II Senior Reactor Analyst, may accompany Mr. Higgins during the information gathering

visit to review probabilistic risk assessment data and identify risk significant components which

will be examined during the inspection.

DEC 2

The enclosure lists documents that will be needed prior to the information gathering visit. Please

contact Mr. Higgins with any questions prior to preparing materials listed in the enclosure and

provide the referenced information to the Region II office by June 10, 2011, unless otherwise

noted. The inspectors will try to minimize your administrative burden by specifically identifying

only those documents required for the inspection preparation.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; site, plant and information system access; required

resources; and information exchange protocol.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Higgins at (404) 997-4615 or me at

(404) 997-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-269,270,287

License Nos.: DPR-38,47,55

Enclosure: Information Request for Oconee Nuclear Power Plant Component Design

Bases Inspection

cc w/encl: (See page 3)

DEC 3

cc w/encl: Tom D. Ray

Division of Radiological Health Engineering Manager

TN Dept. of Environment & Conservation Oconee Nuclear Station

401 Church Street Duke Energy Carolinas, LLC

Nashville, TN 37243-1532 Electronic Mail Distribution

David A. Baxter County Supervisor of Oconee County

Vice President, Nuclear Engineering 415 S. Pine Street

Duke Energy Carolinas, LLC Walhalla, SC 29691-2145

Electronic Mail Distribution

W. Lee Cox, III

Kent Alter Section Chief

Regulatory Compliance Manager Radiation Protection Section

Oconee Nuclear Station N.C. Department of Environmental

Duke Energy Carolinas, LLC Commerce & Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

Sandra Threatt, Manager

Nuclear Response and Emergency

Environmental Surveillance

Bureau of Land and Waste Management

Department of Health and Environmental

Control

Electronic Mail Distribution

Scott L. Batson

Station Manager

Oconee Nuclear Station

Duke Energy Carolinas, LLC

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Oconee Nuclear Station

U.S. Nuclear Regulatory Commission

7812B Rochester Hwy

Seneca, SC 29672

Terry L. Patterson

Safety Assurance Manager

Duke Energy Carolinas, LLC

Electronic Mail Distribution

Charles Brinkman

Director

Washington Operations

Westinghouse Electric Company, LLC

Electronic Mail Distribution

_ML111250617________________________ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME P. Higgins B. Desai

DATE 5/4/2011 5/4/2011

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

Letter to Preston Gillespie from Binoy Desai dated May 4, 2011.

SUBJECT: NOTIFICATION OF OCONEE NUCLEAR POWER PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000269,270,287/2011010

Distribution w/encl:

RIDSNRRDIRS

PUBLIC

RidsNrrPMOconee Resource

REQUEST FOR OCONEE NUCLEAR POWER PLANT COMPONENT

DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily understood to

someone who has knowledge of pressurized water reactor technology.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most recent probabilistic safety analysis (PSA) including external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

copies of your human reliability worksheets for these items.

4. Any pre-existing evaluation or list of components and calculations with low design

margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close

to design required output, heat exchangers close to rated design heat removal, MOV risk-

margin rankings, etc.).

5. A list of station applicability evaluations/reviews performed and documented in the station

corrective action program in the past two years for industry events, critical equipment

failures, and safety related equipment vulnerabilities (as communicated by NRC generic

communications, industry communications, 10 CFR Part 21 notifications, etc.).

6. A list of operability evaluations completed within the last two years, sorted by associated

component or system.

7. A list of common-cause failures of components that have occurred at Oconee Nuclear

Power Plant and have been identified within the last five years.

8. A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE

List), including a description of the reason(s) why each component (i.e. not a

programmatic or system level concern) is on that list and summaries (if available) of your

plans to address those reasons.

9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)

status.

10. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.

Enclosure

2

11. Provide two sets of PI&D drawings (11x17) for safety-related systems and two sets of one

line electrical drawings ( 11X17) for safety related systems (for onsite week of July 11-

July 15, 2011)

12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of July 11- July 15,

2011)

13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for

onsite week of July 11- July 15, 2011)

Enclosure