ML12342A257

From kanterella
Revision as of 18:05, 11 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix C, Licensing Basis Evaluations Summary, Page C-1 Through End
ML12342A257
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/30/2012
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
References
ET 12-0032 WCAP-17678-NP, Rev 0
Download: ML12342A257 (90)


Text

C-I APPENDIX C LICENSING BASIS EVALUATIONS

SUMMARY

WCAP-17678-NP November 2012 Revision 0

C-2 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution I EGLT0002 CCW SURGE TK B SWT observed scaffolding in zone of influence Y Licensing Basis Evaluation:

of level transmitter with no bracing or wall SWT received WCNOC Scaffolding anchorage at top bay (3 bays total). Members Evaluation (Scaffold Request # 12-SO 189, appear suitable to withstand moment so as to Work Order # 11-345393 (Reference 24))

preclude collapse, but verification is required that validates scaffold installation in from scaffolding documentation on site. accordance with procedure. SWT concludes from engineering judgment that scaffolding is acceptable given member capacity in bending and light loading due to single bay at the top. No adverse seismic concern.

2 EKJ03B INTERCOOLER SWT could not verify 1-1/4" anchor bolts in Y Licensing Basis Evaluation:

HEAT EXCHANGER field. Verify from CLB documentation. AB-83 bolts verified as 1-1/4" per C-1 C51 11 (Reference 25).

3 FKJ02C KKJO1B AIR SWT could not verify 3/4" double-nutted Y Licensing Basis Evaluation:

INTAKE FILTER anchor bolts in field. Verify from CLB AB-69 anchor bolt verified as 3/4" and documentation. double nutted per C-0033 (Reference 26).

4 GNPT0934 CONTAINMENT Anchorage documentation brought in field was Y Licensing Basis Evaluation:

ATMOSPHERE not sufficient to verify anchorage. Verify SWT received M-771-00048-W04 whether as-installed configuration which was (Reference 27), which calls out 4 no. 3/8" as-built in field consisting of 4 no. 3/8" bolts bolts for mounting. Anchorage configuration meets CLB anchorage configuration is verified.

documentation.

5 KKJO1B STANDBY DIESEL SWT observed an anchor bolt with 10" Y Licensing Basis Evaluation: Operability (GENERATOR) projection whereas 8" required per CLB Evaluation KJ-12-015 (Reference 28) via CR documentation. Verification was required to #57391 determined that the as-installed determine whether condition was previously condition is not in violation of the seismic analyzed or condition is acceptable as- licensing basis given that all bolts undergo installed. zero net uplift under all design load combinations. CR #57391 is tracking this observation.

6 NE002 STANDBY #2 Component is on the common skid with Y Licensing Basis Evaluation:

KKJO1B (rule of the box) and therefore has the See resolution for KKJO1B above.

same anchorage concerns. (see Issue CR #57391 is tracking this observation.

Description for KKJO lB.)

WCAP-17678-NP November 2012 Revision 0

C-3 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 7 NF039B CONT SHED/SEQ Adjacent cabinets are flush. Concern regarding Y Licensing Basis Evaluation:

CH 4 LOGIC potential sensitive equipment changing state SWT review of WCNOC Calculation due to chatter. Check that cabinets are XX-FH-009-002 (Reference 23) confirms attached. that cabinet NF039B and adjacent cabinets NF039A and NF039C have been analyzed for proximity concerns with adjacent cabinets and are therefore acceptable.

8 NG004C 480 VAC Observed 1-7/8" clearance from back of MCC Y Licensing Basis Evaluation:

(drip shield) to concrete wall. There is concern Using a conservative lower bound frequency that the MCC could close the gap in SSE event estimate of 5 Hz, a modal shape factor (SF) and cause equipment to malfunction, of 1.6 for cantilever action, and taking the Verification needed to ensure gap is sufficient peak spectral acceleration of approx. Ig at given MCC flexibility (gap oriented in weak the 2047.5 ft elevation for 3% damping direction) and high elevation of the Aux (conservative), the upper-bound Building (2047.5'). displacement is 6.3 in (= 1.6*386.4 in/s 2

  • lg

/ (2*pi*5 Hz) 2). Therefore, a 1-7/8" gap is acceptable. This conclusion is based on the use of the component displacement equation described on pg 5-1 and obtained from Reference 22.

9 RP08 IA/B SUBCOOLING SWT noted same top support bolting Y Licensing Basis Evaluation:

MONITORING modification as for SB041. Verify whether Condition is analyzed per WCNOC CABINET modification documents the qualification Calculation XX-FH-009-002 (Reference 23).

reconciliation of individual equipment. No adverse seismic concern.

10 SA036E ESFAS CH4 LOGIC Adjacent cabinets are 1/16" apart. Check that Y Licensing Basis Evaluation:

CABINET cabinets are bolted together so as to preclude SWT review of WCNOC Calculation chatter. XX-FH-009-002 (Reference 23) confirms that cabinet SA036E has been analyzed for proximity concerns with adjacent cabinets and is therefore acceptable.

11 SB032C W SS PROT SYS SWT noted a modification to add top support Y Licensing Basis Evaluation:

OUT 1 TRN to fasten SBD32D to SBD33A. Verify whether Condition is analyzed per WCNOC modification documents the qualification Calculation XX-FH-009-002 (Reference 23).

reconciliation of individual equipment. No adverse seismic concern.

WCAP- 17678-NP November 2012 Revision 0

C-4 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 12 SB032D W SS PROT SYS SWT noted a modification to add top support Y Licensing Basis Evaluation:

OUT 2 TRN to fasten SBD32D to SBD33A. Verify whether Condition is analyzed per WCNOC modification documents the qualification Calculation XX-FH-009-002 (Reference 23).

reconciliation of individual equipment. No adverse seismic concern.

13 SB041 W PROCESS 1.) SWT noted cable tray with 1/4" vertical Y Licensing Basis Evaluation:

ANALOG clearance to top of cabinet support 1.) Inspection of vertical response spectra at PROTECTION SET modification. Concern is that differential this level confirms that 1/4" is more than CAB-04 movement between the floors can cause adequate separation for vertically rigid equipment to spatially interact and cause components. No adverse seismic concern.

change of state in SB041. Both pieces can be 2.) Condition is analyzed per WCNOC Calc taken as rigid in the vertical direction. Verify XX-FH-009-002 (Reference 23). No adverse from In-Structure Response Spectra whether seismic concern.

clearance is acceptable.

2.) Cabinets RPO18, SB041, and SB042 are bolted at their tops. This appears to be a modification not included in original equipment qualifications. Verify whether modification documents the qualification reconciliation of individual equipment.

14 SB079 RPV LEVEL INSTR Anchorage documentation brought in field did Y Licensing Basis Evaluation:

SYS PROC PROT not reflect as-installed configuration. Verify Detail 5 on WCNOC Dwg C-0008 SYS whether as-installed configuration which was (Reference 29) indicates an acceptable as-built in field meets CLB anchorage anchorage weld pattern of 3/16" fillet welds, configuration documentation. 2" long at 8" o.c. The as-installed configuration recorded in the field meets this requirement; therefore, there is no adverse seismic condition.

15 SE054B W NUC INSTM NIS 1.) Anchorage documentation brought in field Y 1.) Licensing Basis Evaluation: As-installed 2 did not reflect as-installed configuration. configuration could be verified per NCR Verify whether as-installed configuration ISN21407EW against Dwg C-0008 (Ref.

which was as-built in field meets CLB 22). 2.) Licensing Basis Evaluation:

anchorage configuration documentation. Condition is analyzed per WCNOC Calc 2.) Top of panel is bolted to adjacent panel XX-FH-009-002 (Reference 23). No adverse SD055A. Verify whether bolting modification seismic concern.

reconciled individual equipment qualification.

WCAP- 17678-NP November 2012 Revision 0

C-5 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 16 SGK04B CONTROL ROOM Cannot visually identify 2 interior anchor bolts Y Licensing Basis Evaluation: Follow-up A/C UNITS on N side of AHU. Bolts may be covered in walkdown performed by WCNOC revealed concrete. Action required to verify whether the the interior anchor bolts installed in bolts are present. accordance with configuration documentation. Photographs (located in SWC) were reviewed by the SWT and confirmed to be acceptable. No issue.

17 SGK05B CLASS IE ELEC SWT noted tubing/piping support mounted off Y Licensing Basis Evaluation:

EQUIP A/C/ UNIT of AHU that does not appear to be included in SWT inspected WCNOC DCP #09879 original equipment qualification (possibly.from (Reference 30), which states that the later modification). Verify whether connecting equipment between the more modification is documented and AHU recently installed condenser and the AHU equipment qualification reconciliation was does not invalidate the individual equipment addressed. seismic qualifications and that the qualification of the AHU remains valid.

Therefore, no adverse seismic concern.

18 TEGOIB CCW SURGE SWT observed scaffolding in zone of influence Y Licensing Basis Evaluation:

TANK B of the tank soft targets (site glass) with no SWT received WCNOC Scaffolding bracing or wall anchorage at top bay (3 bays Evaluation (Scaffold Request # 12-S0189, total). Members appear suitable to withstand Work Order # 11-345393 (Reference 24))

moment so as to preclude collapse, but that validates scaffold installation in verification is required from scaffolding accordance with procedure. SWT concludes documentation on site. Also, scaffolding is from engineering judgment that scaffolding braced to tank legs. While the tank legs and is acceptable given negligible additional anchorage appear adequate to withstand loading due to SSE on rugged tank legs.

relatively light added scaffold lateral load, verification is required to confirm equipment qualification for tank was reconciled.

19 XNG02 CLASS IE LOAD SWT observed bolting from XNG02 to Y Licensing Basis Evaluation:

CENTER adjacent and flush cabinet NG002. While it The SWT concluded that the presence of TRANSFORMER was confirmed that adequate bolting was bolting is not required to preclude seismic provided to preclude chatter, one bolt hole was chatter; therefore no adverse seismic noted to be empty without a bolt. Verify condition.

whether bolt is required from configuration documentation.

WCAP-17678-NP November 2012 Revision 0

C-6 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 20 DGB Rm Area Walk-By 1.) SWT noted fire piping is flexibly supported Y Licensing Basis Evaluation:

5201 (rod-hung) with Victaulic couplings. Verify 1.) Per WCNOC Specification M-650 whether 2:1 adequacy from qualification (Reference 31), fire piping in diesel documents. 2.) Noted lighting supported by its generator building is designed for Seismic own conduit spanning horizontally. Concern is Category 2:1 qualifications; therefore no that flexibly support light could overstress adverse seismic condition.

conduit and fall. Verify whether lighting 2.) Re-inspection of photos shows conduit is support is adequate. galvanized rigid conduit, which has significant bending capacity to resist vertical loading of light. No adverse seismic concern.

21 AUX Rm Area Walk-By SWT observed scaffolding in zone of influence Y Licensing Basis Evaluation:

1502 of safety-related equipment with no bracing Or SWT received WCNOC Scaffolding wall anchorage at top bay (3 bays total). Evaluation (Scaffold Request # 12-SO 189, Members appear suitable to withstand Work Order # 11-345393 (Reference 24))

movement so as to preclude collapse, but that validates scaffold installation in verification is required from scaffolding accordance with procedure. No adverse documentation on site. seismic concern.

22 CTRL Rm Area Walk-By Observed portable table approx. 3/4" from N Licensing Basis Evaluation:

3601 control panel. Table could rock and impact the No qualification document was identified to panel. Shift manager indicated that justify presence of table in proximity to Engineering qualified the table for SSE. Verify safety-related control panel equipment.

whether the table has seismic calculation CR #57419 was issued by WCNOC to justifying placement where it was located or determine if the table has been seismically remove to a safe location, evaluated for this location as well as documenting removal of table to a safe location.

23 CTRL Rm Area Walk-By General note for equipment w/ modified top Y Licensing Basis Evaluation:

3605 fasteners added to rigidly connect tops of Bolted connections of cabinets in the control cabinets. Verify whether modifications room area is analyzed per WCNOC reconciled individual equipment qualifications. Calculation XX-FH-009-002 (Reference 23).

No adverse seismic concern.

WCAP- 17678-NP November 2012 Revision 0

C-7 Item Item Tag/ID Component

  1. or Room No. Description Issue Description Status Resolution 24 AUX Rm Area Walk-By Observed vertical HSS cable tray supports Y Licensing Basis Evaluation:

1409 welded to the floor and connected to the ceiling HSS section verified to only react lateral above. Connection at ceiling appears to be a. load at its top connection per Detail 3 on C-jacket connection that only transfers lateral 1408 (Reference 32). Therefore, there is no load. If the ceiling connection transfers vertical adverse seismic condition.

load, there is a concern the support's connections will fail in an SSE event due to differential floor displacement. Verification is required to determine whether either the ceiling connection transfers vertical load or if the support and its connections are designed for the vertical load transfer due to SSE.

KEY:

Y - The Seismic Licensing Basis is satisfied and no adverse seismic condition exists.

N - As a result of the walkdown inspection, a corrective action was required.

WCAP-1 7678-NP November 2012 Revision 0

D-I APPENDIX D PEER REVIEW CHECKLISTS WCAP-17678-NP November 2012 Revision 0

D-2 Sheet 1 of 5 WCNOC Unit I Peer Review Checklist for SWEL Instructions for Completing Checklist This peer review checklist may be used to document the review of the Seismic Walkdown Equipment List (SWEL) in accordance with Section 6: Peer Review. The space below each question in this checklist should be used to describe any findings identified during the peer review process and how the SWEL may have changed to address those findings. Additional space is provided at the end of this checklist for documenting other comments.

1. Were the five safety functions adequately represented in the SWEL 1 selection? YN NEI Requirementmet.

112 Items representing the five safety functions were selected to SWEL 1.

61 Reactivity Control, 63 Pressure Control, 72 Inventory Control, 90 DHR/UHS, 58 Containment Function Remarks:

SWEL Peer Review was held on September 7, 2012 with the following personnel in attendance: WEC SWEL Developers (Dave Bersi Mike Cymbor. Derek Seaman), Peer Review Team (Gary Douglas, Todd Bacon).

WEC (Dave Bersi, Mike Cymbor, Derek Seaman) performed initialscreening; WCNOC Operations(John Weber) provided verification of safety function selections and WCNOC Operations (Eric Carlson) participatedin SWEL selections; WCNOC Engineering (Rick Foust,Bob Kopecky, Tim Solberg) provided technical input to screening and selection of equipment.

The methodology and the development of the SWEL List selections for WCNOC were performed in accordance with Section 3 of the Seismic Walkdown Guidance (EPRI TR-1025286, dated June 2012).

The startingpoint for the development of the SWKIEL was the Individual Plants Examination of External Events (IPEEE)Report, Table 3.6, which listed safe shutdown equipment from each redundant train of the systems supporting the 5 safety functions.

The IPEEE SSEL, 568 items, provideda complete list of all active and passive components associatedwith operationof requiredsupport and frontline systems.

The IPEEE SSEL equipment list was increasedby adding SC-1 items from the Internal Events ProbabilityRisk Assessment (IE-PRA) databaseand comparison with sister plant Callaway that were not alreadyidentified in the IPEEE.

Based on review of "WCNOC Selection of SSCs 9-05-12.xIs" Noted 13 of 739 records that 'screen in' (column R) with no SC-I basis Noted 27 records that support a safety function, but do not screen in to base list Screen outs had been determined after populatinginformation that followed the screening criteriaand needed to be removed. SC-I basis information was inadvertently unpopulatedfor some items.

These items were correctedby the SWEL developers.

WCNOC Unit I Peer Review ChecklisL. for SWEL-20120620 9/7/2012 WCAP-17678-NP November 2012 Revision 0

D-3 Sheet 2 of 5 WCNOC Unit I Peer Review Checklist for SWEL

2. Does SWEL 1 include an appropriate representation of items having the following sample selection attributes:
a. Various types of systems? YZ NEI Requirement met.

38 of 41 base list systems were representedin the SWEL list.

Remarks:

It was recommended that a note be added to explain why components from the GD, GF, and KC systems were not selected.

A note was added to Sort I that states "The GD and GF systems were not selected due to accessibilityissues. This is acceptablesince the GD system consists primarilyof equipment type "other"Which is Well represented. Similarly system GF consists of equipment type "Air Handlers"which is also already well represented.

The KC system was not representedsince it contained only a single valve and containment isolationvalves are already well represented."

b. Major new and replacement equipment? YN N-Requirement met.

52 modified items identified; 16'were representedin SWEL 1.

Remarks:

Indicate the sourceand results for the modifications review.

Provide explanation of the results of review of "recentupgradesand changes" Note 4 was expanded to say "A review of Major New or Replacement equipment was conducted by reviewing the Wolf Creek corrective actions relatedto seismic equipment as well reviewing a databaseof any major capitalprojects since 1998. Since these databasesmay not necessarily contain new or emergent conditions site Operationswas also question to ensure recently modified and upgraded(< I yr) equipment was reviewed."

c. Various types of equipment? YZ NE Requirement met.

19 of the 22 equipment types were representedin S WEL 1.

3 equipment types not represented were not safety-related items.

Remarks:

Three EPRI equipment types were not represented: Chillers, Air Compressors,and Motor-GeneratorSets. Provide a reason for inability to select these types.

Sort 3 added a note stating "Discussionwith Operationsrevealed that Wolf Creek does not have any SC-I Chillers, Air Compressors or Motor Generators."

WCNOC Unit 1 Peer Review Checklist for SWEL-20120620 9/7/2012 WCAP-1 7678-NP November 2012 Revision 0

D-4 Sheet 3 of 5 WCNOC Unit I Peer Review Checklist for SWEL

d. Various environments? YE NM Requirement met.

The range of room environments and inside/outsidelocations was representedin SWEL 1.

Remarks:

The Wolf Creek Environmental Classificationsare based on room temperature and humidity presentedin USAR Table 3.11(B)-1.

e. Equipment enhanced based on the findings of the IPEEE (or equivalent) program? Y[D NE-]

Requirement met.

3 of 8 IPEEE findings are represented on SWEL 1.

Remarks:

Battery ChargerNNOI I was not selected to S VVEL I because of inaccessibility.

This item is cited in an IPEEE Finding: A transformer on an inverter was not bolted to the frame on one side (WR 2857-94).

Recommend providing additionaldetailjustifying selection of other battery chargers over NNOI 1.

A comment was added stating "NN01I1 was not selected due to it not being scheduled to be worked on in the nearfuture and due to safety considerationsan availablebattery chargerwas selected instead"

f. Were risk insights considered in the development of SVEL 1? Y[ NEI Requirement met.

Risk insightsfrom the Internal Events models were consideredin the SWEL selections and are clearly indicatedon the spreadsheet.The Risk Achievement Worth (RA W) derivedfrom the WCNOC internal events PRA model were compiled for the Base List 1 items to determine potentially risk-significantSSCs (RAW> 2).

The maximum risk between internalevents and the seismic RAW values was used in the SWEL selection process. The Base List 1 items were sortedin the SWEL spreadsheetin the orderof descending maximum RAW values (Worksheet "Sort 5). 27 of the 67 risk significant SSCs from Base List 1 were selected for SWEL 1.

WCNOC Unit I Peer Review Checklist for SWEL-20120620 9/7/2012 WCAP-17678-NP November 2012 Revision 0

D-5 Sheet 4 of 5 WCNOC Unit I Peer Review Checklist for SWEL

3. For SWEL 2:
a. Were spent fuel pool related items considered, and if applicable included in YE NEI SWEL 2?

Requirement met.

Spent Fuel Pool equipment that passed screen 2 and are part of Train B were selected (since Wolf Creek Train A will be unavailable during the scheduled seismic walkdown).

This resulted in 5 items added to the S WEL.

Remarks:

The starting list of SFP SC-I equipment was based on the DBM descriptions,piping and instrumentationdrawings (P&IDs), and isometrics.

An analysis of the SFPfor Rapid Drain-Down considerationswas performed. Pool connections to the spent fuel pool, fuel transfer canal, and wet cask pit were verified by a review of the spent fuel pool P&lDs, piping isometrics, civil and structural drawings, and FSAR sections 9.1.2 and 9.1.3. The fuel pool cooling P&ID shows several connections to the pool with anti-siphoningholes present per notes. The currentdesign drawings (includingpiping isometrics) were reviewed and support the assertions in the FSAR concerning pool drain-downprotection.

No Rapid Drain-Downitems were identified for input to S WEL 2.

b. Was an appropriate justification documented for spent fuel pool related items not YO NEI included in SWEL 2?

Requirement met.

The Spent Fuel Pool equipment selected is part of Train B (since Wolf Creek Train A will be unavailableduring the scheduled seismic walkdown).

Action taken to meet requirement:

Indicate the source and results for the modifications review.

Need explanationof the results of review of "recentupgrades and changes" Note 5 revised to state 'Spent Fuel Pool equipment that passed screen 2 and arepart of Train B were selected (since Wolf Creek Train A will be unavailableduring the scheduled seismic walkdown). Note that operations did not note any major modification or changes to the spent fuel pool SC-I items. "

WCNOC Unit I Peer Review Checklist for SWEL-201 20620 9/7/2012 WCAP-17678-NP November 2012 Revision 0

D-6 Sheet 5 of 5 WCNOC Unit I Peer Review Checklist for SWEL 4, Provide any other comments related to the peer review of the SWELs.

SWEL PeerReview was held on September 7, 2012.

Sampling considerationsfor system variety, equipment type variety, environment variety, new or replacement items, and IPEEE enhancements were reviewed and verified to be adequatelyrepresentedin the SWEL.

S. Have all peer review comments been adequately addressed in the final SWEL? Y NO Peer Reviewer # 1: Gary L. Douglas . Date: 9/7/12 Peer Reviewer #2: Todd Bacon Date: 9/7/12 WCNOC UnijI Peer Review~ Chiecklist 1orSWIiL.-20120620 9/7/2U12 November 2012 WCAP-17678-NP Revision 0

E-1 APPENDIX E BASE LIST 1 WCAP-17678-NP November 2012 Revision 0

E-2 Wolf Creek Base List I Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support('°)

I ABHV0005 MAIN STM LOOP 2 TO TDAFW PUMP AUX Yes Yes DHR 2 ABHV0006 MAIN STM LOOP 3 AFWP TURBINE ISO AUX Yes Yes DHR 3 ABHVOOI LOOP-4 MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 4 ABHV0014 LOOP-I MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 5 ABHVOO17 LOOP-2 MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 6 ABHV0020 LOOP-3 MAIN STEAM ISOLATION VALVE AUX Yes Yes PC DHR 7 ABPTOOO1 STM GEN A STEAMLINE PRESSURE AUX Yes Yes PC DHR 8 ABPT0002 STM GEN B STEAMLINE PRESSURE AUX Yes Yes PC DHR 9 ABPT0003 STM GEN C STEAMLINE PRESSURE AUX Yes Yes PC DHR 10 ABPT0004 STM GEN D STEAMLINE PRESSURE AUX Yes Yes PC DHR 11 ABPT0514 STEAM GEN A PRESSURE TRANSMITTER AUX Yes Yes RC PC 12 ABPT0515 STEAM GEN A PRESSURE TRANSMITTER AUX Yes Yes RC PC 13 ABPT0516 STEAM GEN A PRESSURE TRANSMITTER AUX Yes Yes RC PC 14 ABPT0524 STEAM GEN B PRESSURE TRANSMITTER AUX Yes Yes RC PC 15 ABPT0525 STEAM GEN B PRESSURE TRANSMITTER AUX Yes Yes RC PC 16 ABPT0526 STEAM GEN B PRESSURE TRANSMITTER AUX Yes Yes RC PC 17 ABPT0534 STEAM GEN C PRESSURE TRANSMITTER AUX Yes Yes RC PC 18 ABPT0535 STEAM GEN C PRESSURE TRANSMITTER AUX Yes Yes RC PC 19 ABPT0536 STEAM GEN C PRESSURE TRANSMITTER AUX Yes Yes RC PC 20 ABPT0544 STEAM GEN D PRESSURE TRANSMITTER AUX Yes Yes RC PC WCAP- 17678-NP November 2012 Revision 0

E-3 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2 ) Basis?) (Screens In?) Support())

21 ABPT0545 STEAM GEN D PRESSURE TRANSMITTER AUX Yes Yes RC PC 22 ABPT0546 STEAM GEN D PRESSURE TRANSMITTER AUX Yes Yes RC PC 23 ABPV0001 SG A ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 24 ABPV0002 SG B ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 25 ABPV0003 SG C ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 26 ABPV0004 SG D ATMOSPHERIC RELIEF VLV AUX Yes Yes PC DHR 27 AEFV0039 EBB30A FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 28 AEFV0040 EBB30B FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 29 AEFV0041 EBB30C FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 30 AEFV0042 EBBO0D FEEDWATER ISOLATION VALVE AUX Yes Yes PC DHR 31 AELT0501 STM GEN A WIDE RANGE RB Yes Yes PC DHR 32 AELT0502 STM GEN B WIDE RANGE RB Yes Yes PC DHR 33 AELT0503 STM GEN C WIDE RANGE RB Yes Yes PC DHR 34 AELT0504 SG D WIDE RANGE (SG LVL L/4 CH TEST RB Yes Yes PC DHR CARD) 35 AELT0517 STM GEN LEVEL A NARROW RANGE RB Yes Yes PC DHR 36 AELT0518 STM GEN LEVEL A NARROW RANGE RB Yes Yes PC DHR 37 AELT0519 STM GEN LEVEL A NARROW RANGE RB Yes Yes PC DHR 38 AELT0527 STM GEN B LEVEL RB Yes Yes PC DHR 39 AELT0528 STM GEN B NARROW RNG LEVEL RB Yes Yes PC DHR WCAP-17678-NP November 2012 Revision 0

E-4 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

40 AELT0529 STM GEN LEVEL B NARROW RANGE RB Yes Yes PC DHR 41 AELT0537 STM GEN LEVEL C NARROW RANGE RB Yes Yes PC DHR 42 AELT0538 STM GEN LEVEL C NARROW RANGE RB Yes Yes PC DHR 43 AELT0539 STM GEN LEVEL C NARROW RANGE RB Yes Yes PC DHR 44 AELT0547 STM GEN LEVEL D NARROW RANGE RB Yes Yes PC DHR 45 AELT0548 STM GEN D NARROW RNG LEVEL RB Yes Yes PC DHR 46 AELT0549 STM GEN LEVEL D NARROW RANGE RB Yes Yes PC DHR 47 AELT0551 STM GEN A LEVEL RB Yes Yes PC DHR 48 AELT0552 STM GEN B LEVEL RB Yes Yes PC DHR 49 AELT0553 STM GEN C LEVEL RB Yes Yes PC DHR 50 AELT0554 STM GEN D LEVEL RB Yes Yes PC DHR 51 -ALFTOOOI AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 52 ALFT0002 AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 53 ALFT0003 AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 54 ALFT0004 AFW TO SG D FLOW TRANSMITTER AUX Yes Yes PC DHR 55 ALFT0007 AUX FDW FLO TO SG A AUX Yes Yes PC DHR 56 ALFT0009 AUX FDW FLO TO SG B AUX Yes Yes PC DHR 57 ALFTOO1 1 AUX FDW FLO TO SGC AUX Yes Yes PC DHR 58 ALHV0005 MTR DRIV AFWP DISCH HDR TO SG D ISO AUX Yes Yes PC DHR VLV WCAP- 17678-NP November 2012 Revision 0

E-5 Wolf Creek Base List 1 (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

59 ALHV0006 TURB DRIVEN AFWP DISCH HDR TO SG D AUX Yes Yes PC DHR ISO 60 ALHV0007 MTR DRIV AFWP DISCH HDR TO SG A ISO AUX Yes Yes PC DHR VLV 61 ALHV0008 TURB DRIVEN AFWP DISCH HDR TO SG A AUX Yes Yes PC DHR ISO 62 ALHV0009 MTR DRIV AFWP DISCH HDR TO SG B ISO AUX Yes Yes PC DHR VLV 63 ALHVOO1O TURB DRIVEN AFWP DISCH HDR TO SG B AUX Yes Yes PC DHR ISO 64 ALHVOO1 1 MTR DRIV AFWP DISCH HDR TO SG G ISO AUX Yes Yes PC DHR VLV 65 ALHV0012 TURB DRIVEN AFWP DISCH HDR TO SG C AUX Yes Yes PC DHR ISO 66 ALHV0030 ESW TO MDAFW PUMP B 6" BTFL VLV AUX Yes Yes PC DHR W/LIMITQ 67 ALHV0031 ESW TO MDAFW PUMP A 6" BTFL VLV AUX Yes Yes PC DHR W/LIMITQ 68 ALHV0032 ESW SUPPLY TO PAL02 8" BTFL VLV AUX Yes Yes PC DHR W/LIMITQ 69 ALHV0033 ESW TO TDAFW PUMP 8" BTFL VALVE AUX Yes Yes PC DHR W/LIMITQ 70 ALHV0034 COND STOR TK TO MD AUX FW PUMP B 8" AUX Yes Yes PC DHR GATE VALVE WCAP- 17678-NP November 2012 Revision 0

E-6 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building( 2) Basis?) (Screens In?) Support(])

71 ALHV0035 CONDENSATE STOR TO AUX FW PUMP A AUX Yes Yes PC DHR 8" GATE VALVE 72 ALHV0036 CONDENSATE STOR TO TD AUX FW PUMP AUX Yes Yes PC DHR 10" GATE VALVE 73 ALPT0025 AFP SUCTION PRESSURE TRANSMITTER AUX Yes Yes PC DHR (2) 74 ALPT0026 AFP SUCTION PRESSURE TRANSMITTER AUX Yes Yes PC DHR (4) 75 ALPT0037 ESFAS AFW LOW SUCTION PRESS AUX Yes Yes PC DHR TRANSMITTER 76 ALPT0038 ESFAS AFW LOW SUCTION PRESS AUX Yes Yes PC DHR TRANSMITTER 77 ALPT0039 ESFAS AFW LOW SUCTION PRESS AUX Yes Yes PC DHR TRANSMITTER 78 BB004A W THERMOCOUPLE REF-JCT I RB Yes Yes DHR 79 BB004B W THERMOCOUPLE JUNCTION BOX-JCT 2 RB Yes Yes DHR 80 BB007 DC CONTACT CABINET AUX Yes Yes PC DHR 81 BB008 DC CONTACT CABINET AUX Yes Yes PC DHR 82 BBHV8000A PZR POWER RELIEF PCV-455A INLET ISO RB Yes Yes PC DHR 83 BBHV8000B PZR POWER RELIEF PCV-456A INLET ISO RB Yes Yes PC DHR 84 BBLIS 1311 RV SUBCOOLING MONITOR TRN A AUX Yes Yes RC 85 BBLIS1312 RV SUBCOOLING MONITOR TRN A AUX Yes Yes RC 86 BBLIS1321 RV SUBCOOLING MONITOR TRN B AUX Yes Yes RC WCAP- 17678-NP November 2012 Revision 0

E-7 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

87 BBLIS1322 RV SUBCOOLING MONITOR TRN B AUX Yes Yes RC 88 BBLT0459 PRESS LEVEL (NARROW RANGE) RB Yes Yes IC 89 BBLT0460 PRESS LEVEL (NARROW RANGE) RB Yes Yes IC 90 BBLT0461 PRESS LEVEL (NARROW RANGE) RB Yes Yes IC 91 BBLT0462 PRESS LEVEL (WIDE RANGE) RB Yes Yes IC 92 BBPCV0455A PZR POWER OPERATED RELIEF VALVE RB Yes Yes PC DHR 93 BBPCV0456A PZR POWER OPERATED RELIEF VALVE RB Yes Yes PC DHR 94 BBPT0403 RCS WIDE RANGE PR XMTR AUX Yes Yes PC 95 BBPT0405 RCS WR PRESSURE TRANSMITTER AUX Yes Yes PC 96 BBPT0455 PRESSURIZER PRESSURE RB Yes Yes PC 97 BBPT0456 PRESSURIZER PRESSURE RB Yes Yes PC 98 BBPT0457 PRESSURIZER PRESSURE RB Yes Yes PC 99 BBPT0458 PRESSURIZER PRESSURE RB Yes Yes PC 100 BBPV8702A RCS HOT LEG 1 TO RHR PUMP A SUCTION RB Yes Yes DHR 101 BBPV8702B RCS HOT LEG 4 TO RHR PUMP B SUCTION RB Yes Yes DHR 102 BBTE0413A REC COOLANT LP 1 HOT LEG RB Yes Yes DHR 103 BBTE0413B REC COOLANT LP 1 COLD LEG RB Yes Yes DHR 104 BBTE0423A REC COOLANT LP 2 HOT LEG RB Yes Yes DHR 105 BBTE0423B REC COOLANT LP 2 COLD LEG RB Yes Yes DHR 106 BBTE0433A REC COOLANT LP 3 HOT LEG RB Yes Yes DHR WCAP- 17678-NP November 2012 Revision 0

E-8 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building2 Basis?) (Screens In?) Support(')

107 BBTE0433B REC COOLANT LP 3 COLD LEG RB Yes Yes DHR 108 BBTE0443A REC COOLANT LP 4 HOT LEG RB Yes Yes DHR 109 BBTE0443B REC COOLANT LP 4 COLD LEG RB Yes Yes DHR 110 BGFCV0 121 CENTRIFUGAL CHG PMP FLOW CONTROL AUX Yes Yes RC PC IC 111 BGFT215A TOTAL SEAL INJECTION FLOW AUX Yes Yes IC TRANSMITTER (4) 112 BGFT215B TOTAL SEAL INJECTION FLOW AUX Yes Yes IC TRANSMITTER (2) 113 BGHV8100 SEAL WATER RETURN CONTAINMENT ISO AUX Yes Yes IC VLV 114 BGHV8105 CHARGING PUMPS TO REGEN HX/CTMT AUX Yes Yes PC IC CF ISO 115 BGHV8106 CHARGING PUMPS TO REGENERATIVE HX AUX Yes Yes PC IC ISO 116 BGHV8 110 CHARGING PUMPS MINIMUM FLOW VLV AUX Yes Yes RC IC 117 BGHV81 11 CHARGING PUMPS MINIMUM FLOW VLV AUX Yes Yes RC IC 118 BGHV8112 SEAL WATER RETURN CTMT ISO VLV RB Yes Yes IC CF 119 BGHV8152 LETDOWN SYSTEM CONTAINMENT ISO AUX Yes Yes IC CF VLV 120 BGHV8160 LETDOWN SYSTEM CONTAINMENT ISO RB Yes Yes IC CF VLV 121 BGLCV0I 12B VCT LOW LEVEL ISO GATE VALVE ON AUX Yes Yes RC IC BG020HCB-4 WCAP-17678-NP November 2012 Revision 0

E-9 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

122 BGLCVOI 12C VCT LOW LEVEL ISO GATE VALVE ON AUX Yes Yes RC IC BG020HCB-4 123 BLHV8047 REACTOR M/U WATER CONTAINMENT ISO AUX Yes Yes IC CF 124 BMHV000I SG A BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 125 BMHV0002 SG B BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 126 BMHV0003 SG C BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 127 BMHV0004 SG D BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF 128 BNHV0003 RWST SUPPLY TO CTMT SPRAY PUMP B AUX Yes Yes CF 129 BNHV0004 RWST SUPPLY TO CTMT SPRAY PUMP A AUX Yes Yes CF 130 BNHV8806A RWST TO SAFETY INJ PUMP SUCTION AUX Yes Yes IC DHR 131 BNHV8806B RWST TO SAFETY INJ PUMP SUCTION AUX Yes Yes IC DHR 132 BNHV8812A RWST TO RHR PUMP A SUCTION AUX Yes Yes IC DHR 133 BNHV8812B RWST TO RHR PUMP B SUCTION AUX Yes Yes IC DHR 134 BNHV8813 SAFETY INJECTION TO RWST ISOLATION AUX Yes Yes IC DHR VLV 135 BNLCVO0 12D CHARGING PUMPS SUCTION FROM RWST AUX Yes Yes RC IC 136 BNLCVOl 12E CHARGING PUMPS SUCTION FROM RWST AUX Yes Yes RC IC 137 BNLT0930 RWST LEVEL TRANSMITTER (1) YRD Yes Yes RC IC DHR 138 BNLT0931 RWST LEVEL TRANSMITTER (2) YRD Yes Yes RC IC DHR 139 BNLT0932 RWST LEVEL TRANSMITTER (3) YRD Yes Yes RC IC DHR 140 BNLT0933 RWST LEVEL TRANSMITTER (4) YRD Yes Yes RC IC DHR WCAP-17678-NP November 2012 Revision 0

E-10 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2( Basis?) (Screens In?) Support(")

141 BNVOOI 1 RWST OUTLET ISO VALVE AUX Yes Yes RC IC DHR 142 CGDO1A ESW PUMP HOUSE SUPPLY FAN ESW Yes Yes RC PC IC DHR 143 CGDO1B ESW PUMP HOUSE SUPPLY FAN ESW Yes Yes RC PC IC DHR 144 CGMO1A DIESEL GENERATOR BLDG SUPPLY FAN DGB Yes Yes RC PC IC DHR 145 CGMO1B DIESEL GENERATOR BLDG SUPPLY FAN DGB Yes Yes RC PC IC DHR 146 EBGO1 LETDOWN HEAT EXCHANGER AUX Yes Yes DHR 147 EBG02 EXCESS LETDOWN HEAT EXCHANGER R Yes Yes DHR 148 EBG03 SEAL WATER HEAT EXCHANGER AUX Yes Yes PC IC 149 EEGO1A COMPONENT COOL WATER HEAT AUX Yes Yes RC PC IC DHR EXCHANGER 150 EEGO1B COMPONENT COOL WATER HEAT AUX Yes Yes RC PC IC DHR EXCHANGER 151 EEJOIA RESIDUAL HEAT REMOVAL HEAT AUX Yes Yes DHR EXCHANGER 152 EEJO1B RESIDUAL HEAT REMOVAL HEAT AUX Yes Yes DHR EXCHANGER 153 EFI55 ESW CONTROL PANEL ESW Yes Yes RC PC IC DHR CF 154 EF 156 ESW CONTROL PANEL ESW Yes Yes RC PC IC DHR CF 155 EFFE0053 ESW A FLO TO POWER BLOCK CB Yes Yes RC PC IC DHR CF 156 EFFE0054 ESW B FLO TO POWER BLOCK CB Yes Yes RC PC IC DHR CF 157 EFFT053 ESW PUMP A DISCHARGE FLOW CB/CC Yes Yes RC PC IC DHR CF TRANSMITTER WCAP- 17678-NP November 2012 Revision 0

E-11 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"')

158 EFFT054 ESW PUMP B DISCHARGE FLOW CB/CC Yes Yes RC PC IC DHR CF TRANSMITTER 159 EFHV0023 ESW A/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 160 EFHV0024 ESW B/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 161 EFHV0025 ESW A/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 162 EFHV0026 ESW B/SERVICE WATER CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 163 EFHV0031 ESW A TO CTMT AIR COOLERS BUTT VLV AUX Yes Yes RC PC IC DHR CF 164 EFHV0032 ESW B TO CTMT AIR COOLERS AUX Yes Yes RC PC IC DHR CF BUTTERFLY VALVE 165 EFHV0033 ESW A TO CTMT AIR COOLERS RB Yes Yes RC PC IC DHR CF BUTTERFLY VLV 166 EFHV0034 ESW B T CTMT AIR COOLERS BUTTERFLY RB Yes Yes RC PC IC DHR CF VLV 167 EFHV0037 ESW A TO UNTIMATE HEAT SINK CB/CC Yes Yes RC PC IC DHR CF THROTTLED 168 EFHV0038 ESW B TO ULTIMATE HEAT SINK CB/CC Yes Yes RC PC IC DHR CF 169 EFHV0039 ESW TRAIN A TO SW CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE 170 EFHV0040 ESW TRAIN B TO SW CROSS CONNECT CB/CC Yes Yes RC PC IC DHR CF VALVE November 2012 WCAP- 17678-NP November 2012 Revision 0

E-12 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building2( Basis?) (Screens In?) Support(")

171 EFHV0041 ESW TRAIN A TO SW CROSS CONNECT Yes Yes RC PC IC DHR CF VALVE 172 EFHV0042 ESW TRAIN B TO SW CROSS CONNECT Yes Yes RC PC IC DHR CF VALVE 173 EFHV0043 ESW TRAIN A TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF VALVE 174 EFHV0044 ESW TRAIN B TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF VALVE 175 EFHV0045 ESW A FROM CTMT AIR COOLERS RB Yes Yes RC PC IC DHR CF BUTTERFLY VLV 176 EFHV0046 ESW B FROM CTMT AIR COOLERS RB Yes Yes RC PC IC DHR CF BUTTERFLY VLV 177 EFHV0047 ESW A FROM CTMT AIR COOLERS BYP AUX Yes Yes RC PC IC DHR CF BUTTERFLY VALVE 178 EFHV0048 ESW A FROM CTMT AIR CLRS BYP AUX Yes Yes RCPC IC DHR CF BUTTERFLY VALVE 179 EFHV0049 ESW A FROM CTMT AIR CLRS BUTT VLV AUX Yes Yes RC PC IC DHR CF 180 EFHV0050 ESW B FROM CTMT AIR COOLERS AUX Yes Yes RC PC IC DHR CF BUTTERFLY VALVE 181 EFHV0051 ESW A TO CCW HX A AUX Yes Yes RC PC IC DHR CF 182 EFHV0052 ESW B TO CCW HX B AUX Yes Yes RC PC IC DHR CF 183 EFHV0059 ESW TRAIN A FROM CCW HX ISO VALVE AUX Yes Yes RC PC IC DHR CF 184 EFHV0060 ESW TRAIN B FROM CCW HX ISO VALVE AUX Yes Yes RC PC IC DHR CF 185 EFHV0091 ESW SCREEN A SPRAY VALVE ESW Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-13 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"1*)

186 EFHV0092 ESW SCREEN B SPRAY VALVE ESW Yes Yes RC PC IC DHR CF 187 EFHV0097 ESW PUMP A DISCHARGE RECIRC VALVE ESW Yes Yes RC PC IC DHR CF 188 EFHV0098 ESW PUMP B DISCHARGE AIR RELEASE ESW Yes Yes RC PC IC DHR CF VALVE 189 EFPDT0019 ESW 2A SELF-CLN STR DIFF PRES YARD Yes Yes RC PC IC DHR CF 190 EFPDT0020 ESW 2B SELF-CLN STR DIFF PRES YARD Yes- Yes RC-PC-IC-DHR CF 191 EFPDT0043 ESW TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF 192 EFPDT0044 ESW TO AIR COMPRESSOR ISO AUX Yes Yes RC PC IC DHR CF 193 EFPDVO019 ESW SELF-CLEANING STRAINER A TRASH ESW Yes Yes RC PC IC DHR CF VLV 194 EFPDVO020 ESW SELF-CLEANING STRAINER B TRASH ESW Yes Yes RC PC IC DHR CF VLV 195 EFPTOOOI ESW PUMP DISCHARGE ESW Yes Yes RC PC IC DHR CF 196 EFPT0002 ESW PUMP DISCHARGE ESW Yes Yes RC PC IC DHR CF 197 EFTE0061 ESW A TEMP TO POWER BLOCK CB/CC Yes Yes RC PC IC DHR CF 198 EFTE0062 ESW B TEMPT TO POWER BLOCK CB/CC Yes Yes RC PC IC DHR CF 199 EGFT0062 RCP OUT FLOW AUX Yes Yes IC 200 EGFT128 CCW HX OUTLET TO RCP BYPASS AUX Yes Yes DHR 201 EGFT129 CCW HX OUTLET TO RCP BYPASS AUX Yes Yes DHR 202 EGHV00I I ESW TO CCW TRAIN A PMP SUCT ISO AUX Yes Yes DHR 203 EGHV0012 ESW MAKE-UP TO CCW SYS NG04CJF1 AUX Yes Yes DHR WCAP-17678-NP November 2012 Revision 0

E-14 Wolf Creek Base List I (cont.)

Base List 1 Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

204 EGHV0013 ESW TO CCW TRAIN A PMP SUCT ISO AUX Yes Yes DHR 205 EGHV0014 ESW MAKE-UP TO CCW SYS NG04CJF2 AUX Yes Yes DHR 206 EGHV0015 CCW TRAIN A RETURN ISO VALVE AUX Yes Yes DHR 207 EGHV0016 CCW TRAIN B RETURN ISO VALVE AUX Yes Yes DHR 208 EGHV0053 CCW TRAIN A SUPPLY ISO VALVE AUX Yes Yes DHR 209 EGHV0054 CCW TRAIN B SUPPLY ISO VALVE AUX Yes Yes DHR 210 EGHV0058 CCW TO RCS ISO AUX Yes Yes DHR 211 EGHV0059 CCW RETURN FROM RCS ISO AUX Yes Yes DHR 212 EGHV0060 CCW RETURN FOR RCS ISO RB Yes Yes DHR 213 EGHV0061 CCW RETURN FROM RCS ISO AUX Yes Yes DHR 214 EGHV0062 CCW RETURN FROM RCS ISO RB Yes Yes DHR 215 EGHV0069A CCW SUPLY TO RADWST BLDG ISO AUX Yes Yes DHR BTTFLY VLV 216 EGHV0069B RADWST BLDG CCW RETN HDR ISO AUX Yes Yes DHR BTTFLY VLV 217 EGHV0070A CCW SUPLY TO RADWST BLDG ISO AUX Yes Yes DHR BTTFLY VLV 218 EGHV0070B RADWST BLDG CCW RETN HDR ISO AUX Yes Yes DHR BTTFLY VLV 219 EGHV0071 CCW TO RCS ISO AUX Yes Yes DHR 220 EGHV0101 CCW TO RHR HX A ISO AUX Yes Yes DHR 221 EGHVO 102 CCW TO RHR HX B ISO AUX Yes Yes DHR WCAP-17678-NP November 2012 Revision 0

E-15 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2 ) Basis?) (Screens In?) Support('")

222 EGLT0001 CCW SURGE TK A AUX Yes Yes DHR 223 EGLT0002 CCW SURGE TK B AUX Yes Yes DHR 224 EGPT0077 CCW PMPS A&C DISCH PRESS AUX Yes Yes DHR 225 EGPT0078 CCW PMPS B&D DISCH PRESS AUX Yes Yes DHR 226 EGTE0031 CCW HX A OUTLET TEMP AUX Yes Yes RC DHR 227 EGTE0032 CCW HX B OUTLET TEMP AUX Yes Yes RC DHR 228 EGTV0029 CCW HX A TEMP CV WAFER BTFFLY VLV AUX Yes Yes RC DHR 229 EGTV0030 CCW HX B TEMP CV WAFER BTTFLY VLV AUX Yes Yes RC DHR 230 EHBO1 REACTOR COOLANT DRAIN TANK HX RB Yes Yes IC 231 EJFCV0610 RIHR PUMP A MINIFLOW VALVE AUX Yes Yes DHR 232 EJFCV0611 RHR PUMP B MINIFLOW VALVE AUX Yes Yes DHR 233 EJFCV0618 RHR HX A BYPASS AUX Yes Yes DHR 234 EJFCV0619 RHR HX B BYPASS AUX Yes Yes DHR 235 EJFIS0610 RHR PMP IA MINIFLOW CONTROL AUX Yes Yes DHR DISCHARGE 236 EJFIS0611 RHR PMP PEJOIB MINIFLOW CONTROL AUX Yes Yes DHR DISCHARGE 237 EJHCV0606 RHR HX A OUTLET ISO AUX Yes Yes DHR 238 EJHCV0607 RHR HX B OUTLET ISO AUX Yes Yes DHR 239 EJHV8701A RCS HOT LEG I TO RHR PUMP A SUCTION RB Yes Yes DHR 240 EJHV8701B RCS HOT LEG 4 TO RHR PUMP B SUCTION RB Yes Yes DHR WCAP- 17678-NP November 2012 Revision 0

E-16 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

241 EJHV8716A RHR A TO SIS HOT LEG RECIRC LOOPS 2 AUX Yes Yes DHR

& 3 ISO 242 EJHV8716B RHR B TO SIS HOT LEG RECIRC LOOPS 2 AUX Yes Yes DHR

& 3 ISO 243 EJHV8804A RHR A TO CVCS CCP ISO AUX Yes Yes DHR 244 EJHV8804B RHR SUPPLY TO SI PUMP B ISO VALVE AUX Yes Yes DHR 245 EJHV8809A RHR TO ACCUM INJ LOOPS 1 & 2 ISO VLV AUX Yes Yes DHR 246 EJHV8809B RHR TO ACCUM INJ LOOPS 3 & 4 ISO VLV AUX Yes Yes DHR 247 EJHV8811 A CTMT RECIRC SUMP TO RHR PUMP A AUX Yes Yes DHR SUCTION 248 EJHV88 11 B CTMT RECIRC SUMP TO RHR PUMP B AUX Yes Yes DHR SUCTION 249 EJHV8840 RHR/SI HOT LEG RECIRC ISO VALVE AUX Yes Yes DHR 250 EJLE0008A CTMT RECIRC SUMP LEVEL RB Yes Yes DHR 251 EJLE0008B CTMT RECIRC SUMP LEVEL RB Yes Yes DHR 252 EJLE007A CTMT SUMP A LEVEL RB Yes Yes DHR 253 EJLE007B CTMT SUMP B LEVEL RB Yes Yes DHR 254 EJLIT007 CTMT Sump B Level CB/CC Yes Yes DHR 255 EJLIT008 CTMT SUMP A LEVEL INDICATING CB/CC Yes Yes DHR TRANSMITTER 256 EKJ03A INTERCOOLER HEAT EXCHANGER DGB Yes Yes RC PC IC DHR CF 257 EKJ03B INTERCOOLER HEAT EXCHANGER DGB Yes Yes RC PC IC DHR CF WCAP-17678-NP November 2012 Revision 0

E-17 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2) Basis?) (Screens In?) Support(")

258 EKJ04A LUBE OIL COOLER DGB Yes Yes RC PC IC DHR CF 259 EKJ04B LUBE OIL COOLER DGB Yes Yes RC PC IC DHR CF 260 EKJ06A DIESEL JACKET WATER HEAT DGB Yes Yes RC PC IC DHR CF EXCHANGER 261 EKJ06B DIESEL JACKET WATER HEAT DGB Yes Yes RC PC IC DHR CF EXCHANGER 262 EMFS0917C CNTFGL CHG PMPS TO BRN INJ TK AUX Yes Yes RC IC DHR 263 EMFS0917D CNTFGL CHG PMPS TO BRN INJ TK AUX Yes Yes RC IC DHR 264 EMFT0917A CCP A TO BIT FLOW TRANSMITTER AUX Yes Yes RC IC DHR 265 EMFT0917B CCP B TO BIT FLOW TRANSMITTER AUX Yes Yes RC IC DHR 266 EMHV8801A BIT OUTLET ISO AUX Yes Yes RC IC DHR CF 267 EMHV8801 B BIT OUTLET ISO AUX Yes Yes RC IC DHR CF 268 EMHV8802A SI PUMP A DISCH HOT LEG ISO VLV AUX Yes Yes RC IC DHR CF 269 EMHV8802B SI PUMP B DIS HOT LEG ISO VLV AUX Yes Yes RC IC DHR CF 270 EMHV8803A CHARGING PUMP DISCH HDR TO BIT ISO AUX Yes Yes RC IC DHR 271 EMHV8803B CHARGING PUMP DISCH HDR TO BIT ISO AUX Yes Yes RC IC DHR 272 EMHV8807A RHR HX A/CVCS TO SI PUMP A AUX Yes Yes RC IC DHR DOWNSTREAM ISO 273 EMHV8807B RHR HX A/CVCS TO SI PUMP A AUX Yes Yes RC IC DHR DOWNSTREAM ISO 274 EMHV8814A SI PUMP A RETURN TO RWST ISO VLV AUX Yes Yes RC IC DHR 275 EMHV8814B SI PUMP B RETURN TO RWST ISO VALVE AUX Yes Yes RC IC DHR WCAP- 17678-NP November 2012 Revision 0

E-18 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building 2) Basis?) (Screens In?) Support°o) 276 EMHV882IA SI PUMP A DISCHARGE ACCUM INJ ISO AUX Yes Yes RC IC DHR VALVE 277 EMHV8821B SI PUMP B DISCHARGE ACCUM INJ ISO AUX Yes Yes RC IC DHR VALVE 278 EMHV8824 SAFETY INJ PUMP B TEST LINE ISO VLV RB Yes Yes IC DHR CF 279 EMHV8835 SAFETY INJ COLD LEG ISO VALVE AUX Yes Yes IC DHR CF 280 EMHV8923A SAFETY INJECTION PUMP A SUCT ISO AUX Yes Yes IC DHR VALVE 281 EMHV8923B SAFETY INJECTION PUMP B SUCT ISO VLV AUX Yes Yes IC DHR 282 EMHV8924 RHR HX A/CVCS TO SI PUMP A UPSTREAM AUX Yes Yes IC DHR ISO 283 ENHVOOOI CTMT RECIRC SUMP TO CTMT SPRAY AUX Yes Yes CF PUMP A ISO 284 ENHV0006 CTMT SPRAY TRAIN A DISCH ISO VLV AUX Yes Yes CF 285 ENHV0007 CTMT RECIRC SUMP TO CTMT SPRAY AUX Yes Yes CF PUMP B ISO 286 ENHV0012 CTMT SPRAY TRAIN B DISCH ISO VLV AUX Yes Yes CF 287 ENHV0015 SPRAY ADDITIVE TANK OUTLET TO CTMT AUX Yes Yes CF SPRAY A ISO 288 ENHV0016 SPRAY ADDITIVE TANK OUTLET TO CTMT AUX Yes Yes CF SPRAY B ISO 289 EPHV8808A ACCUMULATOR TANK A OUTLET ISO RB Yes Yes DHR VALVE WCAP-17678-NP November 2012 Revision 0

E-19 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

290 EPHV8808B ACCUMULATOR TANK B OUTLET ISO RB Yes Yes *, DHR VALVE 291 EPHV8808C ACCUMULATOR TANK C OUTLET ISO RB Yes Yes DHR VALVE 292 EPHV8808D ACCUMULATOR TANK D OUTLET ISO RB Yes Yes DHR VALVE 293 FC0219 LOCAL CONTROL PANEL FOR TD AFW AUX Yes Yes PC DHR PUMP 294 FCFV0313 TDAFP GOVERNOR VALVE AUX Yes Yes PC DHR 295 FCHV0312 AUX FW PUMP TURBINE MECH AUX Yes Yes PC DHR TRIP/THROT VLV 296 FEFO0A ESW TRAVELING WATER SCREENS ESW Yes Yes RC PC IC DHR CF 297 FEFOIB ESW TRAVELING WATER SCREENS ESW Yes Yes RC PC IC DHR CF 298 FEF02A ESW SELF-CLEANING STRAINER (MTR ESW Yes Yes RC PC IC DHR CF OP.-IN MOV PROG.)

299 FEF02B ESW SELF-CLEAN STRAIN. (MTR OP.-IN ESW Yes Yes RC PC IC DHR CF MOV PROG.)

300 FEF03A ESW PRELUBE STORAGE TANK FILTER YARD Yes Yes RC PC IC DHR CF 301 FEF03B ESW PRELUBE STORAGE TANK FILTER YARD Yes Yes RC PC IC DHR CF 302 FKJ02A KKJ01A AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF 303 FKJ02B KKJO1A AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF 304 FKJ02C KKJO1B AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF 305 FKJ02D KKJO1B AIR INTAKE FILTER DGB Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-20 Wolf Creek Base List I (cont.)

Base List 1 Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building( 2) Basis?) (Screens In?) Support(')

306 GDDOOO1 ESW PUMP RM SUP FAN IA INLET ESW Yes Yes RC PC IC DHR CF TORNADO DAMPER 307 GDD0003 ESW PUMP RM A EXHAUST SPRING ESW Yes Yes RC PC IC DHR CF LOADED TORNADO DAMPER 308 GDD0008 ESW PUMP RM SUP FAN lB INLET ESW Yes Yes RC PC IC DHR CF TORNADO DAMPER 309 GDD0010 ESW PUMP RM B EXHAUST SPRING ESW Yes Yes RC PC IC DHR CF LOADED TORNADO DAMPER 310 GDTEOOO1 ESW PMP RM TEMP IA DM ESW Yes Yes RC PC IC DHR CF 311 GDTE0011 ESW PMP RM SUP FAN 1B DMPR ESW Yes Yes RC PC IC DHR CF 312 GDTSLOOO1 ESW PMP RM FAN CGDO1A TEMP SWITCH CB Yes Yes RC PC IC DHR CF LOW 313 GDTZOOO1A ACTUATOR FOR O.A. DAMPER GDD0002 ESW Yes Yes IC DHR 314 GDTZOOO1B ESW ACTUATOR FOR RETURN AIR ESW Yes Yes IC DHR DAMPER GDD0004 315 GDTZOOO1C ACTUATOR FOR EXHAUST DAMPER ESW Yes Yes IC DHR GDDOO 12 316 GDTZ001 1A ACT. FOR ESW PMP RM SUP FAN OA DMPR ESW Yes Yes IC DHR GDD0009 317 GDTZ0011B ACTUATOR FOR ESW PUMP RM SUPPLY ESW Yes Yes IC DHR FAN RETURN DAMPER 318 GDTZOOIIC ACT. FOR ESW PMP RM SP FAN EXH DMPR ESW Yes Yes IC DHR GDD0013 WCAP- 17678-NP November 2012 Revision 0

E-21 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(l) 319 GKHZOO 19D CTRL RM A/C UNIT 4A OUT ACTUATOR Yes Yes RC PC IC DHR CF (GKD0285) 320 GKHZ0030D CTRL RM FLTR FAN 4B DISCH ACTUATOR CB Yes Yes RC PC IC DHR CF (D0318) 321 GKHZ029A CONT ROOM A/C UNIT A RETURN AUX Yes Yes RC PC IC DHR CF DAMPER 322 GKHZ029B CONT ROOM A/C UNIT A DISCHARGE AUX Yes Yes RC PC IC DHR CF DAMPER 323 GKHZ040A CONT ROOM A/C UNIT B RETURN AUX Yes Yes RC PC IC DHR CF DAMPER 324 GKHZ040B CONT ROOM A/C UNIT A DISCHARGE AUX Yes Yes RC PC IC DHR CF DAMPER 325 GKV0765 SGK04A WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 326 GKV0766 SGK04B WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 327 GKV0767 SGK05A WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 328 GKV0768 SGK05B WATER REGULATING VALVE CB Yes Yes RC PC IC DHR CF 329 GMHZ0009 DSL GEN RM EXH DMPR A, GMD0005 DGB Yes Yes RC PC IC DHR CF 330 GMHZ0019 DSL GEN RM EXH DMPR B, GMDOO1O DGB Yes Yes RC PC IC DHR CF 331 GMTEOOOI DIESEL GEN VENT SUPPLY FAN IA DGB Yes Yes RC PC IC DHR CF 332 GMTE001 I DIESEL GEN VENT SUPPLY FAN IB DGB Yes Yes RC PC IC DHR CF 333 GMTZOOO1A ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0002 WCAP-1 7678-NP November 2012 Revision 0

E-22 Wolf Creek Base List 1 (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Supporte")

334 GMTZOOO1B ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0007 335 GMTZOOI I A ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0002 336 GMTZOO I IB ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC DHR CF GMD0007 337 GNPT0934 CONTAINMENT ATMOSPHERE RB Yes Yes CF 338 GNPT0935 CONTAINMENT ATMOSPHERE RB Yes Yes CF 339 GNPT0936 CONTAINMENT ATMOSPHERE RB Yes Yes CF 340 GNPT0937 CONTAINMENT ATMOSPHERE AUX Yes Yes CF 341 GNPT0938 CONTAINMENT ATMOSPHERE RB Yes Yes CF 342 GNPT0939 CONTAINMENT ATMOSPHERE RB Yes Yes CF 343 GNTE060 CTMT COOLER A INLET TEMP ELEMENT RB Yes Yes CF 344 GNTE061 CTMT COOLER D INLET TEMP ELEMENT RB Yes Yes CF 345 GNTE062 CTMT COOLER C INLET TEMP ELEMENT RB Yes Yes CF 346 GNTE063 CTMT COOLER B INLET TEMP ELEMENT RB Yes Yes CF 347 GNVOOO I CTMT COOLER A ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV 348 GNVO002 CTMT COOLER B ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV 349 GNVO003 CTMT COOLER C ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV WCAP- 17678-NP November 2012 Revision 0

E-23 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support")

350 GNVO004 CTMT COOLER D ESW OUTLET FLOW RB Yes Yes CF CONTROL VLV 351 GNVO039 CTMT COOLER A ESW SUPPLY ISOLATION RB Yes Yes CF 352 GNVO040 CTMT COOLER B ESW SUPPLY ISOLATION RB Yes Yes CF 353 GNVO041 CTMT COOLER C ESW SUPPLY ISOLATION RB Yes Yes CF 354 - GNVO042 CTMT COOLER D ESW SUPPLY ISOLATION RB - Yes Yes CF 355 GSHV0020 H2 PURGE INNER CTMT ISO BTTFLY VLV RB Yes Yes CF 356 GSHV0021 H2 PURGE OUTER CTMT ISO BUTT VLV AUX Yes Yes CF 357 GSHV0031 CTMT ATMOS MON (RE-32) SUPPLY RB Yes Yes CF INSIDE CTMT ISO 358 GSHV0032 CTMT ATMOSPHERE MONITOR SUPPLY AUX Yes Yes CF OUTER ISO 359 GSHV0033 CTMT ATMOS MON (RE-32) SUPPLY AUX Yes Yes CF OUTSIDE CTMT ISO 360 GSHV0034 CTMT ATMOS MONITOR (RE-32) RET RB Yes Yes CF INSIDE CTMT ISO 361 GSHV0036 CTMT ATM MONIT (RE-31) SUPPLY RB Yes Yes CF OUTSIDE CTMT ISO 362 GSHV0037 CTMT ATMOSPHERE MONITOR SUPPLY AUX Yes Yes CF INSIDE ISO 363 GSHV0038 CTMT ATM MON (RE-31) RET-CTMT AUX Yes Yes CF OUTSIDE ISO 364 GSHV0039 CTMT ATMOS MONITOR (RE-31) RETURN RB Yes Yes CF TO CTMT INSIDE ISO November 2012 WCAP-17678-NP WCAP-17678-NP November 2012 Revision 0

E-24 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support~')

365 GTHZ0004 CTMT MINI PURGE AIR SUPLY O/SIDE AUX Yes Yes CF CTMT ISO BTTFLY VLV 366 GTHZ0005 CTMT MINI PURGE AIR SUPPLY I/S CTMT RB Yes Yes CF ISO BTTFLY VLV 367 GTHZ0006 CTMT MINI PURGE AIR SUPLY O/SIDE AUX Yes Yes CF CTMT ISO BTTFLY VLV 368 GTHZ0007 CTMT SD PURGE SUPPLY INSIDE CTMT RB Yes Yes CF ISO BTTFLY VLV 369 GTHZ0008 CTMT SD PURGE EXCH INSIDE CTMT ISO RB Yes Yes CF BTTFLY VLV 370 GTHZ0009 CTMT MINI PURGE EXH OUTSIDE CTMT AUX Yes Yes CF ISO 371 GTHZOO1 1 CTMT MINI PURGE EXH INSIDE CTMT ISO RB Yes Yes CF BTTFLY VLV 372 GTHZ0012 CTMT MINI PURGE EXH OUTSIDE CTMT AUX Yes Yes CF ISO BTTFLY VLV 373 GTRE031 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF 374 GTRE032 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF 375 GTRT031 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF (2) 376 GTRT032 CTMT ATMOSHERE RADIATION MONITOR AUX Yes Yes CF 377 HBHV7176 RCDT PUMPS DISCH HDR INSIDE CTMT RB Yes Yes CF ISO WCAP-1 7678-NP November 2012 Revision 0

E-25 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

378 JELT0001 EMER FUEL OIL DAY TK A LEV DGB Yes Yes RC PC IC DHR CF 379 JELT0021 EMER FUEL OIL DAY TK B LEV DGB Yes Yes RC PC IC DHR CF 380 JELT0032 EMER FUEL OIL TK B LEV DGB Yes Yes RC PC IC DHR CF 381 JELT012 TJE02A LEVEL TRANSMITTER DGB Yes Yes RC PC IC DHR CF 382 JELT032 TJE02B LEVEL TRANSMITTER DGB Yes Yes RC PC IC DHR CF 383 KAPCV0101 TKA03 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 384 KAPCV0102 TKA04 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 385 KAPCVO 103 TKA05 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 386 KAPCV0200 TKA02 OUTLET PRESSURE CONTROL AUX Yes Yes DHR VALVE 387 KCHV0253 FIRE PROT SYS HDR OUTER CTMT ISO Yes Yes CF 388 KJO121 GAUGE PANEL DGB Yes Yes RC PC IC DHR CF 389 KJ0122 GAUGE PANEL DGB Yes Yes RC PC IC DHR CF 390 KKJO1A STANDBY DIESEL (GENERATOR) DGB Yes Yes RC PC IC DHR CF 391 KKJO1B STANDBY DIESEL (GENERATOR) DGB Yes Yes RC PC IC DHR CF 392 LFFV0095 CTMT NOR SUMPS TO FLOOR DRN TK RB Yes Yes CF INSIDE CTMT ISO 393 LFFV0096 CTMT NOR SUMPS TO FLR DRN TK AUX Yes Yes CF OUTSIDE CTMT ISO WCAP- 17678-NP November 2012 Revision 0

E-26 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

394 NBOO1 4.16 KV BUS CB Yes Yes RC PC IC DHR CF 395 NB100110 CTRL BLDG LC NG03 CB Yes Yes RC PC IC DHR CF

.396 NBOO112 FDRXFMRXNB0I CB Yes Yes RC PC IC DHR CF 397 NBOO113 CTRL BLDG LC NGO1 CB Yes Yes RC PC IC DHR CF 398 NB002 4.16 KV BUS #2 CB Yes Yes RC PC IC DHR CF 399 NB00209 FDR XFMR XNB02 CB Yes Yes RC PC IC DHR CF 400 NB00210 CTRL BLDG LC NG04 CB Yes Yes RC PC IC DHR CF 401 NB00211 EMG D/G SUPPLY FDR BRKR CB Yes Yes RC PC IC DHR CF 402 NB00213 CTRL BLDG LC NG02 SWGR BRKR CB Yes Yes RC PC IC DHR CF 403 NB00215 ESW PUMP DPEFO1B SWGR BRKR CB Yes Yes RC PC IC DHR CF 404 NEOO1 STANDBY #1 DGB Yes Yes RC PC IC DHR CF 405 NE002 STANDBY #2 DGB Yes Yes RC PC IC DHR CF 406 NE003 DG 'A' NEUTRAL GROUNDING RESISTOR DGB Yes Yes RC PC IC DHR CF 407 NE004 DG 'B' NEUTRAL GROUNDING RESISTOR DGB Yes Yes RC PC IC DHR CF 408 NE106 CONT STBY GEN (NE02) RELAY DGB Yes Yes RC PC IC DHR CF 409 NE107 CONT STBY GEN (NEO1) RELAY DGB Yes Yes RC PC IC DHR CF 410 NF039A CONT SHED/SEQ CH I LOGIC CB Yes Yes RC PC IC DHR CF 411 NF039B CONT SHED/SEQ CH 4 LOGIC CB Yes Yes RC PC IC DHR CF 412 NF039C CONTROL PANEL SHED/SEQ CH 1 & 4 CB/CC Yes Yes RC PC IC DHR CF TERM WCAP-17678-NP November 2012 Revision 0

E-27 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

413 NG001 480 VAC CB/CC Yes Yes RC PC IC DHR CF 414 NG00101 NG0I FDR BRKR CB Yes Yes RC PC IC DHR CF 415 NG00106 NGO1A FDR BRKR CB Yes Yes RC PC IC DHR CF 416 NG001A 480 VAC CB/CC Yes Yes RC PC IC DHR CF 417 NGOO1B 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 418 NGOO1T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 419 NG002 480 VAC CB/CC Yes Yes RC PC IC DHR CF 420 NG00201 MAIN BREAKER CB Yes Yes RC PC IC DHR CF 421 NG00206 NG02A FDR BRKR CB Yes Yes RC PC IC DHR CF 422 NG002A 480 VAC CB/CC Yes Yes RC PC IC DHR CF 423 NG002B 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 424 NG002T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 425 NG003 480 VAC CB/CC Yes Yes RC PC IC DHR CF 426 NG00301 NG03 FDR BRKR CB Yes Yes RC PC IC DHR CF 427 NG003C 480 VAC AUX Yes Yes RC PC IC DHR CF 428 NG003D 480 VAC DGB Yes Yes RC PC IC DHR CF 429 NG003T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 430 NG004 480 VAC CB/CC Yes Yes RC PC IC DHR CF 431 NG00401 NG04 FDR BRKR CB Yes Yes RC PC IC DHR CF 432 NG004C 480 VAC AUX Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-28 Wolf Creek Base List 1 (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2 ) Basis?) (Screens In?) Support(")

433 NG004D 480 VAC DGB Yes Yes RC PC IC DHR CF 434 NG004T 480 VAC MOTOR CONTROL CENTER AUX Yes Yes RC PC IC DHR CF 435 NG005E 480 VAC ESW Yes Yes RC PC IC DHR CF 436 NG006E 480 VAC ESW Yes Yes RC PC IC DHR CF 437 NK001 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 438 NK002 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 439 NK003 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 440 NK004 125 VDC BUS SWITCHBOARD CB/CC Yes Yes RC PC IC DHR CF 441 NKO1 1 125-VDC NO. 1 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 442 NK012 125-VDC NO.2 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 443 NK013 125-VDC NO.3 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 444 NK014 125-VDC NO.4 60-CELL BATTERY CB/CC Yes Yes RC PC IC DHR CF 445 NK021 125 VDC NO I CB/CC Yes Yes RC PC IC DHR CF 446 NK022 125 VDC NO 2 CB/CC Yes Yes RC PC IC DHR CF 447 NK023 125 VDC NO 3 CB/CC Yes Yes RC PC IC DHR CF 448 NK024 125 VDC NO 4 CB/CC Yes Yes RC PC IC DHR CF 449 NK041 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 450 NK042 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 451 NK043 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 452 NK044 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-29 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support('))

453 NK051 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 454 NK054 DIST 125 VDC CB/CC Yes Yes RC PC IC DHR CF 455 NN001 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 456 NNO02 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 457 NN003 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 458 NN004 DIST 120 VAC INSTR CB/CC Yes Yes RC PC IC DHR CF 459 NNO11 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 460 NNO12 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 461 NNO13 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 462 NNO14 7.5 KVA CB/CC Yes Yes RC PC IC DHR CF 463 PALO0A AUX FEEDWATER PUMP AUX Yes Yes PC DHR 464 PALOIB AUX FEEDWATER PUMP AUX Yes Yes PC DHR 465 PAL02 AFW PUMP--TURBINE DRIVEN AUX Yes Yes PC DHR 466 PBG02A BORIC ACID TRANSFER PUMP MOTOR AUX Yes Yes RC 467 PBG02B BORIC ACID TRANSFER PUMP MOTOR AUX Yes Yes RC 468 PBG03A CENT. CHARGING PUMP A AUX Yes Yes RC IC AUXILIARYLUBE OIL PUMP 469 PBG03B CENT. CHARGING PUMP B AUX Yes Yes RC IC AUXILIARYLUBE OIL PUMP 470 PBG04 NORMAL CHARGING PUMP AUX Yes Yes RC IC 471 PBG05A CENTRIFUGAL CHARGING PUMP AUX Yes Yes RC PC IC DHR WCAP- 17678-NP November 2012 Revision 0

E-30 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Buildingt2 ) Basis?) (Screens In?) Support(")

472 PBG05B CENTRIFUGAL CHARGING PUMP AUX Yes Yes RC PC IC DHR 473 PEFOIA ESSENTIAL SERV. WATER PUMP ESW Yes Yes RC PC IC DHR CF 474 PEFOIB ESSENTIAL SERV. WATER PUMP ESW Yes Yes RC PC IC DHR CF 475 PEGO0A COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 476 PEGOIB COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 477 PEGOIC COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 478 PEGO0D COMPONENT COOL. WATER PUMP AUX Yes Yes RC PC IC DHR CF 479 PEJO1A RESIDUAL HEAT REMOVAL PUMP AUX Yes Yes IC DHR 480 PEJOIB RESIDUAL HEAT REMOVAL PUMP AUX Yes Yes IC DHR 481 PEMOIA SAFETY INJ. PUMP AUX Yes Yes IC DHR 482 PEMOIB SAFETY INJ. PUMP AUX Yes Yes IC DHR 483 PENO0A Containment Spray Pump A AUX Yes Yes CF 484 PENO1B Containment Spray Pump B AUX Yes Yes CF 485 PJEO1A EMERGENCY FUEL OIL TRANSFER PUMP YRD Yes Yes RC PC IC DHR CF 486 PJEO1B EMERGENCY FUEL OIL TRANSFER PUMP YRD Yes Yes RC PC IC DHR CF 487 PKJ03A AUXILIARY LUBE-OIL (KEEP-WARM) DG Yes Yes RC PC IC DHR CF PUMP FOR KKJO1A 488 PKJ03B AUXILIARY LUBE-OIL (KEEP-WARM) DG Yes Yes RC PC IC DHR CF PUMP FOR KKJOIB 489 RLOO REACTOR COOLANT AND SUPT SYS CB Yes Yes RC PC IC DHR CF CONSOLE WCAP-17678-NP November 2012 Revision 0

E-31 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support~'()

490 RL002 REACTOR COOLANT AND SUPT SYS CB Yes Yes RC PC IC DHR CONSOLE 491 RL003 REACTOR OPERATOR'S CONSOLE CB Yes Yes RC DHR 492 RL004 REACTOR OPERATOR'S CONSOLE CB Yes Yes RC DHR 493 RL005 TURBOGENERATOR AND FW CONSOLE CB Yes Yes PC DHR 494 . RL006 TURBOGENERATOR AND FW CONSOLE -CB - Yes Yes RC PC DHR 495 RL013 SITE-RELATED SECTION MCB CB Yes Yes RC PC IC DHR CF 496 RL014 SITE-RELATED SECTION MCB CB Yes Yes RC PC IC DHR CF 497 RL015 STATION ELECTRICAL DIST MCB CB Yes Yes RC PC IC DHR CF 498 RL016 STATION ELECTRICAL DIST MCB CB Yes Yes RC PC IC DHR CF 499 RL017 ESF MCB CB Yes Yes RC PC IC DHR CF 500 RL018 ESF MCB CB Yes Yes RC PC IC DHR CF 501 RL019 ESF MCB CB Yes Yes RC PC IC DHR CF 502 RL020 ESF MCB CB Yes Yes RC PC IC DHR CF 503 RL021 REACTOR AUXILIARIES PANEL CB Yes Yes RC PC IC DHR CF 504 RL022 REACTOR AUXILIARIES PANEL CB Yes Yes RC PC IC DHR CF 505 RP040 PROCESS CONTROL GROUP 3 CB Yes Yes RC PC IC DHR 506 RP043 PROCESS CONTROL GROUP 1 CB Yes Yes RC PC IC DHR 507 RP044 PROCESS CONTROL GROUP 4 CB Yes Yes RC PC IC DHR 508 RP047 PROCESS CONTROL GROUP 2 CB Yes Yes RC PC IC DHR WCAP-17678-NP November 2012 Revision 0

E-32 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"'*)

509 RP068 MISC BOP PANEL CB Yes Yes RC PC IC DHR 510 RP080 RPV LEVEL INSTR SYS PROC PROT SYS CB Yes Yes IC 511 RP08 I A/B SUBCOOLING MONITORING CABINET CB Yes Yes DHR 512 RP118A AUX SHUTDOWN PANEL AUX Yes Yes RC PC IC DHR CF 513 RPI18B AUX SHUTDOWN PANEL AUX Yes Yes RC PC IC DHR CF 514 RP290 DC DISTRIBUTION AUX Yes Yes RC PC IC DHR CF 515 SA036A ESFAS CHI TERM CB/CC Yes Yes RC PC IC DHR CF 516 SA036B ESFAS CH4 TERM CB/CC Yes Yes RC PC IC DHR CF 517 SA036C ESFAS CH2 LOGIC/TERM CABINET CB/CC Yes Yes RC PC IC DHR CF 518 SA036D ESFAS CHI LOGIC CABINET CB/CC Yes Yes RC PC IC DHR CF 519 SA036E ESFAS CH4 LOGIC CABINET CB/CC Yes Yes RC PC IC DHR CF 520 SA075A CONT MN STM & FW ISO ACT CB/CC Yes Yes DHR 521 SA075B CONT MN STM & FW ISO ACT CB/CC Yes Yes DHR 522 SB029A W SS PROT SYS INPUT TRN CB/CC Yes Yes RC PC IC DHR CF 523 SB029B W SS PROT SYS LOGIC TRN CB/CC Yes Yes RC PC IC DHR CF 524 SB029C WSS PROT SYS OUT I TRN CB/CC Yes Yes RC PC IC DHR CF 525 SB029D W SS PROT SYS OUT 2 TRN CB/CC Yes Yes RC PC IC DHR CF 526 SB032A W SS PROT SYS INPUT TRN CB/CC Yes Yes RC PC IC DHR CF 527 SB032B W SS PROT SYS LOGIC TRN CB/CC Yes Yes RC PC IC DHR CF 528 SB032C W SS PROT SYS OUT 1 TRN CB/CC Yes Yes RC PC IC DHR CF WCAP-17678-NP November 2012 Revision 0

E-33 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

529 SB032D W SS PROT SYS OUT 2 TRN CB/CC Yes Yes RC PC IC DHR CF 530 SB037 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-03 531 SB038 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-01 532 SB041 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-04 533 SB042 W PROCESS ANALOG PROTECTION SET CB/CC Yes Yes RC PC IC DHR CF CAB-02 534 SB046 CONTROL BOARD DEMULTIPLEXER CB Yes Yes RC PC IC DHR CF 535 SB078 RPV LEVEL INSTR SYS PROC PROT SYS CB Yes Yes IC 536 SB079 RPV LEVEL INSTR SYS PROC PROT SYS CB Yes Yes IC 537 SBI02A W CABINET FOR REACTOR TRIP SWG AUX Yes Yes RC TRAIN-A 538 SBI02B W CABINET FOR REACTOR TRIP SWG AUX Yes Yes RC TRAIN-B 539 SB148A WEST. PROCESS PROTECTION CB/CC Yes Yes RC 540 SB148B WEST. PROCESS PROTECTION CB/CC Yes Yes RC 541 SE031 SOURCE RANGE CHANNEL 1 PREAMP AUX Yes Yes RC 542 SE032 SOURCE RANGE CHANNEL 2 PREAMP AUX Yes Yes RC 543 SE054A W NUC INSTM NIS I CB/CC Yes Yes RC 544 SE054B W NUC INSTM NIS 2 CB/CC Yes Yes RC WCAP- 17678-NP November 2012 Revision 0

E-34 Wolf Creek Base List I (cont.)

Base List I Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

545 SE054C W NUC INSTM NIS 3 CB/CC Yes Yes RC 546 SE054D W NUC INSTM NIS 4 CB/CC Yes Yes RC 547 SENE031 SOURCE RANGE NUCLEAR INSTRUMENT RB Yes Yes RC 548 SENE032 SOURCE RANGE NUCLEAR INSTRUMENT RB Yes Yes RC 549 SENE035 INTERMEDIATE RANGE NUCLEAR RB Yes Yes RC INSTRUMENT 550 SENE036 INTERMEDIATE RANGE NUCLEAR RB Yes Yes RC INSTRUMENT 551 SENE060 EXCORE NEUTRON DETECTOR RB Yes Yes RC 552 SENE061 EXCORE NEUTRON DETECTOR RB Yes Yes RC 553 SENY060A EXCORE NEUTRON DETECTOR AMPLIFIER AUX Yes Yes RC 554 SENY060B PROCESSOR AUX Yes Yes RC 555 SENY061A EXCORE NEUTRON DETECTOR AMPLIFIER AUX Yes Yes RC 556 SENY061B PROCESSOR AUX Yes Yes RC 557 SGF02A AUX FW PUMP ROOMCOOLER AUX Yes Yes PC DHR 558 SGF02B AUX FW PUMP ROOMCOOLER AUX Yes Yes PC DHR 559 SGK04A CONTROL ROOM A/C UNITS AUX Yes Yes RC PC IC DHR CF 560 SGK04B CONTROL ROOM A/C UNITS AUX Yes Yes RC PC IC DHR CF 561 SGK05A CLASS IE ELEC. EQUIP. A/C UNIT CB/CC Yes Yes RC PC IC DHR CF 562 SGK05B CLASS IE ELEC. EQUIP. A/C UNIT CB/CC Yes Yes RC PC IC DHR CF 563 SGL09A SAFETY INJECTION PUMP ROOM COOLER AUX Yes Yes IC DHR WCAP- 17678-NP November 2012 Revision 0

E-35 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - I Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(")

564 SGL09B ROOM COOLER FOR PEMO 1B AUX Yes Yes RC IC DHR 565 SGL1OA RHR PUMP ROOM COOLER AUX Yes Yes IC DHR 566 SGL1OB RHR PUMP ROOM COOLER AUX Yes Yes IC DHR 567 SGL11A CCW PUMP A ROOM COOLER AUX Yes Yes RC PC IC DHR CF 568 SGLI lB CCW PUMP B ROOM COOLER AUX Yes Yes RC PC IC DHR CF 569 SGL12A ROOM COOLER FOR PBG05A AUX Yes Yes RC IC 570 SGL12B ROOM COOLER FOR PBG05B AUX Yes Yes RC IC 571 SGL13A CTMT SPRAY PUMP ROOM COOLER AUX Yes Yes CF 572 SGL13B CTMT SPRAY PUMP ROOM COOLER AUX Yes Yes CF 573 SGL15A PENETRATION ROOMCOOLER AUX Yes Yes CF 574 SGL15B PENETRATION ROOM COOLER AUX Yes Yes CF 575 SGNO1A CONTAINMENT COOLER RB Yes Yes CF 576 SGNO1B CONTAINMENT COOLER RB Yes Yes CF 577 SGNO1C CONTAINMENT COOLER RB Yes Yes CF 578 SGNO1D CONTAINMENT COOLER RB Yes Yes CF 579 SKJ02A D/G A EXHAUST SILENCER DGB Yes Yes RC PC IC DHR CF 580 SKJ02B D/G B EXHAUST SILENCER DGB Yes Yes RC PC IC DHR CF 581 TALOlA TURBINE DRIVEN AUXILIARY AUX Yes Yes PC DHR FEEDWATER STANDY TANK (CONDENSATE)

November 2012 WCAP- 17678-NP WCAP- I17678-NP November 2012 Revision 0

E-36 Wolf Creek Base List I (cont.)

Base List 1 Screen No. 1 Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support(')

582 TALOIB TURBINE DRIVEN AUXILIARY AUX Yes Yes PC DHR FEEDWATER STANDY TANK (CONDENSATE) 583 TALOIC TURBINE DRIVEN AUXILIARY AUX Yes Yes PC DHR FEEDWATER STANDY TANK (CONDENSATE) 584 TEFO0A ESW PUMP PRELUBESTORAGE TANK YARD Yes Yes IC DHR 585 TEFOIB ESW PUMP PRELUBESTORAGE TANK YARD Yes Yes IC DHR 586 TEGOIA CCW SURGE TANK A AUX Yes Yes RC PC IC DHR CF 587 TEGO1B CCW SURGE TANK B AUX Yes Yes RC PC IC DHR CF 588 TEMO0 BORON INJECTION TANK AUX Yes Yes IC 589 TJEO1A EMERGENCY FUEL OIL TANK YRD Yes Yes RC PC IC DHR CF 590 TJEO1B EMERGENCY FUEL OIL TANK YRD Yes Yes RC PC IC DHR CF 591 TJE02A EMERGENCY FUEL OIL DAY TANK DGB Yes Yes RC PC IC DHR CF 592 TJE02B EMERGENCY FUEL OIL DAY TANK DGB Yes Yes RC PC IC DHR CF 593 TKA02 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 594 TKA03 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 595 TKA04 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 596 TKA05 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR 597 TKJO1A D/G A JACKET WATER EXPANSION TANK DGB Yes Yes RC PC IC DHR CF 598 TKJO1B D/G B JACKET WATER EXPANSION TANK DGB Yes Yes RC PC IC DHR CF 599 TKJ02A START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF 600 TKJ02B START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF WCAP- 17678-NP November 2012 Revision 0

E-37 Wolf Creek Base List I (cont.)

Base List I Screen No. I Screen No. 3 Item Walkdown (SC - 1 Licensing Screen No. 2 (Safety Function Number Equipment Description Building(2) Basis?) (Screens In?) Support"l))

601 TKJ02C START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF 602 TKJ02D START AIR TANK D/G DGB Yes Yes RC PC IC DHR CF 603 TKJ04A D/G A AUX LUBE OIL TANK DGB Yes Yes RC PC IC DHR CF 604 TKJ04B D/G B AUX LUBE OIL TANK DGB Yes Yes RC PC IC DHR CF 605 XNGO1 CLASS 1E LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 606 XNG02 CLASS I E LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 607 XNG03 CLASS I E LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 608 XNG04 CLASS IE LOAD CENTER TRANSFORMER CB/CC Yes Yes RC PC IC DHR CF 609 XNG05 FEED MCC NG05E ESW Yes Yes IC DHR 610 XNG06 FEEDS MCC NG06E ESW Yes Yes IC DHR 611 XPN07A 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes RC IC DHR 612 XPN07B 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes RC IC DHR 613 XPN07C 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes RC IC DHR 614 XPN08A 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR 615 XPN08B 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR 616 XPN08C 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR Notes:

I RC= Reactivity Control, PC= Reactor Coolant Pressure Control, IC = Reactor Coolant Inventory Control, DHR = Decay Heat Removal (including Ultimate Heat Sink),

and CF = Containment Function 2 AUX= Auxiliary Building, CB= Control Building, CC=Communication Corridor, DGB= Diesel Generator Building, ESW= Essential Service Water Building, RB=

Reactor Building, YARD= Yard WCAP- 17678-NP November 2012 Revision 0

F-1 APPENDIX F SWEL 1 WCAP-17678-NP November 2012 Revision 0

F-2 SWEL 1 Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, 'F) enhancement? Outage?

I ABHV0014 LOOP-I MAIN AUX Yes Yes PC DHR POV (7) AB X hot/dry STEAM ISOLATION VALVE 2 ABPT0002 STM GEN B AUX Yes Yes PC DHR Inst. Racks (18) AB mild/dry STEAMLINE PRESSURE 3 ABPV0002 SG B ATMOSPHERIC AUX Yes Yes PC DHR POV (7) AB hot/dry RELIEF VLV 4 AEFV0039 EBBOIA AUX Yes Yes PC DHR POV (7) AE X hot/dry FEEDWATER

. ISOLATION VALVE I. .

5 AELT0502 STM GEN B WIDE RB Yes Yes PC DHR Inst. Racks (18) AE hot/humid Yes RANGE 6 AELT0519 STM GEN LEVEL A RB Yes Yes PC DHR Inst. Racks (18) AE hot/humid Yes NARROW RANGE 7 ALHV0030 ESW TO MDAFW AUX Yes Yes PC DHR VALVE (8) AL PUMP B 6" BTFL VLV W/LIMITQ 8 BBLIS1321 RV SUBCOOLING AUX Yes Yes RC Inst. Racks (18) BB mild/dry MONITOR TRN B 9 BBPT0456 PRESSURIZER RB Yes Yes PC Inst. Racks (18) BB Yes PRESSURE 10 BGFCV0121 CENTRIFUGAL CHG AUX Yes Yes RC PC IC POV (7) BG hot/dry PMP FLOW CONTROL II BGHV8105 CHARGING PUMPS AUX Yes Yes PC IC CF MOV (8) BG mild/dry TO REGEN HX/CTMT ISO 12 BGHV8152 LETDOWN SYSTEM AUX Yes Yes IC CF POV (7) BG mild/dry CONTAINMENT ISO VLV 13 BLHV8047 REACTOR M/U AUX Yes Yes IC CF POV (7) BL mild/dry WATER CONTAINMENT ISO WCAP- 17678-NP November 2012 Revision 0

F-3 SWEL I (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, OF) enhancement? Outage?

14 BMHV0002 SG B BLOWDOWN AUX Yes Yes PC IC CF POV (7) BM hot/dry AFAS ISO I5 BNHV0003 RWST SUPPLY TO AUX Yes Yes CF MOV (8) BN hot/dry CTMT SPRAY PUMP B

16 BNLT0931 RWST LEVEL YRD Yes Yes RC IC Inst. Racks (18) BN hot/humid TRANSMITTER (2) DHR 17 BNV00I I RWST OUTLET ISO AUX Yes Yes RC IC (8) BN VALVE DHR 18 CGMOIB DIESEL GENERATOR DGB Yes Yes RC PC IC Fans (9) GM hot/humid BLDG SUPPLY FAN DHR 19 EEG0IB COMPONENT COOL AUX Yes Yes RC PC IC Heat EG mild/dry WATER HEAT DHR Exchangers (21)

EXCHANGER 20 EF156 ESW CONTROL ESW Yes Yes RC PC IC Control Panel EF hot/dry PANEL DHRCF (20) 21 EFHV0024 ESW B/SERVICE CB/CC Yes Yes RC PC IC MOV (8) EF X mild/dry WATER CROSS DHR CF CONNECT VALVE 22 EFHV0040 ESW TRAIN B TO SW CB/CC Yes Yes RC PC IC MOV (8) EF X mild/dry CROSS CONNECT DHR CF VALVE 23 EFHV0052 ESW B TO CCW HX B AUX Yes Yes RC PC IC MOV (8) EF DHRCF 24 EFHV0098 ESW PUMP B ESW Yes Yes RC PC IC MOV (8) EF hot/humid DISCHARGE AIR DHR CF RELEASE VALVE 25 EFTE0062 ESW B TEMPT TO CB/CC Yes Yes RC PC IC Temp. Sensor EF mild/dry POWER BLOCK DHRCF (19) 26 EGHV0016 CCW TRAIN B AUX Yes Yes DHR MOV (8) EG X mild/dry RETURN ISO VALVE 27 EGHVO102 CCW TO RHR HX B AUX Yes Yes DHR MOV (8) EG mild/dry ISO 28 EGLT0002 CCW SURGE TK B AUX Yes Yes DHR Inst. Racks (18) EG mild/dry WCAP-17678-NP November 2012 Revision 0

F-4 SWEL 1 (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, *F) enhancement? Outage?

29 EGTE0032 CCW HX B OUTLET AUX Yes Yes RC DHR Temp. Sensor EG mild/dry TEMP (19) 30 EGTV0030 CCW HX B TEMP CV AUX Yes Yes RC DHR POV (7) EG mild/dry WAFER BTTFLY VLV 31 EJFCV0611 RHRPUMP1B AUX Yes Yes DHR MOv (8) EJ hot/dry MINIFLOW VALVE 32 EJFIS0611 RHR PMP PEJ0IB AUX Yes Yes DHR Inst. Racks (18) EJ mild/dry MINIFLOW CONTROL DISCHARGE 33 EJHV8809B RHR TO ACCUM INJ AUX Yes Yes DHR MOV (8) EJ mild/dry LOOPS 3 & 4 ISO VLV 34 EKJ03B INTERCOOLER OGB Yes Yes RC PC IC Heat KJ X hot/humid HEATEXCHANGER DHRCF Exchangers (21) 35 EKJ04B LUBE OIL COOLER DGB Yes Yes RC PC IC Heat KJ X hot/humid DHR CF Exchangers (2 1) 36 EKJ06B DIESEL JACKET DGB Yes Yes RC PC IC Heat KJ X hot/humid WATER HEAT DHR CF Exchangers (2 )

EXCHANGER 37 EMFT0917B CCP B TO BIT FLOW AUX Yes Yes RC IC Inst. Racks (18) EM mild/chemical TRANSMITTER DHR 38 EMHV8814B SI PUMP B RETURN AUX Yes Yes RCIC MOV (8) EM hot/dry TO RWST ISO DHR VALVE 39 EMHV8923B SAFETY INJECTION AUX Yes Yes IC DHR MOV (8) EM hot/dry PUMP B SUCT ISO VLV 40 EPHV8808B ACCUMULATOR RB Yes Yes DHR MOV (8) EP hot/humid Yes TANK B OUTLET ISO VALVE 41 FC0219 LOCAL CONTROL AUX Yes Yes PC DHR Control Panel FC X hot/dry PANEL FOR TD AFW (20)

PUMP WCAP- 17678-NP November 2012 Revision 0

F-5 SWEL I (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, IF) enhancement? Outage?

42 FCHV0312 AUX FW PUMP AUX Yes Yes PC DHR MOV (8) FC hot/dry TURBINE MECH TRIP/THROT VLV 43 FEF02B ESW SELF-CLEAN ESW Yes Yes RC PC IC Other (0) EF X hot/dry STRAIN. (MTR OP.-IN DHR CF MOV PROG.)

44 FKJ02C KKJOI B AIR INTAKE DGB Yes Yes RC PC IC Other (0) KJ hot/humid FILTER DHR CF 45 GKV0766 SGK04B WATER CB Yes Yes RC PC IC MOV (8) GK mild/dry REGULATING DHR CF VALVE 46 GKV0768 SGK05B WATER CB Yes Yes RC PC IC MOV (8) GK cool/dry Yes REGULATING DHR CF VALVE 47 GMHZ0019 DSL GEN RM EXH DGB Yes Yes RC PC IC Other (0) GM hot/humid DMPR B, GMDOO10 DHR CF 48 GMTE001 I DIESEL GEN VENT DGB Yes Yes RC PC IC Temp. Sensor GM hot/humid SUPPLY FAN IB DHR CF (19) 49 GMTZO0I I B ACT FOR DG VENT DGB Yes Yes RC PC IC Other (0) GM hot/humid SUPPLY FAN DHR CF DAMPER GMD0007 50 GNPT0934 CONTAINMENT RB Yes Yes CF Inst. Racks (18) GN mild/dry Yes ATMOSPHERE 51 GNVO002 CTMT COOLER B RB Yes Yes CF POV (7) GN X hot/humid Yes ESW OUTLET FLOW CONTROL VLV 52 GSHV0021 H2 PURGE OUTER AUX Yes Yes CF MOV (8) GS mild/dry CTMT ISO BUTT VLV 53 GTRE031 CTMT ATMOSHERE AUX Yes Yes CF Inst. Racks (18) GT mild/dry RADIATION MONITOR 54 HBHV7176 RCDT PUMPS DISCH RB Yes Yes CF POV (7) HB Yes HDR INSIDE CTMT ISO 55 JELT0021 EMER FUEL OIL DGB Yes Yes RC PC IC Inst. Racks (18) JE hot/humid DAY TK B LEV DHR CF WCAP-17678-NP November 2012 Revision 0

F-6 SWEL I (cont.)

Screen #1 Screen #3 Screen #4 Sample Considerations SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, 'F) enhancement? Outage?

56 KAPCV0I03 TKA05 OUTLET AUX Yes Yes DHR POV (7) KA mild/dry PRESSURE CONTROL VALVE 57 KJ0122 GAUGE PANEL DGB Yes Yes RC PC IC Control Panel KJ hot/humid DHR CF (20) 58 KKJ,01B STANDBY DIESEL DGB Yes Yes RC PC IC Eng. Gen. (17) KJ hot/humid (GENERATOR) DHR CF 59 LFFV0096 CTMT NOR SUMPS AUX Yes Yes CF POV (7) LF mild/dry TO FLR DRN TK OUTSIDE CTMT ISO 60 NB002 4.16 KV BUS # CB Yes Yes RC PC IC Med. Volt NB cool/dry Yes DHR CF Swgr. (3) 61 NB00213 CTRL BLDG LC NG02 CB Yes Yes RC PC IC Med. Volt NB Yes SWGR BRKR DHR CF Swgr. (3) 62 NE002 STANDBY #2 DGB Yes Yes RC PC IC Eng. Gen. (17) NE hot/humid DHR CF 63 NF039B CONT SHED/SEQ CH CB Yes Yes RC PC IC Control Panel NF cool/dry 4 LOGIC DHR CF (20) 64 NG002 480 VAC CB/CC Yes Yes RC PC IC Low Volt Swgr. NG cool/dry X Yes DHR CF (2) 65 NG00201 MAIN BREAKER CB Yes Yes RC PC IC Low Volt Swgr. NG cool/dry Yes DHR CF (2) 66 NG00206 NG02A FDR BRKR CB Yes Yes RC PC IC Low Volt Swgr. NG cool/dry Yes DHR CF (2) 67 NG002B 480 VAC MOTOR AUX Yes Yes RC PC IC MCC (I) NG mild/dry Yes CONTROL CENTER DHR CF 68 NG004C 480 VAC AUX Yes Yes RC PC IC MCC (1) NG mild/dry Yes DHR CF 69 NG006E 480 VAC ESW Yes Yes RC PC IC MCC (1) NG hot/dry Yes DHR CF 70 NK004 125 VDC BUS CB/CC Yes Yes RC PC IC Dist. Panel (14) NK cool/dry Yes SWITCHBOARD DHR CF 71 NK012 125-VDC NO.2 60- CB/CC Yes Yes RC PC IC Battery Rack NK cool/dry CELL BATTERY DHR CF (15)

WCAP- 17678-NP November 2012 Revision 0

F-7 SWEL 1 (cont.)

Screen #1 Screen #3 Screen #4 Sample Considerations SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to 0

Number Equipment Description - Building Basis?) In?) Support) Class Type equipment? (Temp, F) enhancement? Outage?

72 NK014 125-VDC NO.4 60- CB/CC Yes Yes RC PC IC Battery Rack NK cool/dry CELL BATTERY DHR CF (15) 73 NK024 125 VDC NO 4 CB/CC Yes Yes RC PC IC Battery Chg NK cool/dry Yes DHRCF (16) 74 NK044 DIST 125 VDC CB/CC Yes Yes RC PC IC Dist. Panel (14) NK cool/dry Yes DHR CF 75 NK054 D1ST 125 VDC CB/CC Yes Yes RC PC IC Dist. Panel (14) NK cool/dry Yes DHR CF 76 NN014 7.5 KVA CB/CC Yes Yes RC PC IC Battery Chg NN cool/dry Yes DHRCF (16) 77 PALO lB AUX FEEDWATER AUX Yes Yes PC DHR Horz. Pumps AL hot/dry PUMP (5) 78 PAL02 AFW PUMP-- AUX Yes Yes PC DHR Horz. Pumps AL hot/dry TURBINE DRIVEN (5) 79 PBG02B BORIC ACID AUX Yes Yes RC Horz. Pumps BG X hot/dry TRANSFER PUMP (5)

MOTOR 80 PBG04 NORMAL AUX Yes Yes RC IC Horz. Pumps BG hot/dry CHARGING PUMP (5) 81 PBG05B CENTRIFUGAL AUX Yes Yes RC PC IC Horz.*Pumps BG hot/dry CHARGING PUMP DHR (5) 82 PEGOIB COMPONENT COOL. AUX Yes Yes RC PC IC Horz. Pumps EG mild/dry WATER PUMP DHR CF (5) 83 PEJO0B RESIDUAL HEAT AUX Yes Yes IC DHR Vert. Pump (6) EJ X hot/dry REMOVAL PUMP 84 PENOIB Containment Spray AUX Yes Yes CF Vert. Pump (6) EN hot/dry Pump B 85 PKJ03B AUXILIARY LUBE- DG Yes Yes RC PC IC Horz. Pumps KJ X hot/humid OIL (KEEP-WARM) DHR CF (5)

PUMP FOR KKJOIB 86 RL017 ESF MCB CB Yes Yes RC PC IC Control Panel RL cool/dry DHR CF (20) 87 RL020 ESF MCB CB Yes Yes RC PC IC Control Panel RL cool/dry DHRCF (20)

WCAP-17678-NP November 2012 Revision 0

F-8 SWEL 1 (cont.)

Screen #1 Screen #3 Screen #4 Sample Considerations SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to 0

Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, F) enhancement? Outage?

88 RL021 REACTOR CB Yes Yes RC PC IC Control Panel RL cool/dry AUXILIARIES PANEL DHR CF (20) 89 RPOSIA/B SUBCOOLING CB Yes Yes DHR Control Panel RP cool/dry MONITORING (20)

CABINET 90 RP290 DC DISTRIBUTION AUX Yes Yes RC PC IC Control Panel RP mild/dry DHR CF (20) 91 SA036E ESFAS CH4 LOGIC CB/CC Yes Yes RC PC IC Control Panel SA cool/dry CABINET DHRCF (20) 92 SBO32C W SS PROT SYS OUT CB/CC Yes Yes RC PC IC Control Panel SB cool/dry I TRN DHRCF (20) 93 SB032D W SS PROT SYS OUT CB/CC Yes Yes RC PC IC Control Panel SB cool/dry 2 TRN DHRCF (20) 94 SB041 W PROCESS CB/CC Yes Yes RC PC IC Control Panel SB cool/dry ANALOG DHR CF (20)

PROTECTION SET CAB-04 95 SB079 RPV LEVEL INSTR CD Yes Yes IC Control Panel SB cool/dry SYS PROC PROT SYS (20) 96 SE032 SOURCE RANGE AUX Yes Yes RC Control Panel SE mild/dry Yes CHANNEL 2 PREAMP (20) 97 SE054B W NUC INSTM NIS 2 CB/CC Yes Yes RC Control Panel SE cool/dry Yes (20) 98 SENY061A EXCORE NEUTRON AUX Yes Yes RC Control Panel SE mild/dry Yes DETECTOR (20)

AMPLIFIER 99 SGK04B CONTROL ROOM AUX Yes Yes RC PC IC AHU (10) GK X mild/dry X A/C UNITS DHR CF 100 SGK05B CLASS IE ELEC. CB/CC Yes Yes RC PC IC AHU (10) GK X cool/dry X Yes EQUIP. A/C UNIT DHR CF 101 SGL09B ROOM COOLER FOR AUX Yes Yes RC IC AHU (10) GL hot/dry PEMOIB DHR 102 SGLlOB RHR PUMP ROOM AUX Yes Yes IC DHR AHU (10) GL hot/dry COOLER WCAP- 17678-NP November 2012 Revision 0

F-9 SWEL I (cont.)

Screen #4 Sample Considerations Screen #1 Screen #3 SWEL (SC - I Screen #2 (Safety Major new or IPEEE Walkdown Item Walkdown Licensing (Screens Function Equipment System replacement Environment vulnerability Deferred to 0

Number Equipment Description Building Basis?) In?) Support) Class Type equipment? (Temp, F) enhancement? Outage?

103 SGL15B PENETRATION AUX Ycs Yes CF AHU (10) GL mild/dry ROOM COOLER 104 TEGOIB CCW SURGE TANK B AUX Yes Yes RC PC IC Tank(21) EG mild/dry DHR CF 105 TJE02B EMERGENCY FUEL DGI3 Yes Yes RC PC IC Tank (21) JE hot/humid OIL DAY TANK DHR CF 106 TKA04 AFW CTRL/MAIN AUX Yes Yes PC DHR Tank (21) KA mild/dry STEAM ARV ACCUM 107 TKJOIB D/G B JACKET DGB Yes Yes RC PC IC Tank (21) KJ hot/humid WATER EXPANSION DHR CF TANK 108 TKJ02C START AIR TANK DGB Yes Yes RC PC IC Tank (21) KJ hot/humid D/G DHR CF 109 TKJ04B D/G B AUX LUBE DGB Yes Yes RC PC IC Tank (21) KJ hot/humid OIL TANK DHR CF 110 XNG02 CLASS I E LOAD CB/CC Yes Yes RC PC IC Transformer (4) NG cool/dry Yes CENTER DHR CF TRANSFORMER 1H1 XNG06 FEEDS MCC NG06E ESW Yes Yes IC DHR Transformer (4) NG hot/dry Yes 112 XPN08B 120 V INSTRUMENT CB/CC Yes Yes IC DHR Transformer (4) PN cool/dry AC TRANSFORMER Note:

The Walkdown Deferred to Outage column was populated at the time of the SWEL development site visit on August 27-28, 2012, and was later modified depending on component accessibility during the at-power walkdowns in September, 2012.

WCAP-17678-NP November 2012 Revision 0

G-1 APPENDIX G WOLF CREEK COMPOSITE SWEL TRANSMITTAL WCAP-17678-NP November 2012 Revision 0

G-2 O Westinghouse Seismic Walkdown Equipment List, Revision 0 In Response to NTTF Recommendation 2.3:

Seismic Wolf Creek Generating Station DAVID BERSIE.

Equipment Selection Personny1 Lead date DEREK SEAMAN ý 'ý .

Equipment Selection Personihel date ERIC CARLSON ( c' 7 9/612012 Station Operations date Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 1 WCAP-17678-NP November 2012 Revision 0

G-3 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-1l-12-083 NT'TF Recommendation 2.3: Seismic Walkdown Wolf Creek Generating Station Seismic Walkdown Equipment List (SWEL)

A listing of structures, systems, and components (SSCs) that will be viewed during the walkdown, the Seismic Walkdown Equipment List (SWEL), has been prepared in advance of the walkdown effort.

The selection of SSCs process described in EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012 {Reference 1}, was utilized to develop the SWEL for Wolf Creek.

The SWEL is comprised of two groups of items:

  • . SWEL 1 (Attachment 1) is a sample of items to safely shut down the reactor and maintain containment integrity.
  • . SWEL 2 (Attachment 2) is a list of spent fuel pool related items. Note that no rapid drain down items have been identified for Wolf Creek Generating Station, however, it is recommended that an area walk-by of the spent fuel building instrument air be conducted to ensure gate seal integrity.

Wolf Creek Operations and Engineering Staff Members participated in the selection of SSCs compiling the SWEL and provided direct input to the Equipment Selection Personnel during the SWEL development process. This input included:

" Confirmation of the equipment information retrieved from the Wolf Creek Seismic Category I documentation.

  • Discussions with the Equipment Selection Personnel to identify upgrades, modifications, and replacements of equipment which might be pertinent to the selection of the SWEL.

" Input into the selection of the SWEL using operational experience relevant to equipment classifications, safety function support, and environmental considerations.

" Approval of the components selected for the SWEL.

The process detailed in Reference 1 for the Selection of SSCs to produce the SWEL was discussed with the Wolf Creek Operations and Engineering Staff Members during the site visit August 2 7 th through 28 nd, 2012. The details describing the process for Selection of SSCs to produce the SWEL will be provided in the "Selection of SSCs" section of the Submittal Report.

Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 2 WCAP- 17678-NP November 2012 Revision 0

G4 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-II-12-083 NTTF Recommendation 2.3: Seismic Walkdown Wolf Creek Generating Station References

1) EPRI Technical Report 1025286, Seismic Walkdown Guidance for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, dated June 2012.

Attachments

1) Seismic Walkdown Equipment List 1
2) Seismic Walkdown Equipment List 2 Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 3 WCAP-17678-NP November 2012 Revision 0

G-5 SeismiC Walkdown Equipenent List, Rev. 0 Attachment to LTR-RAM-I-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL I Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations Screen______Walkdown SWEL Walkdown 2 Major new Deferred Item Equipment Description Building (SC- 1 (Screens (Safety Equipment System or Environment IPEEE Comments Number Ucensing In?) Function Class Type replacement (remp,°F) vulnerability Ot Basis?) support) equipment? enhancement?

I ABHVOO14 LOOP-1 MAINSTEAMISOLATIONVALVE AUX Yes Yes PC DHR POV (7) AB x hot/dry 2 ABPTO002 STM GEN BSTEAMUNE PRESSURE

3 ASPVO02 SGBATMOSPHERIC REUEFVLV AUX Yes Yes PC OHR POV (7) AB hot/dry 4 AEFVOO39 EBROLAFEEDWATER ISOLATIONVALVE AUX Yes Yes PCDHR POV (7) AE a hot/dry Inst Racks S AELTOS02 STM GEN BWIDE RANGE RB Yes Yes PCOHR AE hot/humid Yes Inst Racks S AELT0519 STMGEN LEVELA NARROW RANGE RB Yes Yes PCDHR AE hot/humid Yes (18)

ESW TO MOAFW PUMP B56STEL VLV 7 ALHV0030 WTUMIJQ AUX Yes Yes PCOHR VALVE (8) AL Ins. Racks 8 B.1S1321 RVSUBCODOUNG MONITORTRN B AUX Yes Yes RC SB mild/dry Inst. Racks 9 BOPT0456 PRESSURIZER PRESSURE RB Yes Yes PC (18) SB Yes CENTRIFUGAL CHG PMP FLOW CONTROL 10 BGFCV012L <CAT2 AOV PROGRAM VALVE>

11CHARGING PUMPSTOREGENHX/CTMT AUX Yes Yes PCICCF MOV(8) BG mild/dry ISO LETDOWN SYSTEM CONTAINMENT ISO 12 BGHV8152 AUX Yes Yes ICCF POV (7) BG mild/dry VLV REACTOR MAI WATER CONTAINMENT 13 BMHVSO47 AUX Yes Yes ICCF POV (7) 8L mild/dry ISO Wolf Creek Seismic Walkdown Equipment Ust September7, 2012 Page 4 WCAP-17678-NP November 2012 Revision 0

G-6 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-1I.12-083 NTrFRecommendation 2.3: Seismic Walkdowm Attachment I -SWEL I Wolf Creek Generating Station Sceree c Screen Screen R4 Sample Considerations Screen Walkdown SWEL #1 63 Wldw Waldown 1 32 Major new Deferred Item WakonDsrpinBidn Equipment S 2 (safety escpion -1 (Screens Equipment System or Environment Cmet Comments Number Licensing In?) Function Support) Ca Clss Typ replacement (Temp, "F) e vulnerability hne et to uae Basis?)

BSequipment? enhancement?

14 BMHVO002 SG B BLOWDOWN AFAS ISO AUX Yes Yes PC IC CF POV (7) BM hot/dry 15 BNHVOOO3 RWST SUPPLY TO CTMT SPRAY PUMP B AUX Yes Yes CF MOV (B) BN hot/dry RC IC Inst. Racks 16 BNLTO931 RWST LEVEL TRANSMITTER (2) YRD Yes Yes BN hot/humid DHR (18)

RC IC 17 RNVOO11 RWST OUTLET ISO VALVE AUX Yes Yes DHR (8) BN RC PC IC 18 CGMOB DIESELGENERATOR BLDG SUPPLY FAN DGB Yes Yes Fans (9) GM hot/humid DHR Heat COMPONENTCOOL WATER HEAT RC PC IC 19 EEG01B EXCHANGER AUX Yes Yes DHR Exchangers EG mild/dry (21)

RC PC IC Control 20 EF156 ESW CONTROL PANEL ESW Yes Yes DHR CF Panel (20) EF hot/dry 21 EFHVO0G24 ESW B/SERVICE WATER CROSS CONNECT VLECR/CC Yes YesMO(8 RC PC IC EFml/y VALVE DHRCF V ESW TRAIN B TO SW CROSS CONNECT PC PC IC 22 EFHV0040 CB/CC Yes Yes MOV (8) EF X mild/dry VALVE DHR CF RCPCIC 23 EFHVOO52 ESW B TO CCW HX B AUX Yes Yes RCI DHR CF MOV MOg) (8) EF E

ESW PUMP B DISCHARGE AIR RELEASE RC PC IC 24 EFHVD098 ESW Yes Yes MOV (8) EF hot/humid VALVE DHRCF RC PC IC Temp.

25 EFTE0062 ESW B TEMPT TO POWER BLOCK CB/CC Yes Yes EF mild/dry DHR CF Sensor (19) 26 EGHVOO16 CCW TRAIN B RETURN ISO VALVE AUX Yes Yes DHR MOV (8) EG X mild/dry Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 5 WCAP- 17678-NP November 2012 Revision 0

G-7 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL 1 Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations SWLScreen Walkdown Walkdown #2 #3 Major new Deferred Item Equipment Description Building (SC- 1 (Screens (Safety Equipment System or Environment toEComments NumberEquipment ~~~Licensing In?)

Function Class setSsm Type or replacement Evon (Temp, *F) nt ulraity vulnerability t o

Basis?) Support) equipment? enhancement? Outage?

27 EGHV0102 CCW TO RHRHX BISO AUX Yes Yes DHR MOV(8) EG mild/dry Inst. Racks 28 EGLTO002 CCW SURGE TKB AUX Yes Yes DHR EG mild/dry (18)

Temp.

29 EGTEO032 CCW HXB OUTLETTEMP AUX Yes Yes RCDHR EG mild/dry Sensor (19) 30 EGTVO030 CCW HXR TEMP CV WAFER BTTFLY VLV AUX Yes Yes RCDHR POV(7) EG mild/dry 31 EJFCV0611 RHRPUMP B MINIFLOW VALVE AUX Yes Yes DHR MOV)8) El hot/dry RHRPMP PEJO1B MINIFLOW CONTROL Inst. Racks 32 EJFIS0611 DISCHARGE

Heat IC RCPC 36 EK06B DIESELJACKETWATER HEATEXCHANGER DGB Yes Yes Exchangers KJ X hotthumid DHR CF Ecagr o/ui 121)

RC IC Inst. Racks 37 EMFTO917B CCP BTO BIT FLOWTRANSMITTER AUX Yes Yes EM mild/chemical DHR (18)

BC IC 38 EMHV8814B SI PUMP B RETURNTO RWST ISOVALVE AUX Yes Yes MOV(g) EM hot/dry DHR 39 EMHV8923B SAFETYINJECTIONPUMP B SUCTISO VLV AUX Yes Yes ICDHR MOV (8) EM hot/dry Wolf Creek Seismic Walkdown Equipment List September7, 2012 Page 6 WCAP- 17678-NP November 2012 Revision 0

G-8 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL1 Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations Screen Walkdown SWEL l~l l#3 Walkdown 1 12 Major new Deferred Item Equipment Description Building (SC -1 (Screens (Safety Equipment System or Environment lEEE rComments Number Licensing ln?(

Suppry)

Function Class Type replacement (Temp, °F) nacmnt vulnerability uae ta Basis?) Support) equipment? enhancement?

ACCUMULATOR TANK B OUTLET ISO 40 EPHV8808B VALVE

LOCALCO NTROL PANEL FDORTDAFW Control 41 FC0219 AUX Yes Yes PC DHR PC X hot/dry PUMP Panel (20)

AUX PW PUMPTURBINE MECH 42 FCHV0312 TRFPUTR VLV T AUX Yes Yes PC DHR MOV (8) FC hot/dry High attention level item TRIP/THROT VLV 43 PEP02B ESW SELF-CLEANSTRAIN. (MTR OP.-IN Yes Yes BC PC IC R

MOV PROG.) DHR CF BC PC IC 44 FKJ02C KKJOSBAIR INTAKE FILTER DGB Yes Yes Other (5) KJ hot/humid DHR CP BC PC IC 45 GKV0766 SGK04B WATER REGULATING VALVE CB Yes Yes MOV (8) GK mild/dry DHRCF BC PC IC 46 GKV0768 SGK05BWATER REGULATING VALVE CB Yes Yes MOV (8) GK coo/dry Yes DHRCF BC PC IC 47 GMHZO019 DSLGEN RM EXH DMPR B, GMDO010 DGB Yes Yes Other(0) GM hot/humid DHRCF BC PC IC Temp.

48 GMTEO011 DIESELGEN VENT SUPPLY FAN 1B DGB Yes Yes GM hot/humid DHRCF Sensor (19) 49 GMTZD001B ACT FOR DG VENT SUPPLY FAN DAMPER DGB Yes Yes RC PC IC Ohr() G o/ui GMDO007 DHRCF Inst. Racks SD GNPT0934 CONTAINMENT ATMOSPHERE RB Yes Yes CF GN mild/dry Yes (18)

CTMT CODLER B tOW3OUTLET FLOW 51 GNVO002 RB Yes Yes CF POV (7) GN X hot/humid Yes CONTROL VLV 52 GSHV0021 H2 PURGE OUTER CTMT ISO BUTT VLV AUX Yes Yes CF MOV (8) GS mild/dry Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 7 WCAP- 17678-NP November 2012 Revision 0

G-9 Seismic Walkdown Equipment List, Rev. 0 Attachment to LTR-RAM-II-12-083 NT-F Recommendation 2.3: Seismic Walkdown Attachment 1 - SWEL1 Wolf Creek Generating Station Screen Screen Screen 84 Sample Considerations Screen 43Walkdown SWEL SE #11 83 Walkdown P2 Major new Deferred Item Equipment Description Building [SC - 1 (Screens (Safety Equipment System or Environment to NubeULcensing Functionvunrblt Iasing in?) Class Type replacement (Temp, F) vulnerability Basis? Support) equipment? enhancement? Outage?

53 GTRE031 CTMT ATMOSHERE RADIATION AUX Yes Yes CFGT Inst. Racks mild/dry MONITOR (18)

RCDT PUMPS DISCH HDR INSIDE CTMT 54 HBHV7176 ISO RB Yes Yes CF POV (7) HB Yes 55 JELTOO21 EMER FUELOILDAYTTK B LEVuTIME DoG Yes Yes RC PC IC Inst. Racks JE hot/humid CRITICAL ACTION EQUIPMENT> DHRCE (18)

TKAOS OUTLET PRESSURE CONTROL 56 KAPCVO013 VALVE AUX Yes Yes DHR POV (7) KA mild/dry RC PC IC Control 57 KJO122 GAUGE PANEL DGB Yes Yes KJ hot/humid DHRCF Panel (20)

RC PC IC Eng. Gen.

58 KKIJO1B STANDBY DIESEL (GENERATOR) DGB Yes Yes KJ hot/humid DNRCF (17)

CTMT NOR SUMPS TO FLR DRN TK 59 LFFVO096 AUX Yes Yes CF POV (7) LF mild/dry OUTSIDE CTMT ISO 60 NBO02 4.16 KV BUS #2

RC PC IC Med. Volt 61 NB00213 CTRL BLDG LC NG02 SWGR BRKR CB Yes Yes NB Yes DHR CF Swgr. (3)

RC PC IC Eng. Gen.

62 NEO02 STANDBY #f2 DGB Yes Yes NE hot/humid DHR CF (17)

RC PCIC Control 63 NFO39B CONT SHED/SEQ CH 4 LOGIC CB Yes Yes NF cool/dry DHRCF Panel (20)

RC PCIC Low Volt 64 NGO02 480 VAC CB/CC Yes Yes NG cool/dry X Yes DHRCF Swgr. (2)

RC PC IC Low Volt 65 NG00201 MAIN BREAKER CB Yes Yes NG cool/dry Yes DHRCF Swgr. (2)

Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page8 WCAP-17678-NP November 2012 Revision 0

G- 10 Seismic Walkdown Equipment Ust, Rev. 0 Attachment to LTR-RAM-ll-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment I - SWEL 1 Wolf Creek Generating Station Scrcree r Screen Screen 44 Sample Considerations SWI 1 Screen 13Walkdown Item Walkdown 1 #2 Major new IPEEE Deferred Comments Equipment (Screens (Sty Equipment System or Environment to NumerLicensing Basis?) In?) Functionvunrbit Fuppon Class Type replacement (Temp, 'F) vulnerability Support) equipment? enhancement? Outage?

66 NG00206 NG02A FDR BRKR

RC PC IC 67 NG002B 480 VAC MOTOR CONTROL CENTER AUX Yes Yes DHRCF MCC (1)

MCS NG Oml/r mild/dry Yes RC PC IC 68 NGO04C 480 VAC AUX Yes Yes R MCC (1) NG mild/dry Yes DHRCF RC PC IC 69 NGOO6E 480 VAC ESW Yes Yes MCC (1) NG hot/dry Yes DHRCF MC() Nho/r SC PC IC Dist. Panel 70 NKO04 125 VDC BUS SWITCHBOARD CB/CC Yes Yes DHRCF (14) NK cool/dry Yes RC PC IC Buttery 71 NK012 125-VDC NO.2 60-CELL BATTERY CB/CC Yes Yes NK cool/dry OHRCF Rack (15)

RC PC IC Battery 72 NK014 125-VDC NO.4 60-CELL BATTERY CB/CC Yes Yes NK cool/dry DHRCF Rack (15)

RC PC IC Buttery Chg 73 NK024 125 VDC NO 4 CB/CC Yes Yes NK cool/dry Yes DHRCF (16)

SC PC IC Dist. Panel 74 NK044 DIST 125 VDC CB/CC Yes Yes NK cool/dry Yes DHRCF (14)

RC PC IC Dist; Panel 75 NK054 DIST 125 VDC CB/CC Yes Yes NK cool/dry Yes DHRCF (14)

RC PCIC Battery Chg 76 NNO14 7.5 KVA CB/CC Yes Yes NN cool/dry Yes DHRCF (16)

Horz.

77 PALOIB AUX FEEDWATER PUMP AUX Yes Yes PC DHR AL hot/dry Pumps (5)

Horz.

78 PAL02 AFW PUMP-TURBINE DRIVEN AUX Yes Yes PC DHR AL hot/dry Pumps (5)

Wolf Creek Seismic Walkdown Equipment Ust September 7, 2012 Page 9 WCAP- 17678-NP November 2012 Revision 0

G-11 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-lI-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 1 - SWEL 1 Wolf Creek Generating Station Screen Screen Screen #4 Sample Considerations SWEL Screen Walkdown Rit R3 Walkdown #2 Major new Deferred Item Equipment Description Building (SC - 1 (Screens (Safety Equipment System or Environment to Comments Number acensing In?) Function Class Type replacement (Temp, 'F) vulnerability Outage?

Basis? Support) equipment? enhancement?

Honz.

79 PBG02B BORIC ACID TRANSFER PUMP MOTOR AUX Yes Yes RC BG X hot/dry Pumps (5)

Ho11.

80 PBG04 NORMAL CHARGING PUMP AUX Yes Yes RC IC BG hot/dry Pumps (5)

RC PC IC Horz.

81 PBG05B CENTRIFUGAL CHARGING PUMP AUX Yes Yes BG hot/dry DHR Pumps (5)

RC PC IC Hor.

82 PEGO1B COMPONENT COOL. WATER PUMP AUX Yes Yes EG mild/dry DHR CF Pumps (5)

Vert. Pump 83 PEJO1B RESIDUAL HEAT REMOVAL PUMP AUX Yes Yes IC DHR EJ u hot/dry (6)

Vert. Pump 84 PENO1B Containment Spray Pump B AUX Yes Yes CF EN hot/dry (B) 85 PKJO3B AUXILIARY LUBE-OIL (KEEP-WARM) DO Yes Yes RC PC IC Horz. It] hot/humid PUMP FOR KKJO1B DHRCF Pumps (5)

RC PC IC Control 86 RL017 ESF MCB CB Yes Yes RL cool/dry DHRCF Panel (20)

BC PC IC Control 87 RL020 ESF MCB CB Yes Yes RL cool/dry DHRCF Panel (20)

BC PC IC Control 88 RL021 REACTOR AUXILIARIES PANEL CB Yes Yes RL cool/dry DHR CF Panel (20)

Control 89 RPO81A/B SUBCOOLING MONITORING CABINET CB Yes Yes DHR RP cool/dry Panel (20)

BC PC IC Control 90 RP290 DC DISTRIBUTION AUX Yes Yes RP mild/dry DHRCF Panel (20)

RC PC IC Control 91 SA036E ESFASCH4 LOGIC CABINET CB/CC Yes Yes SA cool/dry DHRCF Panel (20)

Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 10 WCAP- 17678-NP November 2012 Revision 0

G-12 Seismic Walkdown Equipment Ust, Rev. 0 Attachment to LTR-RAM-I1-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment I - SWEL 1 Wolf Creek Generating Station Scrcree r Screen Screen #4 Sample Considerations SEN1 Screen #3Walkdown e Walkdown #2 Major new Deferred Nmer Equipment Description Building ( - (Safet Equipment System or Environment Coment Number Licensing In?) Function Class Type replacement (Temp, 'F) vulnerability ta Basis?) Support) equipment? enhancement? Outage?

RC PC IC Control 92 SB032C W SS PROT SYSOUT 1 TRN CB/CC Yes Yes RS cool/dry DHRCF Panel (20)

RC PC IC Control 93 SB032D W SS PROT SYSOUT 2 TRN CB/CC Yes Yes SB cool/dry DHRCF Panel (20) 94 SB041 ~ WB4CB/CC PROCESS ANALOGPROTECTION SET Yes Yes RCPC IC Control SB cool/dry CAB-04 DHRCF Panel (20)

Control 95 SB079 RPVLEVELINSTRSYSPROCPROTSYS CB Yes Yes IC SB cool/dry Panel (20)

Control 96 5E032 SOURCE RANGECCHANNEL 2 PREAMP AUX Yes Yes RC SE mild/dry Yes Panel (20)

Control 97 SE0S4B W NUC INSTM NIS2 CB/CC Yes Yes RC SE cool/dry Yes Panel (20)

Control 98 SENYO61A EXCORENEUTRON DETECTOR AMPLIFIER AUX Yes Yes RC SE mild/dry Yes Panel (20)

RC PC IC 99 SGKO4B CONTROL ROOM A/C UNITS AUX Yes Yes AHU(10) GK X mild/dry X DHRCF RC PC IC 100 SGKO5B CLASSIE ELEC.EQUIP. A/C UNIT CB/CC Yes Yes AHU(10) GK X cool/dry X Yes DHRCF 101 SGLO98 ROOM COOLERFOR PEMO1B AUX Yes Yes AHU(10) GL hot/dry OHR 102 SGLOB RHRPUMP ROOM COOLER AUX Yes Yes ICDHR AHU(10) GIL hot/dry 103 SGL158 PENETRATION ROOM COOLER AUX Yes Yes CF AHU(10) GL mild/dry RC PC IC 104 TEGOIB CCW SURGE TANKB AUX Yes Yes Tank (21) EG mid/dry DHRCF Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 11 WCAP- I 7678-NP November 2012 Revision 0

G- 13 Seismic Walkdown Equipment Ust, Rev. 0 Attachment to LTR-RAM-lI-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment I - SWEL 1 Wolf Creek Generating Station Screen Screen Screen Screen #4 Sample Considerations Walkdown SWEL Walkdown #2 H3 Major new Deferred Item Equipment Description Building (SC - 1 (Screens (Safety Equipment System or Environment IPEEE toComments Number Licensing In?) Function Class Type replacement (Temp, *F) vulnerability to Basis?) Support) equipment? enhancement? Outage?

RC PC IC 105 TJE02B EMERGENCY FUEL OIL DAY TANK DGB Yes Yes Tk DHR CF rn 2) )o J o/ui u 106 TKA04 AFW CTRL/MAIN STEAM ARV ACCUM AUX Yes Yes PC DHR Tank (21) KA mild/dry RC PC IC 107 TKJO1B D/G BJACKET WATER EXPANSION TANK DGB Yes Yes Tank (21) hot/humid DHR CF T RC PC IC 108 TKJ02C START AIR TANK D/G DGB Yes Yes Tank (21) hot/humid DHR CF RCPCIC 109 TKJO4B D/G B AUX LU BE OIL TANK DGB Yes Yes 'HRDHR CFCF Tank (21)

Tn 2) K hot/humid o/ui RC PC IC Transformer 110 XNG02 CLASS 1E LOAD CENTER TRANSFORMER CB/CC Yes Yes NG cool/dry Yes DHRCF (4)

Transformer 111 XNGO6 FEEDS MCC NG06E ESW Yes Yes IC DHR NG hot/dry Yes (4)

Transformer 112 XPNO8B 120 V INSTRUMENT AC TRANSFORMER CB/CC Yes Yes IC DHR PN cool/dry (4)

- React Resctsly Cotnol (RRC)

Rector Coasnt Pressur Conrct (RCPC)

Rector Cotaant tenet0wyCteaol (RCIC)

PecayNeatRemova I(DHR)

Castalseet Funaoto (CF)

Wolf Creet Seismic Walkdown Equipment Ust September 7, 2012 Page 12 WCAP- 17678-NP November 2012 Revision 0

G- 14 Seismic Walkdown Equipment List,Rev. 0 Attachment to LTR-RAM-II-12-083 NTTFRecommendation 2.3: Seismic Walkdown Attachment 2 -SWEL 2 Wolf Creek generating Station SWEL Screen #1 Associated Item Walkdown DsrpinBuilding Equipment System (Seismic Screen #2 with Rapid Comment Number Equipment Class Type Licensing (Screens In?) Draindown?

Basis?)

Heat 1 EEC001B FUELPOOLCOOUNG HEATEXCHANGER EC FR Yes Yes No EIchangers 2 SGG04B SFP PUMP ROOM COOLERB AHU GG GG Yes Yes No 3 PECOIB FUELPOOLCOOLING PUMP PUMP EC FB Yes Yes No 4 ECHV012 FUELPOOL HEATEXCHANGER SHELLSIDEOUTLETISO MOV EC FB Yes Yes No FUELPOOL COOLING PUMP DISCHARGE FLOW 5 ECFTO018 TRANSMITTER Inst. Racks EC FB Yes Yes No Wolf Creek Seismic Walkdown Equipment List September 7, 2012 Page 13 WCAP- 17678-NP November 2012 Revision 0

H-1 APPENDIX H QUALIFICATIONS WCAP-17678-NP November 2012 Revision 0

H-2 Seismic Walkdown and SWEL Development Resumes David A. Bersi, P.E.

Thirty-seven years experience in Mechanical and Project Engineering design, analysis, construction support, and operating plant support in the Nuclear Power Generation and Petrochemical industries.

Education University of Arkansas, BS Mechanical Engineering, 1975 Registered Professional Engineer, Texas #48444 Westinghouse PM-2 Project Management Qualification Professional Experience Westinghouse (May 2006 - Present)

As Project Manager and Principal Engineer, participated inCPNPP support activities for Safety Injection System Check Valve Replacement, support of Plant and Systems Engineering for various Corrective Action Program issues, Outage Support, Condition Report Resolution, and Engineering Improvement Initiatives. Functioned as Acting Manager of the Dallas Core Design and Safety Analysis Group for 5 months. Supported an Equipment Reliability Kaizen, and led a Materials Management Program Self Assessment. Supported System reviews at Fort Calhoun Station and TVA Watts Bar plants. Provided Engineering support for Passive Containment Cooling System Storage Tank design and analysis and Modular Isometric reviews.

As Project Manager and Deputy Project Manager for the Waterford 3 Replacement Steam Generator Project, held responsible for overall project management, execution and customer satisfaction for the design, manufacture, shipment, and installation support activities relating to Waterford 3 Replacement Steam Generators by providing the schedule integration and task coordination to manage the project, the day to day project direction, the cost and schedule baseline control management, and the interface with the customer, fabricator, and installer, as well as internal organizations.

As Principal Project Engineer for CPNPP Replacement Steam Generator, Replacement Reactor Vessel Closure Head, and Head Assembly Upgrade Package Project, acted as the Project Engineer and Component Lead Engineer for the design and fabrication of the indicated components.

WCAP-17678-NP November 2012 Revision 0

H-3 David A. Bersi, P.E.

Page 2 Professional Experience (cont.)

TXU Electric (Sept 1987- May 2006)

As Consulting Project Engineer for CPNPP Replacement Steam Generator, Replacement Reactor Vessel Closure Head, and Head Assembly Upgrade Package Project, acted as the Project Engineer and Component Lead Engineer for the design and fabrication of the indicated components.

Acting Testing Group Supervisor for 5 months supporting testing activities for the refueling outage.

As System Engineer, performed duties for Reactor Coolant, Residual Heat Removal, Safety Injection, Liquid, Gaseous, and Solid Waste Processing, Steam Generator Blowdown, Boron Recycle, Station Service Water, Component Cooling Water, Chemical Feed, and Primary Plant Ventilation for Safeguards Building, Auxiliary Building, Primary Plant, and Fuel Building Ventilation Systems. Also, back-up System Engineer Auxiliary Feedwater, Post Accident Sampling, and Secondary Sampling.

Responsible for preparation of material and teaching of assigned Systems for the Plant Certification Class. 10CFR50.59 Evaluator Qualified and Subject Matter Expert, and CPSES Mechanical Equipment List Subject Matter Expert. Member ofEmergency Response Organization. Westinghouse Owner's Group System Engineering Representative. System Engineering ALARA committee representative. System Engineering representative to Reactor Coolant Pump and Motor Management Team. Site Safety Steering Committee representative.

Engineering duties during construction completion, initial start up, and operation phases at CPNPP.

Activities included system and modification reviews, testing reviews, licensing and FSAR reviews, calculation reviews, and procurement documentation reviews.

OTHER (May 1975 - Sept 1987)

Various Project Mechanical Engineering assignments in the Nuclear and Petrochemical Industries.

WCAP-17678-NP November 2012 Revision 0

H-4 Timothy S. Nealon Education 2010 - 2012 University at Buffalo, Buffalo, New York Master of Science, Civil Engineering (MSc) 2006- 2010 University at Buffalo, Buffalo, New York Bachelor of Science, Civil and Environmental Engineering (BSCE)

Professional Capabilities Structural analysis and design of steel, concrete, and masonry structures using IBC and UBC Dynamic analysis of structures for seismic, vibration, blast, fluid, and wind loads Competed the NTTF Recommendation 2.3 Plant Seismic Walkdown training course Finite element modeling and analysis including use of ABAQUS, and SAP2000 Professional History 2012 - Present Stevenson and Associates, Goodyear,Arizona Engineer Project Experience Summary Seismic FragilityProjects Mr. Nealon has performed seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments. Mr. Nealon has executed the seismic analyses of concrete foundations, masonry walls, large storage tanks, piping, and electrical and mechanical equipment anchorages. In addition, Mr. Nealon has performed seismic walkdowns of tank and their associated leakpath piping to assess loss of inventory in the event of beyond design basis seismic events. He has assessed piping systems for excessive stresses due to differential support movement and performed subsequent analyses using manual and finite element methods.

WCAP-1 7678-NP November 2012 Revision 0

2',~

1.~

I t :4-

'2 - ~. .

.1 __ Ft~

-a z A 4<..

  • S . / i Certificate of Completion Tim Nealon Successfulhlj Completed Training on Near Term Task Force Recommendation 2.3 - Plant Seismic Walkdowns Date: 06/26/12 Bruce M. Lor- Instructor NTTF 2.3 Seismic Walkdown Course z0

(~

1' C

C

H-6 Derek J. Seaman Education WP Carey School of Business at Arizona State University, Tempe, Arizona - May 2011 Master of Business Administration, Finance Emphasis Oregon State University, Corvallis,Oregon - December 2005 Bachelor of Science, Nuclear Engineering Professional Experience Senior Engineer, Westinghouse Electric Company, June 2009 - Present Major Responsibilities

  • Manage final-stage engineering projects as part of multi-million dollar nuclear fuel campaigns.

Includes attending senior management meetings and coordinating efforts of an 8 engineer team.

  • Quantify equipment risk by performing plant walkdowns and developing risk assessments.
  • Rotate through various plant outage positions to learn multiple aspects of refueling outages and work with systems hands on.

0 Conduct reload engineering analyses to ensure safe implementation of core designs.

0 Perform apparent cause analyses to correct plant issues and prevent recurrence.

Accomplishments 0 Authored, reviewed and mentored all aspects of the nuclear fuel reload process.

0 Successfully project managed multiple fuel reload campaigns with fuel valued over $100 million.

0 Modeled multiple reloads analyses in SIMULATE under customer's quality program.

0 Analyzed fuel CRUD load to support lowering plant operating pressure which helped result in saving an unnecessary plant shutdown.

  • Performed and implemented multiple corrective actions to correct quality and non conforming errors.

WCAP-17678-NP November 2012 Revision 0

H-7 Derek J. Seaman Page 2 Professional Experience (cont.)

Engineer, Westinghouse Electric Company, February2006 - June 2009 Major Responsibilities

  • Evaluate power increase proposals from a safety analysis perspective to enable power utilities to generate additional revenue.
  • Create monthly budgets and acquire necessary funding from management to resolve quality related rework within the engineering organization as part of customer focus.
  • Analyze system and human performance failures as an apparent cause investigator and provided innovative plans to prevent reoccurrence.

Accomplishments

  • Designed and implemented a quality assurance metrics system decreasing quality related costs saving nearly $ 1OOK in first year group implementation and improving customer relations.
  • Managed group's quality assurance and implemented corrective actions to reduce quality related errors by nearly 8% in the first year.

Professional and Community Relations Team Captain, American Cancer Society Climb to Conquer Cancer - 2008-Present Planned and organized 9 climbs raising over $40,000 to fight cancer.

0 Worked with company executives to improve company visibility in the community.

Volunteer, Phoenix Baptist Hospital -2007-2008 Policy Chairman, North American Young Generation in Nuclear (New England Chapter) - 2006-2007 WCAP-17678-NP November 2012 Revision 0

H-8 Timothy W. Solberg Education 2010 - 2011 Stanford University, Stanford, California Master of Science, Structural Engineering (MS) 2005- 2009 Rice University, Houston, Texas Bachelor of Science, Civil and Environmental Engineering (BSCE)

Professional Capabilities Earthquake hazard and risk analysis Seismic design of structural systems Structural design and analysis of steel and concrete structures Dynamic analysis of structures Completed EPRI Fundamentals of Equipment Seismic Qualification Training Competed NTTF Recommendation 2.3 Plant Seismic Walkdown Training Professional History 2012 - Present Wolf Creek Nuclear OperatingCorporation,Burlington,Kansas Design Engineer 2011 - 2012 Risk Management Solutions, Inc., Hoboken, New Jersey Risk Analyst Experience Summary Wolf Creek Nuclear OperatingCorporation Mr. Solberg has participated in various civil, structural, and seismic engineering tasks while at Wolf Creek. He has developed experience in civil/structural design and supports in addition to seismic analyses and evaluations of plant systems and components.

Risk Management Solutions, Inc.

Mr. Solberg worked with a risk assessment company to accurately predict building and casualty losses that would arise from natural and man-made catastrophes. He worked on using theory from the hazards of earthquakes, hurricanes, and other extreme events to quantify the potential vulnerability and damage to structures and their inhabitants, and interpreting these results to clients.

WCAP-1 7678-NP November 2012 Revision 0

ELETRC PWE Certificateof Completion Tim Solberg Training on Near Term Task Force Recommendation 2.3

- Plant Seismic Walkdowns July 11, 2012 Date Robert K. Kassawara EPRI Manager, Cz Structural Reliability & Integrity CD

H-10 Hunter A. Young, P.E.

Education 2008 - 2009 Massachusetts Institute of Technology, Cambridge,Massachusetts Master of Engineering, Structural Engineering (MEng) 2002 - 2006 University of Notre Dame, Notre Dame, IN Bachelor of Science, Civil and Environmental Engineering (BSCE)

Registration and Affiliations Registered Professional Engineer, California, No. C79404 Member of ASCE, ASME Professional Capabilities Structural analysis and design of steel, concrete, and masonry structures using IBC and UBC Dynamic analysis of structures for seismic, vibration, blast, fluid, and wind loads Competed SQUG training course for walkdown and fragility analysis of nuclear facilities and their components Finite element modeling and analysis including use ofANSYS, SOLVIA, GTStrudl, and SAP2000 Vehicle barrier design for the protection of plant facilities and personnel Project management including planning, scheduling, and preparing technical reports Risk and hazard analysis Construction support and inspection Professional History 2009 - Present Stevenson andAssociates, Woburn, Massachusetts Senior Engineer 2007- 2008 Hensel Phelps Construction Company, Washington, D.C.

Field Engineer WCAP-17678-NP November 2012 Revision 0

H-11 Hunter A. Young, P.E.

Page 2 Project Experience Summary Seismic FragilityProjects Mr. Young has managed and led seismic walkdowns and fragility analyses of structures and components for use in probabilistic risk assessments. On these projects, he has walked down both Safety Related and non-Safety Related structures, systems, and components in all areas of the power block. Mr. Young has executed the seismic analyses of braced steel frames, concrete foundations, masonry walls, large storage tanks, and electrical and mechanical equipment anchorages. In addition, Mr. Young has performed the walkdown and analysis of tank structures and their associated leakpath piping to assess loss of inventory in the event of beyond design basis seismic events. He has assessed piping systems for excessive stresses due to differential support movement and performed subsequent nonlinear analyses using manual and finite element methods.

Miscellaneous NuclearProjects Mr. Young has conducted seismic analysis of Safety Related structures with soil structure interaction using both response spectrum and nonlinear time history methodologies. He has analyzed and designed stilling wells for hydrodynamic loads in cask loading pit. He has evaluated penetration/cut reinforcement for cask loading pit concrete walls and assessed the modification of steel support frames for spent fuel cask. Mr. Young has performed structural evaluation of the rigging operation for the replacement of the main generating startup transformer. Additionally, he has developed risk analyses using contingency matrices for transformer replacement and rigging operations.

Security/Blast Loading Projects Mr. Young has performed blast analyses of existing structures for minimum safe standoff distances and subsequently designed passive vehicle barrier systems. He has conducted preliminary wind and seismic loading analysis for the conceptual design of a new security facility. Mr. Young has designed structural supports for equipment vulnerable to shock loading. He has designed foundations for new security structures.

WCAP-17678-NP November 2012 Revision 0

CD CD CD 0j

H-13 Peer Review Team Rksum s Todd A Bacon Education 1976 - 1980 University of Illinois - Urbana-Champaign Bachelor of Science - Civil Engineering Registration/Certification Professional Engineer: California License No. C-0336104 (Civil), Georgia License. No. 015562, Ohio License No. E-57497 Professional History 2012 - Present Stevenson & Associates, Charlotte, North Carolina, Senior Consultant and General Manager, Charlotte, NC Office 1980-2012 AREVA Inc., Charlotte, NC, Engineering Manager Professional Experience Mr. Bacon has thirty years of experience in the design and modification of mechanical and structural systems. His responsibilities as an Engineering Manager have included work from the conceptual design through to the installation support phases of projects. Mr. Bacon has served as Project Engineer and Project Manager for numerous work scope efforts, including coordination of personnel in multiple locations. The efforts have also included significant client and/or regulatory interface, as required. These activities have also included responsibility for budgets, schedules and the technical accuracy of work performed. In addition, he has extensive experience in proposal and report development, as well as personnel training activities.

Mr. Bacon's work has involved extensive use of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, including various piping system related committees. These have included the design group for the HDPE buried pipe group of Section III, and the Flaw Analysis group of Section XI.

Other Code experience includes the American Institute of Steel Construction (AISC), American Concrete Institute (ACI), and ASME (ANSI) B3 1.1 and B331.3 codes. He serves on the AREVA College of Experts in the areas of structural and dynamic analysis and is also fluent in using numerous piping and finite element computer programs, as well as in typical frame analysis programs.

WCAP-17678-NP November 2012 Revision 0

H-14 Todd A Bacon Page 2 Professional Experience (cont.)

EngineeringManager,Civil and Layout Department ARE VA NP Inc.

Mr. Bacon served as an Engineering Manager in the Civil and Layout Department in Charlotte, North Carolina. In this role he was responsible for the efforts involving work on the 3D model for an AREVA US EPR plant being designed for the Calvert Cliffs site in Maryland. His areas of responsibility also included the balance of plant piping system design efforts for the plant. In this role, he was involved with interfaces with numerous groups utilizing the 3D model information, as well as consortium partner Bechtel Power, and AREVA offices throughout the US and Europe who served as subcontractors for various portions of the overall project scope of work. This included coordinating the efforts of approximately fifty individuals for these efforts involving technical resolution of issues, manpower planning, personnel issues, and development of the group.

In addition to the managerial responsibilities, he was a member of the AREVA College of Experts in the area of mechanics and fluid mechanics. This group was comprised of approximately one percent of the company worldwide which served as the technical leaders for the company, shfaring best practices and knowledge throughout the global organization.

In addition to the New Plants activities in the US, Mr. Bacon supported efforts involving current activities for the International Thermonuclear Experimental Reactor (ITER) effort in which AREVA had the responsibility for the Cooling System involving the piping system evaluations and development of Technical Guides and impact to the building resulting from the piping system.

He previously served as an Engineering Manager in the Structural and Engineering Mechanics Group, working on projects involving operating plants. As a Project Engineer and Manager, he helds responsibility for leading project teams in technical areas, as well as in budget and schedule item tracking functions.

Examples of typical projects include the following:

Mixed Oxide (MOX) Fuel FabricationFacility,Savannah River Site - Conducted third party review of overall project identifying ways to achieve efficiencies and improve production rates for the building design and construction effort. This resulted in numerous recommendations for the site to improve production in the areas of scheduling, group interfacing (engineering disciplines, construction, etc.),

procedural development as well as improvements through procedural revisions. This also included performing as the lead engineer on projects for the facility involving development of procedures for field routing of small bore piping systems, as well as conduit runs.

WCAP-1 7678-NP November 2012 Revision 0

H-15 Todd A Bacon Page 3 Professional Experience (cont.)

ECCS DebrisBlockage Issue, Tokyo Electric Power Company (TEPCO) - Established contact and led proposal efforts to obtain contracts for ECCS suction strainer replacements for first plant performing this scope in Japan. Subsequently won contracts for two additional TEPCO units as well, resulting in $ 8M in revenue for AREVA. This work involved extensive interface and oversight of the strainer hardware vendor during the design, fabrication an!d construction phases of the projects.

ASME BPVC Work, Various Facilities- Served in positions of increasing responsibility performing and reviewing ASME Boiler and Pressure Vessel Code work in the Structural and Engineering Mechanics Group. Work included Class 1 analyses of flued heads, mechanical equipment evaluations and numerous piping system analyses.

ECCS Debris Blockage Issue, involving numerous US B WR clients - Served in various roles including Project Engineer, Project Manager, and Technical Consultant. Had a significant amount of involvement with this issue including involvement with the BWR Owner's Group for this issue spanning numerous years.

GL 96-06 Operabilityand Design Basis Resolution, Oconee Nuclear Station, Duke Power - Served as the Project Engineer for the Operability Evaluation for the Oconee Nuclear Station in an effort to show all three units operable under the additional loadings resulting from the USNRC Generic Letter. This assessment included evaluation of the LPSW system, including piping, supports, equipment nozzles, as well as structural platforms and associated components. In addition, operability guidelines were developed for Oconee during this effort.

Reactor Cavity DrainLine Modifications, PalisadesNuclear Power Plant, Consumers Power - Project Manager for the Reactor Cavity Drain Line modifications and letdown piping support modifications at the Palisades Plant. Work scopes included both engineering functions and the generation of modification package paperwork.

NRC Bulletin 79-14 Large-BorePipingProject Evaluation,D. C. Cook Nuclear Power Plant, Indiana/MichiganPower - Work included serving as Project Engineer to evaluate the adequacy of D.C.

Cook's NRC Bulletin 79-14 Large-Bore Piping Project. The work scope involved supervising a project team performing piping and piping support evaluations. Conclusions drawn from this study have enabled the client to realize significant cost savings during recent maintenance outages through discrepancy trending and margin assessment studies.

ReactorPressure Vessel Bottom Head DrainLine Unplugging Project,Dresden Nuclear Generating Station Units 2 & 3, Commonwealth Edison. Included serving as Project Engineer responsible for unplugging reactor pressure vessel bottom head drain lines for Dresden Units 2 and 3. This project was successfully completed within schedule and budget constraints, and also was part of the Unit 2 critical path outage work.

WCAP-17678-NP November 2012 Revision 0

H-16 Todd A Bacon Page 4 Professional Experience (cont.)

HPCI System SpargerModification, Quad Cities Nuclear GeneratingStation, CornEd- Served as the Structural and Engineering Mechanics Project Engineer and Manager for Quad Cities Unit 1 and 2 high pressure coolant injection (HPCI) system modification, which resulted in the addition of a sparger assembly inside the torus. The project also included the addition of platforms to provide accessibility for personnel performing maintenance activities at both units.

Hardened Wetwell Vent Project Third PartyReviews, Dresden and Quad Cities Nuclear Generating Stations, CornEd- Led the third party reviews of the hardened wetwell vent projects for the Dresden and Quad Cities stations. These projects involved the evaluation of existing, as well as new, piping and auxiliary steel. Design codes used for the mechanical work included ASME Section III, Subsections NC, ND, NE and NF, as well as AISC and Uniform Building Code (UBC) standards for the structural evaluations.

StructuralProjects, Various Facilities- Past projects have included extensive structural experience, such as the Hope Creek Nuclear Generating Station's drywell inner water seal plate analysis, and also Mark I piping and pipe support evaluations. Previous work also included extensive experience working on various mechanical and structural design projects.

Licensing and Special Projects,Comanche Peak Steam Electric Station, TU Electric - Involved in licensing and special studies projects for the Comanche Peak Station.

SSFI Audit Responses, CoinEd - Participated in responding to concerns raised during safety system functional inspection (SSFI) audits.

Project Summary Reports and OperabilityGuidelines, CoinEdand AEPSC - Wrote numerous project summary reports and operability guidelines for Commonwealth Edison (ComEd) and American Electric Power Company (AEPC).

Piping,Piping Support andHVAC Modifications, Various Facilities- Served as Project Engineer for piping, piping support and HVAC modification work for various nuclear plants, including Dresden Units 2 and 3, Quad Cities Units 1 and 2, D. C. Cook Units 1 and 2, and Duane Arnold. Project Engineer responsibilities included coordinating schedule and budget issues, as well as addressing technical questions as they arose.

Control Rod Drive Frame Analysis, Browns FerryNuclear PowerPlant, Tennessee Valley Authority (TVA) - Involved in the analysis of the control rod drive frames for the Browns Ferry Plant.

WCAP-17678-NP November 2012 Revision 0

H-17 Gary L. Douglas Principal Engineer, Risk Applications & Methods Westinghouse Nuclear Services Division Education B.S. Oceanography U.S. Naval Academy Nuclear Power Program United States Navy M.Eng. Materials Science Cornell University Summary Mr. Douglas is a Principal Engineer in the Risk Applications and Methods Group of the Systems & Risk Applications Engineering Department of Westinghouse's Nuclear Services Division. He has 14 years of experience with PWR design, including qualifications in the Navy Nuclear Power Program. He has safety analysis experience in the Nuclear Power and Aerospace Industries. He worked as an engineer for 9 years at South Texas Project Electric Generating Station, with emphasis on root cause analysis, reliability engineering, systems engineering and PRA applications analysis. He worked as an engineer for 10 years at Hamilton Sundstrand, with emphasis on root cause analysis, FMEA, and safety hazards analysis ofjet engine controls and space & submarine life support systems.

Specifically, Mr. Douglas's prior engineering experience as an engineer in the Navy Nuclear Power Program and at South Texas Project Electric Generating Station has afforded him plant-wide hands-on experience with all safety and non-safety related equipment comprising military and commercial nuclear steam supply systems.

Mr. Douglas is presently involved in PSA applications activities for several plant sites, with emphasis on External Events and Internal Flooding PRA Modeling. He recently completed a site visit to Fort Calhoun Station for the purpose of performing verification walkdowns of systems supporting the station's PRA model.

Some of the recognitions Mr. Douglas has achieved over his career include the following: Distinguished Midshipman Award, 1983; Advanced Root Cause Analysis Certified, 1996; INPO Recognition as South Texas Project Plant Doctor, 1997; AS9 100 Certified Quality Engineer, 2005; NASA Environmental Controls & Life Support Systems Award, 2011 (for contributions to the Oxygen Generation System aboard the International Space Station).

November 2012 WCAP-1 7678-NP WCAP-17678-NP November 2012 Revision 0