ML12342A261

From kanterella
Jump to navigation Jump to search
WCAP-17678-NP, Rev. 0, Wolf Creek Generating Station Post-Fukushima NTTF 2.3 Seismic Walkdown Submittal Report. Appendix a, Seismic Walkdown Checklists (Swcs) Page A-321 Through Page A-350
ML12342A261
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/30/2012
From:
Wolf Creek
To:
Office of Nuclear Reactor Regulation
References
ET 12-0032 WCAP-17678-NP, Rev 0
Download: ML12342A261 (30)


Text

A-321.

Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RL021 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

REACTOR AUXILIARIES PANEL Interaction Effects

7. Aire soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: Hunter Young Date: 11-15-12 ei -- Timothy Nealon 11-15-12 WCAP-17678-NP November 2012 Revision 0

A-322 Status: T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RL021 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

REACTOR AUXILIARIES PANEL Photos RL021 9-18 113 wI K11 a I1"17 -1.1U-1 RL021 9-18 115 RL021 9-18 116 WCAP- 17678-NP November 2012 Revision 0

A-323 Status: m-Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RL021 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

REACTOR AUXILIARIES PANEL W1-1,1r~ tl-l 11/f w4 IrIIl .1_11,M 11M1 RL021 9-19 002

'LUZ I t--IU UU1 WCAP- 17678-NP November 2012 Revision 0

A-324 Status: M-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RL021 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

REACTOR AUXILIARIES PANEL I'LUZI V-'1V UUJt IKLUZ 1 f-1*1U UU4 WCAP-17678-NP November 2012 Revision 0

A-325 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RL021 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

REACTOR AUXILIARIES PANEL RL021 9-19 005 RL021 9-19 006 November 2012 WCAP-1 7678-NP WCAP- 17678-NP November 2012 Revision 0

A-326 Status: [-M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RL021 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

REACTOR AUXILIARIES PANEL RL021 9-19 007 WCAP- 17678-NP November 2012 Revision 0

A-327 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP081A/B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

SUBCOOLING MONITORING CABINET Project: WCNOC SWEL Location (Bldg, Elev, Room/Area): CTRL, 2047.50 ft, 3605 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

WCAP-17678-NP November 2012 Revision 0

A-328 Status: L N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP081A/B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

SUBCOOLING MONITORING CABINET Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

SWT noted same top support bolting modification as for SB041. Verify whether modification documents the qualificationreconciliationof individual equipment.

Licensing Basis Evaluation: Condition is analyzed per WCNOC Calculation XX-FH-009-002. No adverse seismic concern.

Comments Evaluated by: Hunter Young Date: 11-15-12 WCAP-17678-NP November 2012 Revision 0

A-329 Status: l N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP081 AB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

SUBCOOLING MONITORING CABINET Timothy Nealon 11-15-12 Photos RP081A#B 9-18 180 RP081A#B 9-18 181 WCAP-17678-NP November 2012 Revision 0

A-330 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP081AIB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

SUBCOOLING MONITORING CABINET I-VIUIA/;Ib U-16 I6Z RP081A#B 9-18 183 WCAP-17678-NP November 2012 Revision 0

A-331 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP081A/B Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

  • 1 SUBCOOLING MONITORING CABINET I

RP081A#B 9-18 185 RP081A#B 9-18 184 November 2012 WCAP-1 7678-NP WCAP-17678-NP November 2012 Revision 0

A-332 Status: Mi N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP081AIB Equipment Class: (20) Instrumentation and Control Panels and Cabinets RP Equipment

Description:

SUBCOOLING MONITORING CABINET RP081A#B 9-18 186 RP081A#B 9-18 187 I'UUIAFb U-16IOU1 WCAP-17678-NP November 2012 Revision 0

A-333 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP290 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

DC DISTRIBUTION Project: WCNOC SWEL Location (Bldg, Elev, Room/Area): AUX, 2047.50 ft, 1501 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% Jo of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

WCAP-17678-NP November 2012 Revision 0

A-334 Status: F-Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP290 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

DC DISTRIBUTION Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Observed a fuse lying unattachedinside of cabinet. WCNOC Operations indicated that CR already written and fuse allowed. No adverse seismic concern.

Comments Evaluated by: Hunter Young Date: 11-15-12 TimothyNealon 11-15-12 WCAP-17678-NP November 2012 Revision 0

A-335 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP290 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

DC DISTRIBUTION Photos RP290 9-19 413 RP290 9-19 414 November 2012 WCAP-1 7678-NP WCAP-I 7678-NP November 2012 Revision 0

A-336 Status: Ml N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: RP290 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment DescriDtion: DC DISTRIBUTION RP290 9-19 416 RP290 9-19 418 WCAP-17678-NP November 2012 Revision 0

A-337 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SA036E Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESFAS CH4 LOGIC CABINET Project: WCNOC SWEL Location (Bldg, Elev, Room/Area): CTRL, 2047.50 ft, 3605 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% YE*S of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

WCAP-17678-NP November 2012 Revision 0

A-338 Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SA036E Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESFAS CH4 LOGIC CABINET Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes Adjacent cabinets are 1/16" apart. Check that cabinets are bolted together so as to preclude chatter.

Licensing Basis Evaluation: SWT review of WCNOC CalculationXX-FH-009-002 confirms that cabinet SAO36E has been analyzed for proximity concerns with adjacent cabinets and is therefore acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by: Hunter Young Date: 11-15-12 WCAP-17678-NP November 2012 Revision 0

A-339 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SA036E Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESFAS CH4 LOGIC CABINET

/A i*, Timothy Nealon 11-15-12 Photos SA036E 9-18 145 WCAP- 17678-NP November 2012 Revision 0

A-340 Status: E-i] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SA036E Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESFAS CH4 LOGIC CABINET SA036E 9-18 146 SA036E 9-18 147 WCAP-17678-NP November 2012 Revision 0

A-341 Status: F] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SA036E Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESFAS CH4 LOGIC CABINET SA036E 9-18 148 SA036E 9-18 149 WCAP- 17678-NP November 2012 Revision 0

A-342 Status: 7 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 1 TRN Project: WCNOC SWEL Location (Bldg, Elev, Room/Area): CTRL, 2047.50 ft, 3605 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% 0o IN of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

WCAP-17678-NP November 2012 Revision 0

A-343 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 1 TRN Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

SWT noted a modification to add top support to fasten SBD32D to SBD33A.

Verify whether modification documents the qualificationreconciliationof individual equipment.

Licensing Basis Evaluation: Condition is analyzed per WCNOC Calculation XX-FH-009-002. No adverse seismic concern.

Comments Evaluated by: Hunter Young Date: 11-15-12 November 2012 WCAP-1 7678-NP WCAP-17678-NP November 2012 Revision 0

A-344 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 1 TRN Timothy Nealon 11-15-12 Photos SBO32C 9-18 189 SBO32C 9-18 191 WCAP-17678-NP November 2012 Revision 0

A-345 Status: Mj N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 1 TRN SBU32(;

I.11bu-jZU :5*U3ZL; 9-1* 19b WCAP-17678-NP November 2012 Revision 0

A-346 Status: E[l N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032C Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 1 TRN SB032C 9-18 196 I111U,3 ZU 'IV I

SB032C 9-18 198 SB03 2C 9-18 199 WCAP-17678-NP November 2012 Revision 0

A-347 Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 2 TRN Project: WCNOC SWEL Location (Bldg, Elev, Room/Area): CTRL, 2047.50 ft, 3605 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50% No of SWEL items requiring such verification)?
2. Is the anchorage free of bent, broken, missing or loose hardware? Yes
3. Is the anchorage free of corrosion that is more than mild surface oxidation? Yes
4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes
5. Is the anchorage configuration consistent with plant documentation? (Note: Not Applicable This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

WCAP-1 7678-NP November 2012 Revision 0

A-348 Status: Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 2 TRN Interaction Effects

7. Are soft targets free from impact by nearby equipment or structures? Yes
8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and Yes masonry block walls not likely to collapse onto the equipment?
9. Do attached lines have adequate flexibility to avoid damage? Yes
10. Based on the above seismic interaction evaluations, is equipment free of Yes potentially adverse seismic interaction effects?

Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

SWT noted a modification to add top support to fasten SBD32D to SBD33A.

Verify whether modification documents the qualificationreconciliationof individual equipment.

Licensing Basis Evaluation: Condition is analyzed per WCNOC Calculation XX-FH-009-002. No adverse seismic concern.

Comments Same Cabinet enclosure as SB032C (see notes)

Evaluated by: Hunter Young Date: 11-15-12 WCAP-17678-NP November 2012 Revision 0

A-349 Status: N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032D Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment

Description:

W SS PROT SYS OUT 2 TRN

/ $' Timothy Nealon 11-15-12 Photos SB032D 9-18 190 SB032D 9-18 191 WCAP-17678-NP November 2012 Revision 0

A-350 Status: M N U Seismic Walkdown Checklist (SWC)

Equipment ID No.: SB032D Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment

Description:

W SS PROT SYS OUT 2 TRN SB032D 9-18 192 SB032D 9-18 194 SB032D 9-18 195 WCAP-17678-NP November 2012 Revision 0