ML17309A390

From kanterella
Revision as of 05:12, 10 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Rev 12 to QA Program for Station Operation
ML17309A390
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1986
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17309A389 List:
References
NUDOCS 8612230369
Download: ML17309A390 (115)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION R.E. GINNA NUCLEAR POWER PLANT Revision 12 to:

Quality Assurance Program For Station Operation DOCKET NO. 50-244 December 1986 8612230369 861218 PDR ADOCK 05000244 PDR P

Introduction In a May 28, 1974 letter from Nr. Robert A. Purple, the United States Atomic Energy Commission asked several questions on the R. E. Ginna Quality Assurance Program for Station Operation. The information requested and further clarification oi the program are provided in Supplement IV to the Technical Supplement accompanying Application for a Full-Term Ojeratinc License. Supple-ment IV is a revised description of the R.E. Ginna Quality Assurance Prograni for Station Operation and supersedes Supplement II into its entirety. The following revisions have been made the description of the program:

Section IV.2 Additions That all Quality Assurance, Quality Control, Engi-neering, and Purchasing procedures are reviewed for adequacy at least once every two years.

That the list of structures, systems, and components covered by the quality assurance. program are based on the list in Section 1.2.1 of the FSAR.

The management review of the quality assurance program may be in a form other than an audit.

That the huclear Safety Audit and Review Board is required to review the status and adequacy of the quality assurance program at least once every two years.

That the Chairman of the Nuclear Safety Audit and Review Board reports to the Chairman of the Board of Rochester Gas and Electric Corporation on NSARB activities.

Section IV.3 Additions.

That spare or replacement parts meet, at least, the requirements oi the original design.

w 0

That for plant modification, the design engineer selects and reviews materials, parts, and equipment for suitability of application.

That design deficiencies are documented and controlled in accordance with Section IV.16.

That design documents are collected, stored, and main-tained in accordance with Section II.17 and a listing of which design documents are maintained.

Clarification Clarified which design documents are reviewed by Quality Assurance.

Section IV.4.

Additions That procurement documents for spare or replacement parts are processed in the same manner as other procurement documents.

That the review and approval of procurement documents is reflected on the document or on a control form which is attached to the procurement document.

That the documents'are avaiaable for verification in Purchasing and plant records.

That Quality Control reviews procurement documents for spare and replacement parts for similarity to the original requirements, and adequacy of quality require-ments.

Section IV.5 Clarification Clarifies which documents are reviewed by Quality Assurance.

Section IV.6 Addition Made procurement document review requirements consis-tent with Section IV.4.

I That suppliers of materials, equipment, and services are required by procurement documents to provide control of manufacturing inspection and

-testing instructions.

Section IV.9 Additions Made procurement document. review requirements consi tent with Section IV.4.

Added Quality Control responsibilities for sur-N veillance and inspection of special process acti-vities.

Section IV.10 Additions That all documentation necessary to perform an inspection is available to the inspector prior to the performance of the activity.

That Quality Control inspection procedures include the identification of quality characteristics to be inspected and a description of the method of inspection to be used, the identification of the organization responsible for performing the inspection, the acceptance and regection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.

That inspection equipment is calibrated in accor-dance with Section IV.12 and that calibration status is verified prior to performing the inspection activity.

Section IV.11 Addition That test procedures include te t methods and test instrumentation definition.

A k>>~

l'

Section IV.12 Addition That shop standards calibration is traceable to national standards or, where national standards are not available, the basis of calibration is documented.

Section IV.14 Addition That. written procedures control the use of hold tags, test tags and labels and that the procedures require the recording of the name of the person placing and removing the tag.

Section IV.15 Addition That Quality Control issues monthly material deficiency report summaries, that these summaries are reviewed and analyzed by Quality Assurance, and that when unsatisfactory trend are noted, they are reported to management, using the corrective action report in accordance with Section IV.16.

Section XV.17 Additions That plant records include operating logs, drawings, specifications, calibration procedures and reports, nonconformance reports, and the results of inspec-tions, tests, audits and the monitoring of plant activities and material analyses.

That quality assurance records of special process activities are maintained by Engineering and that they include the qualification records of personnel, procedures, and equipment.

That inspection and test records contain a description of the type of test or" inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

V.

1 Ih 1

l 1

Section IV.18 Addition That Quality Assurance is responsible for conducting the audits listed 'in Table IV.18-1.

In July 1974, the United States Atomic Energy Commission requested information on the conformance of the R. E. Ginna Quality Assurance Program for Station Operating to the document entitled "Guidance of Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants", Revision 0 dated October 1973 (Orange Book Revision 0). The infor-mation requested is provided in Revision 1 to Supplement IV to the Technical Supplement accompanying Application for a Full-Term Operating Licen e. The following changes have been made to Supplement IV:

Section IV.1 Additions A description of the extent to which the quality assurance program conforms to the document entitled "Guidance on Quality Assurance Requirements During The Operations Phase of Nuclear Power Plants",

Revision 0 dated October 1973 (Grange Book Revi-sion 0).

On October 1, 1974, Rochester Gas and Electric Cor-poration revised its corporate structure. This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program. In addition, the RG&E commitment to the "Orange Book" in August has necessitated some'hifting of responsibilities. The changes RG&E has made are reflect'ed in Revision 2 to Supplement IV to the Technical Supplement accompanying Application for a Full Term Operating License.

The changes affect every section of the supplement except sections 12 & 14. Change pages are listed in Instructions 2 and each revised page is marked with revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is, noted by an arabic numeral next to each vertical line.

IC

'I F

let

~ i

Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement II and Supplement IV. Some editorial corrections have been made, and these are also marked.

Effective February 1, 1976, three additional organizations in the Rochester Gas and Electric Corporation have been assigned responsi-

'ilities f'r control of quality related activities. The changes are reflected in Revi ion 3 to Supplement IV to the Technical Supplement Accompanying Application for a Full Term Gperating License. Revision 3 also reflects some reclarification of terms and responsibilities which do not lesson our program commitments.

Reclarification changes are concentrated in sections IV-3, IV-4, IV-5, IV-6 and IV-15. Change pages are listed in Instructions-3 and each revised page. is marked with revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of, each page. The revision level is noted by an arabic numeral next to each vertical line.

Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii. Unrevised pages with a vertical solid black line in the margin reflect changes to the document between Supplement IX and Supplement IV.

During July, 1978, Rochester Gas and Electric Corporation revised its corporate structure. This organization change has not affected the functional interrelationships between the organizations responsible for implementing the quality assurance program.

Revi ion 4 also reflects some reclarification of terms and respon-sibilities which do not lessen Rochester Gas and Electric Cor-poration program commitments. Reclarification changes are concentrated in section IV-l, IV-2, IV-3, XV-7, XV-10 and IV-15.

Change pages are listed in Instructions-4 and each revised page

,is marked with revision level. Since single spacing of each page has reduced the number of pages,'ach page beginning with IV-1 is numbered'consecutively resulting in the Revision 4 notation at the bottom for that page containing different information than the corresponding page number of previous revisions.

Tables and figures which have been completely revised are shown by revision level at the bottom of the page and by reference in the index, page IV-vii.

vA

P ~ ~ C 0

J

In a February 8, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 4. Revision 5 provides the additional information and better clarification of the program consistent with that which was forwarded in Rochester Gas and Electric letter dated

.March 9, 1979. Change pages are listed in Instructions 5, and each revised page is marked with a revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line. Tables which have been re-vised are shown by revision level at the bottom of the page.

In a June 5, 1979 letter from Mr. Dennis L. Ziemann, the Nuclear Regulatory Commission requested additional information associated with their review of Revision 5. Revision 6 provides the additional information consistent with that which was forwarded in Rochester Gas and Electric letter dated June 25, 1979. Change pages are listed in Instruction 6, and each revised page is marked with a revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The re-vi ion level is noted by arabic numeral next to each vertical line.

Revi ion 7 was prepared to indicate recent organization changes in the corporate structure, Quality Assurance and General Maintenance.

Change pages are listed in Instructions 7', and each revised page is marked with a revision level. In addition, the latest revision is marked with a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line.

Nuclear Regulatory Commission Ceneric Letter 81-01 issued May 4, 1981 requested that the quality assurance program commit to USNRC Regulatory Guides 1.146 and regulatory positions C.5, 6, 7, 8 and 10 of Regulatory Guide 1.58 Revision 1. Revision 8 incorporates those commitments.

This revision also describes a change in responsiblity for pro-curement of nuclear fuel from the Director, Strategic and Fuel Planning to the Engineering Department and provides updated organizational charts for those previously provided. In addition, the latest revision is marked by a vertical line in the left hand margin of each page. The revision level is noted by an arabic numeral next to each vertical line.

Revision 9. incorporates recent changes in the corporate structure.

Prefix IV is also being deleted from each page to recognize that Technical Supplement Accompanying Application For A Full Term Operating License is being uperseded during 1984. In addition, commencing with this revision only the latest revision will be indicated by a vertical line in the left hand margin of each page.

vB

~ t fka

Revision 10 incorporates recent changes in the corporate structure

~ ~

and Engineering Organization depicted in Figures 2-1 and 2-5 respectively. A. clarification to Figure 2-3 has also been made.

Revision 11 incorporates recent changes in the Management, Engineering, and Ginna Organizations depicted in Figures 2-1, 2-3, and 2-5, respectively.

Revision 12 incorporates recent changes in the management Engineer-ing, Ginna and General Maintenance organizations depicted in Figures 2-1, 2-3, 2-4 and 2-5, respectively. Figure 2-5 now reflects the organization of the Engineering Division which .

includes the departments of General Maintenance and Engineering previously depicted in Figures 2-4 and 2-5 respectively. Figure 2-4 now illustrates the Electric Transmission and Distribution organization. Additionally, minor clarifications have been made to the sections associated with supplier selection (Section 7),

Quality Assurance Manager experience and responsibility (Section 2),

and clarification of those reports forwarded to Quality Assurance and management described in Sections 15 and 16. The Table 1 listing of the various implementing procedures has also been revised to reflect the two added departments and related shift in responsibilities.

Revision 12 December 1986 vC

I 4t

TABLE GF CONTENTS Section Title Pa<ac QUALITY ASSURANCE PROGRAM FOR STATIGN OPERATIGN Quality Assurance Program

2. Organization
3. Design Control
4. Procurement Document Control Instructions, Procedures and Drawings 13
6. Document Control 14
7. Control of Purchased Material, Equipment 16 and Services
8. Identification and Control of Materials, 20 Parts ana Components
9. Control of Special Processes 21
10. Inspection 22 Test Control 23
12. Control of Measuring and Test Equipment 24
13. Handling, Storage and Shipping 26
14. Inspection, Test and Operating Statu 27
15. Nonconforming Materials, Parts and 28 Components
16. Corrective Action 29
17. Quality As urance Records 30
18. Audits 31 Revision 12 December 1986 vi

LIST OF TABLES Table Number Title ~Pa e Quality Assurance Program 34 Procedures Sub-'ect Listing 4-1 Procurement Document Requirements 47 18-1 Audit List 48 LIST OF FIGURES Fi ure Number Title Pacae 2-1 Management Organization 51 2-2. Deleted 52 2-3 Cinna Station Organization 53

~-4 Electric Transmission and Distribution 54 Organization 2-5 Engineering Division Organization 55 Revision 12 December 1986

i1 JF

'4 J

UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram

.The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R. E. Ginna Nuclear Power Plant.

This program applies to all activities affecting the safety related functions of the structures, systems, and components that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, refueling, modification, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71.

The basic Rochester Gas and Electric Corporation quality assurance policy is established by the Chairman of the Board and Chief Executive Officer. This policy is implemented under the overall direction of the Executive Vice President by the Vice President, Electric Production through the Manager, Quality Assurance, the Superintendent, Nuclear Production, the Superintendent, Ginna Production, the Superintendent, Ginna Support and heads of other supporting departments.

The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program. The manual is prepared, reviewed, and maintained by Quality Assurance and approved by the Vice President, Electric Production.

The program is implemented through Quality Assurance, Ginna Station, Engineering, General Maintenance, Research and Science, Electric Transmission and Distribution and Purchasing procedures. These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Assurance. The procedures are contained in separate manuals maintained by the responsible organization.

All these procedures are reviewed for adequacy at least once every two years by the responsible organization. Table provides a listing of the subjects -and a short description l-l of the subject matter which is contained in the procedures.

Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.

Revision 12 December 1986

The Quality Assurance Program covers all existing Seismic Category I and Class lE structures, systems, and components, including their foundations and supports. Activities affect-ing the quality of these structures, systems, and components are controlled to an extent consistent with their importance to safety. A detailed listing of the structures, systems, and components covered by the Quality Assurance Program, based on Section 3.2. of the Updated Final Safety Analysis Report, is contained in the Quality Assurance Manual.

Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings. The listing of structures, systems, and components covered by the Quality Assurance Program and the system flow drawings are prepared and main-tained by Engineering and reviewed and concurred with by Quality Assurance.

Modifications or additions to existing structures, systems, and components are designated the same seismic classifica-tion as the existing system. New structures, systems, and components are designated a, seismic classification in accord-ance with the guidelines in USNRC Regulatory Guide l.29, Revision 3.

Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-mented and enforced. Personnel responsible for performing activities affecting quality are trained and indoctrinated in the requirements, purpose, scope, and implementation of quality related manuals and procedures. Refresher sessions are held periodically and retraining is required whenever a new procedure is issued or a major revision is made to an existing procedure. Training of personnel not in the quality assurance organization is the responsibility of each department performing an activity affecting quality. Quality Assurance assists in establishing training requirements and assures that personnel are trained by auditing training records.

In addition to training in quality assurance, each depart-ment conducts on-the-job training to the extent necessary to assure that personnel are qualified for their primary work assignments.

The Superintendent, Nuclear Production is responsible for the formal training, qualification, licensing, and requali-fication of operators, as necessary. Where necessary, personnel are trained in radiation protection, plant safety and security.

Revision 12 December 1986

i w

r, w'4 P

~

"I J

'Q f 0

IC

The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that meaningful and is effectively complying with corporate it is policy and 10CFR50, Appendix B. This review consists of audits or of a review equivalent to an audit performed by company personnel or outside. organizations.

The Quality Assurance Program is designed to meet, the require-ments of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regula-tory Guides and ANSI Standards:

a. NRC Regulatory Guide 1.8, Revision 1, "Personnel Selec-tion and Training."
b. NRC Regulatory Guide 1.28, Revision 2, "Quality Assur-ance Program Requirements (Design and Construction)."
c. AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment."
d. AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Require-ments During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book-Revision 0)
e. AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."
f. NRC Regulatory Guide 1.38, Revision 2, "Quality Assurance Requirements for Packaging, Shipping,-Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants."
g. NRC Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants."
h. - NRC Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel."
i. NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."

Revision 12 December 1986

I

'I 1

,p 4'

i

j. NRC Regulatory Guide 1.74, Revision 0, "Quality Assur-ance Terms and Definitions."
k. NRC Regulatory Guide 1.88, Revision 2, "Collections, Storage and Maintenance of Nuclear Power Plant Records.'"

.Note: When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate stroage locations in separate buildings which are physically isolated from each other.

1. NRC Regulatory Guide l.ll6, Installation, Revision O-R, "Quality Assurance Requirements for Inspection, and Testing of Mechanical Equipment and Systems."
m. NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants."
n. ANSI N45.2.12, D3, R4, 2/74 "Requirements for Auditing of Quality Assurance Programs for Nuclear Power Plants."
o. NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants."

The major organizations participating in the Quality Assur-ance Program are Purchasing, Engineering, Ginna Station, General Maintenance, Electric Transmission and Distribution, Research and Science, Quality Assurance and Quality Control Groups; the Plant Operations Review Committee; and the Nuclear Safety Audit and Review Board. Figure 2-1 is an organizational chart showing these organizations and their relationship to the corporate organization.

Positions responsible for the principal elements of the quality assurance program are:

Chairman of the Board Executive Vice President Vice President, Electric Production

- Chief Engineer Director, Engineering Services Manager, Quality Assurance Purchasing Agent Superintendent, Nuclear Production Superintendent, Ginna Production Superintendent, Ginna Support Services Ginna Nuclear Assurance Manager Revision 12 December 1986

0

\ ~

'1 f.

f

+1 P

E gl

Superintendent, Electric Substations Superintendent, General Maintenance Quality Services Coordinator Director Research and Science In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Ginna Station Superintendent and the Nuclear Safety Audit and Review Board advises the Vice President, Electric Production.

The qualifications of members and the responsibilities of these organizations are'escribed in Appendix A to Provisional Operating Licensed No. DPR-l8, Section 6.0, Technical Specifi-cations.

The Chairman of the Board of the Rochester Gas and Electric Corporation directed the establishment of the quality assur-ance program and issued the governing policy statement. He has established the Nuclear Safety Audit and Review Board to review and audit plant operations. The Chairman of the Nuclear Safety Audit and Review Board is responsible to the President on all activities of the Nuclear Safety Audit and Review Board.

The Executive Vice President has overall responsibility for and authority to, direct the Quality Assurance Program. It is through this effort that, he is to verify that responsibili-ties as assigned in the following paragraphs are being met.

The Vice President, Electric Production has corporate responsi-bility for operation of Ginna Station Heinisaccordance with responsible for applicable regulatory requirements.

establishing the policies and requirements necessary to assure safe and reliable operations of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The responsibility for proper implementation of the quality assurance program requirements at, Ginna Station has been assigned to the Superintendent, Nuclear Production, Super-intendent, Ginna Production, and the Superintendent, Ginna Support Services.

The Chief Engineer is responsible for supervising the Engineer-ing Division which is responsible for establishing policies and requirements for fuel management and the design and construction of major modifications in accordance with applicable design bases, regulatory requirements, codes and standards. He is also responsible for safety related main-tenance, repair, modifications and inspections performed at Revision 12 December 1986

the General Maintenance facility, for support of these activities at Ginna Station, and for"special processes and the inservice inspection program performed by the Research and Science Department. As requested by Ginna Station, he is also responsible for reviewing unique maintenance and repair procedures for major equipment and is responsible for assuring that the responsibilities of the Manager, Quality Assurance are implemented.

The Director, Engineering Services is responsible to the Chief Engineer for designing and constructing major modi-fications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management.

The Manager, Quality Assurance, is responsible for estab-lishing and executing the overall Quality Assurance Program.

He is responsible for assuring that the program satisfies the requirements of 10CFR50, Appendix B, and for maintaining the total program up to date. He is responsible for assuring that all the planned and systematic actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed. He provides management with objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity. He has the authority and organizational freedom to assure all necessary quality affecting activities are performed. He is responsible for maintaining a quality assurance staff, Figure 2-1, for the conduct of staff training, for directing its activities and for establishing and implementing a comprehensive audit program.

The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which two years is in quality assurance and three years in the design or operation of nuclear power plants.

The Manager, Quality Assurance and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation. This includes writing Quality Assurance'policies and reviewing the procedures of the organizations participating in the Quality Assurance program. They are also responsible for auditing all aspects of the Quality Assurance Program and for= ensuring significant conditions adverse to quality are corrected. They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement, and installation documents. They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified, and they are responsible for conducting audits and surveillances Revision 12 December 1986

<<'f f

'I

'A

<<L A

tg

at these supplier's facilities. In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule, audit status reports, corrective action report summaries and in the preparation and mainten-ance of the Quality Assurance'Procedures Manual.

The Director, Research and Science is responsible for super-vising and directing a staff, Figure 2-5 which is responsible for the development and qualification of procedures utilized for special processes. He is responsible for providing functional guidance and direction for those methods. He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and handling equipment and for the testing and evaluation of Ginna Station materials.

The Manager, Divisional Services is responsible for providing records, document control, schedule and administrative support services to the Engineering Division.

The Purchasing Agent is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements. He maintains a listing. of qualified suppliers determined through an evaluation made by Purchasing, Engineering, Quality Assurance and the other involved depart-ments as appropriate.

Superintendent, Nuclear Production is responsible to the Vice President Electric Production for directing Ginna nuclear production activities and those support activities associated with Nuclear Assurance, Training, and Emergency Planning.

The Superintendent, Ginna Production is responsible to the Superintendent, Nuclear Production for the overall on-site safe operation of Ginna Station. He is responsible for the performance of the Ginna Station operation, maintenance and repair quality affecting activities in accordance with the requirements of the quality assurance program. He is respons-ible for providing qualified personnel to perform these activities in accordance with approved drawings, specifica-tions, and procedures. He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Superintendent, Ginna Support Services reports to the Superintendent, Nuclear Production and is responsible for the performance of modification, refueling, and test, activi-ties in accordance with the requirements of the quality assurance program. He is also responsible for providing qualified personnel to perform the activities in accordance Revision 12 December 1986

~P Aa

~tl n

with drawings, specifications, and procedures. He acts in behalf of the Superintendent, Ginna Production during his absence.

The Ginna Nuclear Assurance Manager reports to the Super-intendent, Nuclear Production and is responsible for assuring that station activities affecting quality are precribed and carried out in accordance with approved drawings, specifica-tions, and procedures. He is a member of the Plant Operations Review Committee and delegates the day to day quality assuring planning and work monitoring responsibilities to the station Quality Control Engineers and QC Inspectors. Quality Control Engineers are responsible for the review of procurement documents initiated at Ginna and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. The Quality Control Inspection Supervisor is responsible for the coordination of inspection activities and the assurance that inspection requirements are included in approved procedures. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconconformance reports. Quality Control personnel process corrective action reports and assure that corrective action is taken. They also perform routine surveillance of other groups involved in quality affecting activities and provide reports to Ginna super-vision and management. with objective information concerning the quality of these activities.

In addition to the Ginna Station Quality .Control staff and the Nuclear Assurance Manager, the Ginna Station Super-intendents are assisted by other designated staff members, Figure 2-3, in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, storage of material and equipment, operating and test status control, calibration and control of measuring and test equipment not used by Quality Control, maintenance of material handling equipment, operator training, and control of all activities involving operation, maintenance, repair, refueling and modification.

The Superintendent, General Maintenance, is responsible for supervising and directing a staff, Figure 2-5, which super-vises the performance and verification of safety related maintenance, repair and modification activities performed at the General Maintenance facility. He is also responsible for providing trained and qualified welders, riggers and crane operators for the support of Ginna activities.

The Quality Services Coordinator is responsible to the Superintendent, General Maintenance, for performing or directing the performance of verification activities for which General Maintenance Quality Control is responsible.

Revision 12 December 1986

4 4

h 7,

C t

In this capacity he is responsible for assuring that activi-ties, affecting quality, are carried out in accordance with approved drawings, specifications and procedures. He is

'lso responsible for the preparation of Quality Maintenance, Quality Research and Science and Quality Engineering procedures and for the training of the corresponding personnel in the implementation. of these procedures. He also coordinates receipt inspection of incoming materials, parts and components, performs routine surveillance of General Maintenance activities.

, He also coordinates the processing of nonconformance reports, corrective action reports.and the replies to audit, reports for the three departments.

The Superintendent. Electric Substations Department is respons-ible for directing a staff, Figure 2-4 which is responsible for providing relay engineering, maintenance and testing services. He is also responsible for design, modification and construction activities at Station 13A and for supporting the Engineering department's design and construction activi-ties at Ginna. He is also responsible for coordinating and for providing support documentation for any design modifica-

. tions initiated within the Electric Transmission and Distribu-tion Division.

Desi Control Design activities are performed by Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.

Engineering is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or components.

Augmenting this effort is the design and technical support provided by the Electric Substations department for those activities for which Electric Transmission and Distribution is responsible. In this regard they support Engineering for design of safety related modifications.

Ginna Station is responsible for the design and control of design activities for Minor modifications of structures, systems, or components. Ginna Station is also responsible for classifying station originated modifications as either Major or Minor. Engineering reviews and concurs with modi-fications being classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design and limited to the extent that the change does not impact existing performance requirements, (2)-additions within Seismic Category I buildings which perform no safety functions and which either interface with Seismic Category I Revision 12 December 1986

h a

ir 1"

or Class lE items or whose failure could reduce the function-ing of any safety related component required for safe shutdown of the plant to an unacceptable level, (3) changes to a safety related system determined not to be major (i.e.,

vents, drains, alarms, indicating lights, etc.).

Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval, distribution, control, and revision requirements; and corrective action. Design con-siderations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analysis; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements. Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests as appropriate to assure the adequacy of the design.

The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Engineering department design engineers or consulting engineers as re-quested. For Minor modification station design, this may be done by Ginna Station and or Engineering department. design engineers as appropriate.

Spar'e or replacement parts must at least meet the original equipment technical and quality requirements. For plant modifications, standard "off-the-shelf" commercial or pre-viously approved materials, parts, and equipment are selected and reviewed for suitability of application by the design engineer.

Design changes are normally reviewed and approved in accord-ance with the same procedures as the original design.

Supplemental procedures are established for the review and approval of field changes. In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed the original design, review and approval. Where this is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent back-ground information and are competent in the specific design area.

Design verification and field change systems are methods utilized to detect, document and correct. design process errors and deficiencies. In addition, the corrective action system, described in Section 16, is utilized to control and Revision 12 December 1986

yk

  • 4N 4J'
  • f4 V4

document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adverse to quality.

Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks, and reviews. Design control procedures are reviewed to assure that an independent verification is performed.

Engineering and Ginna Station are-responsible for establishing measures for the proper control of design documents and re-visions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information. The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution 11sts.

Design documents are collected, stored, and maintained in accordance with Section 6 and 17, as appropriate. Design documents include design criteria, analyses, specifications, drawings, design review records, and changes thereto.

Quality Assurance and Station Quality Control, through pre-paration assistance and/or review assure the proper inclusion of quality standards in the design of major and minor modi-fications, respectively. Quality Assurance is also responsible for assuring that adequate inspection requirements are included in specifications. The Nanager, Quality Assurance reviews and approves any deviations from quality standards when they occur.

Plant modifications are controlled by means of applicable Ginna Station, Engineering, Electric Transmission and Distribution, and Quality Assurance procedures. These

. procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures. Plant modifications are reviewed by the Plant Operations Review Committee and Nuclear Safety Audit and Review Board as required by Section 6.0, Technical Specifica-tions.

Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.

Revision 12 December 1986

I sb A

1'

Such documents may be prepared by Rochester Gas and Electric or by a, contractor and include purchase requisitions, purchase orders, servi'ce agreements, contracts, specifications, and drawings.

Procurement of materials, parts, components, and services is initiated by department staff personnel. Procurement proce-dures require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-1.

Procurement documents, --including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Control and approved by the department super-intendent or his designated representative'. Procurement documents initiated in Engineering, Research and Science, Electric Transmission and Distribution, General Maintenance and Quality Assurance are reviewed by Quality Assurance and approved by designated departmental supervision.

Evidence of review and approval of procurement documents is recorded on the documents or on the attached control form.

The attached control form identifies to Purchasing a procure-ment method which will ensure that the selected supplier is capable of providing the item or service in *accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corres-ponding procurement method are described in Section 7 After purchase requistions, service agreements, contracts, specifications, and drawings have received the required re-views and approvals, a purchase order is issued by Purchasing to the selected supplier and controlled as described in Section 7. These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.

Under no circumstances are purchasing requirements altered (except'or quantity or pricing) during order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above. Changes or revisions,to procurement documents are subject to the same review and approval requirements as the original documents.

Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements. Quality Assurance/ Quality Control review of the above includes checks to verify proper inclusion of quality standard, quality assurance program requirements, method or procurement and the applicable Revision 12 December 1986

pW F

I I

<<J

acceptance criteria. Quality Control also reviews procure-ment documents for spare or replacement parts for adequacy of quality requirements and to determine similarity, compa-tibility, and the inclusion of the quality requirements and acceptance criteria of the original design.

Instructions, Procedures, and Drawin s Each Rochester Gas and Electric company organization is responsible for developing, reviewing, approving, and imple-menting procedures as required to implement the Quality Assurance Program. These 'procedures cover activities such as document control, training of personnel, and responsi-bilities and duties of personnel. Quality 1-1 Assurance reviews and concurs with these procedures. Table provides a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.

Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.

Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, modification, testing and inspection. This includes instruc-tions and procedures listed in USAEC Regulatory Guide 1.33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, off normal, or alarm conditions, response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical control; and fuel handling and refueling.

Ginna Station is responsible for the preparation and imple-mentation of quality control inspection procedures utilized for detailed station inspection activities. Ginna Station is responsible for appropriate changes to such documents upon receipt of regulatory directives, instructions from Rochester Gas and Electric management, or the completion of plant modifications. Ginna Station is also responsible for the preparation and issuance of those minor modification design documents not provided by Engineering or the equipment supplier.

General Maintenance is responsible for providing and for implementing procedures associated with shop work required to support Ginna Station maintenance, repair and modifica-tion activities. General Maintenance is also responsible for the preparation and for the implementation of quality control inspection procedures utilized for detailed inspec-tion activities at their facilities.

Revision 12 December 1986

J

~e Nil M4, t'

I A%

I 4 w I

Electric Transmission and Distribution is responsible for the preparation and -implementation of relay inspection and testing procedures as required to direct detailed inspec-tions and testing activities for which they are responsible.

Electric Transmission, and Distribution also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.

Engineering is responsible for providing approved specifi-cations, and drawings associated with major modifications and when minor modifications necessitate drawings or speci-fications. These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings. Engineering has established procedures for revising drawings and specifica-tions. These procedures cover updating of as-built drawings after plant modifications and the revision, approval, dis-tribution, and control of all drawings and specifications.

Research and Science is responsible for providing and for implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment 'as well as materials testing and inservice inspection.

Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.

Indoctrination and training of personnel is provided by the responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents. In addition, surveillance by Quality Control personnel, as described in Section 10 and audits by Quality Assurance as described in Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.

Document Control Procedures are established to control the issuance of pro-cedures, instructions, drawings,,and specifications. Standard document control requirements are contained in the Quality Assurance Manual. The Superintendent, Ginna Production is responsible for the control of all documents issued at Ginna Station. Electric Transmission and Distribution is responsible for the control of documents issued by their respective organizations. Engineering con'trois all documents issued by.

Revision 12 December 1986

iYi ~

iil Cq ti k

Engineering, General Maintenance, Research and Science, Quality Assurance and Purchasing. Each organization control-ling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.

The Quality Assurance Manual designates responsibilities and defines requirements for the preparation, review and approval of documents. Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequte, and include appropriate qualitative and quanti-tative requirements. Departmental Quality Control repre-sentatives review departmental maintenance, repair, refueling and modification procedures, prior to use, to assure quality assurance requirements are included. The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible tech-nical person associated with that activity. Ginna Station, General Maintenance, Engineering, Research and Science, Purchasing, and Electric Transmission and Distribution quality assurance implementing procedures require the review and concurrence of Quality Assurance and the approval of the appropriate department supervisor.

Quality Assurance procedures are approved by the Manager, Quality Assurance.

The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. It specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit, controlled documents using approved forms internally and externally.

Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as quality assurance, engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and administrative), specifications and drawings. Suppliers of materials, equipment, and services are required in procure-ment documents to provide for control of documents, including manufacturing, inspection and testing instructions.

Revision 12 December 1986

,~

f S

F

'h

The Quality Assurance Manual further requires that. each organization provide in its procedures for measures: to assure that documents are available when required; to pro-perly review and approve documents such as procedures, instructions, specifications, and drawings; to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.

Quality Assurance and the Quality Control organizations, are responsible for review and concurrence of procurement documents in their designated departments and, therefore, procurement document control requirements.

Quality Assurance and the Quality Control organizations are further responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.

Control of Purchased Material, E i ment, and Services Procurement documents, supplier selection, planning for item or service acceptance control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.

All procurement is conducted in accordance with procurement documents as stated in Section 4. All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.

Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the control of the supplier performance. Source inspection (surveillance), certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items. In lieu of these methods, acceptance of services is based on either or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to the procure-ment document requirements (i.e. certifications, stress reports etc.). The extent of the acceptance methods and as-sociated verification activities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.

Revision 12 December 1986

i C>,

~ .*

"4 ~

W

Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.

Results of the planning are incorporated in the procurement documents and or on the attached procurement control form as described in Section 4.

Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents. The evaluation which is accomplished during the procurement planning, determines the necessity for the supplier selection to be from the approved suppliers list maintained by Purchasing. Purchasing utilizes the approved suppliers list for the selection source of those suppliers required to have a satisfactory quality assurance program. The evaluation guidelines for source selection, considers the item complexity,

'method(s) of acceptance and for a replacement item, if source is to be restricted to the original supplier. For the engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is from the approved suppliers list or one who is in the process of being added to the list, after having its capability evaluated to purchaser satisfaction. Items or services which meet industry standards and are typically utilized in applications other than nuclear may be purchased from suppliers not listed on the approved suppliers list provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as source surveillance, pre- or post-installation tests, necessary,'ith receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed on the approved suppliers list provided that verification of nuclear quality can be accomplished by methods such as source surveillance, pre- or post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance. Depart-mental procedures establish guidelines for source selection evaluations and for documenting the results on the procurement control form through indication of the corresponding procurement method. The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.

Revision 12 December 1986

~

'4 ly'

Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other depa'rtments, as appropriate.

For Engineered items, Engineering is responsible for evalu-ating the overall design or manufacturing capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the procurement documents. As part of this review, the supplier's design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabili-ties, and experience are reviewed.

Quality Assurance is responsible for evaluating the supplier's overall quality assurance organization and program in accor-dance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas and Electric requirements.

The review includes consideration of: company organization, quality assurance personnel qualifications, review and

.control of design documents, manufacturing procedures, quality .assurance procedures, calibration practices, accept-ance criteria, required quality assurance records and their retention, and quality assurance requirements and controls imposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assur-ance requirements.

Ginn'a Station, Research and Science, Quality Assurance and Electric Transmission and Distribution evaluate the suppliers of inspection, test, and calibration services which they intend to use.

The departments responsible for performing supplier evalu-ations shall document their results in reports which discuss areas investigated, findings, and conclusions. As applicable, concurrence of Purchasing, Engineering, Quality Assurance, Ginna Station, Research and Science; General Maintenance, and Electric Transmission and Distribution is required to place a supplier on the qualified suppliers'ist. One organization can remove a supplier from the list without

. concurrence of the others.

Measures are established by Engineering and Quality Assurance to control supplier performance for engineered items. These measures typically include the processing of change infor-mation, surveillance of supplier activities and the control of documents -exchanged with the supplier. In addition, each department procuring off-the-shelf items or services esta-blishes similar measures for the control of supplier perfor-mance. With the exception of processing change information, Revision 12 December 1986

1 4-x il

. the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.

Quality Assurance is resp'onsible for determining and document-ing the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection, testing, and shipping, and for providing the required surveillance. The objective of supplier surveil-lance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements.

For complex engineered items, Quality Assurance and Engi-neering are responsible for joint development of surveillance plans in advance of surveillance trips to identify -areas to be reviewed.

The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance represen-tative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.

Ginna Station Quality Control is responsible for surveillance of site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.

.The verification methods for the acceptance of items and services are specified on. the attached procurement control form during procurement planning and the purchase requisition preparation.

Department superintendents are responsible for receiving and storing items pending their acceptance. Upon receipt, the department stockkeeper logs the item, places a "hold" tag on the item, and notifies Quality Control that the item has arrived.

Quality Control is responsible for receipt inspection upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection in-cludes the use of written procedures or checklists to verify that the items and services conform to the procurement docu-ments (if this has noi been performed by source inspections) and that. documentary evidence of conformance is available at the plant prior to installation or use. Documentary evidence Revision 12 December 1986

I C

l~

1

+a

sufficient to identify the codes, standards or specifications met by the purchased material, equipment,, and services is retained. In the event a final source inspection for the acceptance is conducted prior to receipt by RG&E, Quality Control performs an inspection for shipping damage or lost parts and a document check to assure that the required docu-mentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.

If the labels item and documentation are adequate, Quality Control the item as "Accepted", files the documentation and receipt inspection results, and releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Control initiates a nonconformance report which is controlled in accordance with Section 15.

All items issued must bear an acceptance tag and have docu-mentation to support the acceptability of the item. In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.

Identification and Control of Materials, Parts, and Com onents The identification and control of materials, parts, and components is accomplished in accordance with written require-ments and applies to material, parts, or components in any stage of fabrication, storage, or installation. Identifi-cation and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:

traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test reports; specification of the degree of identification to preclude a degradation of the item's functional capability or quality; and the proper identification of materials, parts, and components prior to release for manufacturing, shipping, construction, and installation.

Engineering and Quality Assurance are responsible for assuring that drawings and specifications contain appropriate require-ments for the identification and control of materials, parts, or components, as appropriate. Suppliers are required to assure that, all required documentation for an item is properly identified and related to the item. Each item is required to be physically identified, either by marking on the item or by tags. Physical identification by purchase Revision 12 December 1986

  • s 4

f 4o 4

h

order number is used to the maximum extent possible for relating an item at any time to applicable documentation.

Identification is either on the item or records traceable to the. item. Where physical identification is impractical, physical separation, procedural control, or other appro-priate means are employed.

The Ginna Station Superintendents are responsible for main-taining identification and control of materials, parts, or components received, stored, installed, and used at the plant. Procedures covering the identification and control of materials, parts, and components at the plant are approved by a Ginna Station Superintendent. The responsible supervision of other departments which receive material which is to be stored away from the plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, -parts, or components, stored or used in their area of responsibility.

In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.

Control of S ecial Processes Written procedures are established to control special pro-cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications. Qualification of personnel and procedures complies with the requirements of applicable codes and standards. When special process qualifi-cation requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the special process qualification requirements.

Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.

Quality Assurance and Quality Control personnel are respon-sible for reviewing procurement documents to ensure that, requirements for control of special processes are included.

Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved by Materials Engineering.

Special process procedures submitted by suppliers and con-tractors are reviewed and concurred with by Materials Engi-neering.

Revision 12 December 1986

~ ~

La 6

'?

'v l,y n

The Ginna Station Maintenance Manager and Manager Nuclear Assurance are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable codes, specifications, and standards. Within the Research and Science Department, the Manager, Materials Engineering and Inspection is responsible for the qualifica-tion of NDE personnel and procedures. The Manager, Materials Engineering is responsible for the qualification of welding procedures and the training and qualification of welders.

Ginna Station maint'ains records for personnel and procedures to demonstrate that required qualifications have been obtained and are kept current.

Quality Assurance and Quality'ontrol perform surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure com-pliance with procedures.

Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by

'drawings, instructions, r'equirements documents, specifi'-

cations, codes, standards, or regulatory requirements. For clarification and to distinguish from preventative mainte-nance inspections the following controls are associated with the quality assurance function inspections and referred to as verification inspections. Instructions for conducting detailed verification inspections are contained in inspection

-procedures. These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection.

Inspection requirements and hold points are utilized to verify conformance of activities to the documented instruc-tions, specifications, and drawings for accomplishing the activity. Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for performing the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity. Verification inspections are performed by -qualified inspection personnel who are independent of the personnel, performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent. inspectors. Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.

Revision 12 December 1986

V A ~

I

Quality Control personnel are responsible for performing verification inspections, as required, during plant operation, maintenance, repair, in-service inspection, refueling, modi-fication, and testing when the work is performed by Rochester Gas and Electric personnel. When the work is performed by outside contractors, Quality Control is responsible for sur-veillance of the subcontractor's inspection activities. All inspection equipment is calibrated and controlled in accordance with Section 12. Calibration status is verified by inspection personnel prior to performing an inspection operation.

In the event an inspection of processed material or products is impossible or impractical, indirect control by monitoring processing methods, equipment, and personnel is provided.

Both inspection and process monitoring are required when control is inadequate without both.

Quality Assurance is responsible for the adequate inclusion of inspection requirements in specifications.

The Ginna Manager Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included'in maintenance, repair, refueling, modification and testing procedures. He is also responsible for the assignment. of qualified inspection personnel required for, inspection of quality affecting activities and for coordinating the performance of and conducting the surveil-lance of inservice inspection.

The Quality Services Coordinator is responsible for assuring that adequate inspection requirements are included in procedures, instructions and/or checklists controlling maintenance, modification and repair activities and related fabrication processes at the General Maintenance facility.

With the exception of that which pertains to Pump and Valve Testing, the Director Research and Science is responsible for establishing the requirements for the Inservice Inspection Program. Quality Assurance is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant system and other safety, related systems is contained in Section 4.2, Technical Specifications.

Test Control Whenever testing is required to demonstrate that a material, part, component, or system will perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications, Revision 12 December 1986

h, t

t' f/A.A t

J-4 4

LW gL

codes, standards, and regulatory requirements. The test program requires the identification, control, and documen-tation of all tests, and the preparation of written proce-dures required for satisfactory accomplishment of the testing.

Written test, procedures and checklists include: necessary test equipment and calibration requirements; material require-ments; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed perfor-mance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instruc-tions for disposition of deviations; data collection require-ments; and test result approval.

The Superintendent, Ginna Support Services is responsible for the station test; program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.

Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Control, and approved by the Ginna Station Superintendent. The Ginna Station Superintendent is responsible for the performance of the required tests in a correct and timely manner utilizing written and approved procedures. When contractors are employed for tests, the contractor is required to perform testing in accordance with his quality assurance program requirements. All test results are required to be docu-mented, reviewed, and approved by those responsible for performing the test.

When requested by Ginna Station, Electric Transmission and Distribution performs test activities to determine the cause of protective relay malfunctions. These test activities are performed in accordance with approved procedures by qualified personnel.

Engineering and Quality Assurance are responsible for assuring that required tests for major modifications are included in specifications. Engineering and Electric Transmission and Distribution assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements.

Reviews of minor modification design by Station Quality Control verifies adequate inclusion of test requirements Control of Measurin and Test E i ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of Revision 12 December 1986

4 IM 1

~k

calibration frequencies, and maintenance and control require-ments of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures. Calibration procedures include step-by-.step methods for calibration and requirements for instrument accuracy. Calibration frequency is based on required accuracy, degree of usage, stability characteristic manufacturer's recommendations, experience, and other condi-tions affecting measurement capability.

Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next calibration date on 'the equipment; a system providing trace-ability of shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete, status of all items under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability under normal use conditions. Zn the event a measuring instrument (i.e. shop or field standard) -is found out of calibration, an investigation is conducted to determine the validity of previous measurements.

The Ginna Station Superintendents are resonsible for the procedures and program required to assure control and cali-bration of measuring and test equipment at Ginna Station in accordance with the above requirements. Instruments specified in Section 4.1, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are calibrated and controlled in accordance with station procedures. Measuring, test or inspection equipment used by Quality Control is included in the program.

The Director, Research and Science and Superintendent, Electric Meter'nd Laboratory, are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective departments.

F Revision 12 December 1986

e t

t 4l

<<Y t.

4(

il

'4 Ql F'""

lY

Handlin , Stora e, and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station. General Maintenance, Electric Transmission and Distribution, and Research and Science are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located in their work areas. In addition, within the Research and Science Department, the Manager, Materials Engineering and Inspection is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and handling equipment. Under normal circumstances, manufacturer's specific written instructions and recommen-dations and purchase specification requirements are invoked for cleanliness, preservation, special handling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific manufacturer requirements, the department superintendent, may invoke additional require-ments in accordance with department procedures.

The Chief Engineer is responsible for specifying in procure-ment, documents and in engineering specifications that, written procedures be used, as appropriate, for the handling, shipping, storage, cleaning, and preservation of materials and equipment procured for modifications. These procedures are prepared by contractors, by the station staff, or. by staff members of General Maintenance or Electric Transmission and Distribution as appropriate. Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.

In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages of manufacturing and installation prior to operational acceptance.

Quality Assurance is responsible for review of Engineering specifications to assure that proper handling, storing, and shipping requirements have been specified. Quality Control is responsible for surveillance of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.

Revision 12 December 1986

C P

Ins ection, Test, and 0 eratin Status Equipment or systems not ready for normal service are clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner. The identification is sufficient. to positively indicate the status of the particular equipment or system being isolated.

The Superintendent, Ginna Production is responsible for indicating the status of operating equipment or systems to be removed from service for maintenance, repair, or modifi-cation in accordance with the approved Electric System Operating Rules. The Superintendent, Ginna Production designates personnel who have station holding authority.

Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.

System status is indicated through the use of hold tags, block tags and corresponding control logs.

Equipment or system inspection and test status are indicated by use of test tags, labels, or work inspection and test status sheets. Written procedures control the use of hold tags, test tags, and labels. The procedures require the recording of the name of the person placing and removing the tag.

Systems, components, and equipment which are found to be unacceptable during or after testing are clearly identified.

Fuel handling operations involving fuel assemblies or other radioactive sources are identified and controlled by the use of tags, stamps, or other suitable means.

Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets and checklists to indicate status of the work, inspections and tests and corresponding acceptance or rejection for a particular component, system, or structure. These job control forms are prepared jointly by the job supervisor and Quality Control and maintained at a designated control location to indicate the status and the completion of required .

inspections and tests.

Quality Control monitors the status change activities for their compliance to approved procedures and assures that inspection results are properly logged. Quality Control also establishes the procedures for implementing the inspec-tion status sheets utilized during inservice inspection.

Revision 12-December 1986

P t

' '

ak,p I '1 kg tW

~

~-

Nonconformin Materials, Parts, and Com onents Procedures are established for the control, evaluation and disposition of deficient, material, parts, and components.

Materials, parts, or components which do not conform to the drawing or specification requirements are identified with a hold tag and reported on a nonconformance report. Quality Control is responsible for issuing nonconformance reports, initiating repair or rework, and inspecting and approving repaired or reworked items. Prior to installation or use, nonconforming items generally remain in a Quality Control receiving inspection area until approved disposition has been received. Nonconforming items which are released for installation to meet critical fabrication schedules are controlled by Quality Control to prevent inadvertant use prior to clearance of the nonconformance. After installa-tion or use, nonconforming items are identified and con-trolled until approved disposition has been received.

Nonconformances identified at a supplier's facility and reported to RGEE, which have supplier recommended diposi-tions of use-as-is, or repair, are normally processed by the department. originating the procurement. Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended dispo-sition. This also applies to nonconformances discovered after receipt, inspection, during handling or after -instal-lation or use.

Items are repaired and reworked only in accordance with approved procedures and current drawings. Quality Control assures that approved procedures and/or drawings are avail-able for use prior to the repair or rework and reinspects

-all repaired or reworked items. The repair or rework must, be verified as acceptable by an inspection of the affected item which is at least equal to the original inspection method.

Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance. All such items are approved prior to use by the cognizant organization having responsi-bility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Vice President, Electric Production.

Quality Control issues monthly nonconformance status reports.

Copies of nonconformance reports are forwarded to Quality Assurance for review, tabulation and processing of periodic trend reports to management. Adverse trends form a basis for supplier re-evaluation or for other corrective action per Section 16.

Revision 12 December 1986

Corrective Action Quality Assurance establishes the requirements for identi-fication, review and correction of significant conditions adverse to quality. Significant conditions adverse to quality such as failures, malfunctions, deficiencies, de-viations, defective material and equipment, and nonconfor-mances are reported on a corrective action report. Sign-ificant conditions adverse to quality include conditions affecting safety, conditions which could result in plant shutdown, high maintenance items, and operating procedure deficiencies. The corrective action report identifies the condition, the cause of the condition, and the corrective action taken.

Cor'rective action reports may be initiated by Quality Assur-ance, Engineering, Ginna Station, General Maintenance, Research and Science, Electric Transmission and Distribution or Purchasing staff personnel. Corrective action reports initiated at Ginna Station and General Maintenance are submitted to Quality Control for review and subsequent processing. Corrective action reports initiated by depart-ments other than at Ginna Station or General Maintenance are reviewed and processed by Quality Assurance.

When a significant condition adverse to quality at Ginna Station is identified, Quality Control evaluates the affect of continuing the activity. If continuing the activity would cover up or preclude identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken. Ginna Station Quality Control Supervision has authority to stop work on maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies, at Ginna Station. Ginna Station Quality Control may recommend stop work action to the Superintendent, Ginna Production on operating deficiencies.

The Plant Operations Review Committee reviews all corrective action reports initiated at Ginna Station and recommends interim corrective action if the action does not represent a change in configuration of the deficient item. The Committee recommends permanent corrective action for all conditions adverse to quality which involve operating procedures.

Significant conditions adverse to quality identfied in General Maintenance are processed by the Quality Services Coordinator. The Quality Services Coordinator has the authority to stop or limit work activities within General Maintenance.

Revision 12 December 1986

Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a design change are reviewed by Ginna Station or Engineering as applicable. The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.

Quality Assurance reviews all corrective action reports to assure that, the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.

Corrective action summary reports are submitted to the Executive Vice President and to the Vice President, Electric Production to keep them aware of significant conditions adverse to quality, related causes and corrective action being taken.

ualit Assurance Records Quality Assurance is resonsible for establishing the basic requirements for quality assurance record retention and maintenance. Ginna Station is responsible for the retention and maintenance of plant records. Engineering is responsible for the retention and maintenance of Engineering records.

Quality Assurance, Purchasing, Research and Science, General Maintenance and Electric Transmission and Distribution departments are responsible for assuring the maintenance and retention of records which they originate. This may be accomplished either by retaining the records in their depart-ment or by forwarding them to Ginna Station or Engineering, as appropriate. Each organization retaining records is responsible for preparation, review, approval, and implementa- .

tion of specific quality assurance record procedures for their areas of responsibility in accordance with these requirements. The records which fall within quality assurance record requirements include those records required by Section 6.10 of the Technical Specifications and the Quality Assurance Program. All records associated with the operation, maintenance, repair, inservice inspection, refueling, modifica-tion, inspection and testing of structures, systems, and components covered by the quality assurance program are included.

Ginna Station records include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures and reports; and nonconforming and corrective action reports. Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained by Engineering or Ginna Station as appropriate.

Revision 12 December 1986

I r~'k

~S V;-

P~

T 4Y"1 4.

tE, 1

1~

t Z

I

!

Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

The requirements and responsibilities for record accessibility and transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements and responsi-bilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention of quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available to authorized personnel.

Removal from record storage is documented on sign-out cards and accountability is maintained by the responsible record control activity.

Records are either stored in record storage facilities which are designed to prevent destruction of records through fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.

Record keeping procedures provide for receiving, classifying, indexing, labeling, and prepar'ing records for storage. The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.

Ginna Station is responsible for maintaining plant operating records as required in Section 6.l0, Technical Specifications.

Engineering is responsible for maintaining design records, such as specifications, drawings, design review reports, and design control documentation; quality assurance records, such as audit reports and supplier surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.

Audits Compliance with all aspects of the quality assurance program and the effectiveness of the program is determined by audits of all organizations performing quality affecting activities.

Quality Assurance is responsible for conducting audits of each organization involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status and safety importance of activities being performed.

Revision 12 December 1986

I<

4N 4

4 te ~*

e

Audits of Ginna Station, Engineering, Research and Science, General Maintenance, Electric Transmission and Distribution, and .Purchasing organizations are performed annually.

Table 18-1 is a list of the activities to be audited in each of the organizations. Audit frequencies are based on the level of activity in each area. Audit schedules are estab-lished to assure that each of the activities are audited at the frequency specified in Section 6 Technical Specifications which includes annually for those activities required to meet the criteria of Appendix B, lOCPR.50. Additional audits are conducted as required by special conditions or circumstances.

Each audit requires the development of an audit plan to provide information about the audit, such as the functional areas to be audited, the names and assignments of those who will perform the audit, the scheduling arrangements, and the method of reporting findings and recommendations. The audits are performed in accordance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.

Audit results are documented and reported to the supervisor and division head having responsibility in the area audited, the Executive Vice President, Vice President, Electric Production, and the Nuclear Safety Audit. and Review Board.

Within a specified period of time, the person having super-visory responsibility in the area audited is required to review the audit results, take necessary action to correct the deficiencies identified by the audit, and document and report the corrective action.

Quality Assurance is responsible for developing audit plans and audit, checklists, designating and training audit personnel, and conducting audits.

Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.

Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procure-ment, as required, to evaluate their quality assurance program for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents. During the project, additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-mented in accordance with procurement documents.

Revision 12 December 1986

Quality Assurance performs regular analyses of audit results to evaluate quality trends. Results of these analyses are provided to management for their regular review.

Revision 12 December 1986'33-

Table l-l Quality Assurance Program Procedures Subject Listing Appendix B ualit Assurance Procedures Criteria Indoctrination of Quality Assurance,and Supervisory Personnel Training of Quality Assurance Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance Procedures Quality Assurance Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's Design Documents Requisitioning Quality Assurance Services IV Quality Assurance Review of Rochester Gas and IV Electric Procurement, Documents Preparation, Review and Approval of Rochester Gas IV and Electric Q.A. Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation, Review and Approval of Quality Assurance Procedures Review of .Departmental Procedures VI /

Preparation, Review and Approval of Procedure VI Deviation Requests by Quality Assurance Evaluation of Suppliers by Quality Assurance VII Supplier Surveillance VII Revision 12 December 1986

Table 1-1 ( cont ' )

Appendix B ualit Assurance Procedures Criteria Control of Supplier Performance VII Quality Assurance Evaluation of Bids VII Inservice Pump. and Valve Testing Program XI Quality Assurance Review of Nonconformance Reports XV Preparation, Review and Processing of Corrective XVI Action Reports by Quality Assurance Qualification of Auditing Personnel XVIII Audit Scheduling and Planning XVIII Performance of Quality Assurance Audits XVI II Reporting and Follow-Up of Audit Findings XVIII Conduct of Quality Assurance During and in Follow-Up oi USNRC and Management Audits XVI II Revision 12 December 1986

1 4"

E, I'y

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Ginna Quality Assurance Program Implementation Training of Ginna Personnel Ginna Administrative and Engineering Staff Responsibilities Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Control of Station Modification Station Modification Installation Acceptance and Completion Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased IV Materials, Parts, Components and Services Reguisitioning Services from General Maintenance IV Plant Procedures Plant Procedure Control and Distribution VI Control of Engineering Documents VI Vendor Manual Control VI

! l Receipt and Acceptance of Purchased Materials VII Supplier Qualification Technical Evaluation VII Control of Purchased Services VII Control of Accepted Material, Parts and Components VIII Identification and Marking of Material VIII Revision 12 December 1986

Table l-l (cont'd)

Appendix B Ginna Procedures Criteria Control of Welding, Heat Treating and IX Nondestructive Examination Welding Equipment Performance Verification IX Nondestructive Examination 1X Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel Preventive Maintenance Programs for Electrical, Mechanical and Valves Inservice Inspection X, XIV Environmentally Qualified Equipment Maintenance Program Performance of Tests XI Qualification of Test Personnel XI Calibration and Control of Measuring Test Equipment XII Installed Plant Instruments and Equipment Maintenance and Inspection of Material Handling XIII Equipment, Control of Material Handling and Handling Equipment XIII Storage and Preservation of Materials XIII

)

Control of Heavy Loads at Ginna XIII

[

Station Holding Rules XIV Test Status Control XIV Bypass of Safety Function or Jumper Control XIV Control of Temporary Modifications XIV

(

Control and Disposition of Nonconforming Materials XV Revision 12 December 1986

Table l-l (cont d)

Appendix B Ginna Procedures Criteria Issue of Nonconformance Reports Corrective Action at Ginna Station XVI Ginna Records XVII I

Record Storage Facility and Equipment XVII Maintenance and History Program XVII L

Ginna Station Response to Internal Audits XVIII Revision 12 December 1986

g

'<<~

t ll

%+< e

Table l-l (cont'd)

Appendix B En ineerin Procedures Criteria Indoctrination and Training Engineering Department, Organization and Responsibilities Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Engineering Drawings Preparation, Review and Approval of Specifications Design Verification Design Interface Control Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase Requisition IV Engineering Procedures Engineering Procedure Deviation Request Distribution and Control of Documents by VI the Control Number Method Control of Documents by the List of VI Current Revisions Method Distribution and Control of Documents by Project Vl Correspondence Procedures Receipt, Control and Distribution of Drawings and Ap'erature Cards VI

(

Supplier Evaluation VII Revision 12 December 1986

Table l-l (cont'd)

Appendix B En ineerin Procedures Criteria Preparation, Review and Approval of Bid Requests, VII Bid Evaluations and Recommendations for Award Engineering Review of Nonconforming Materials, Parts XV or Components Initiating and Responding to Corrective Action Reports XVI Records XVII Engineering Response to Audits XVIII Revision 12 December 1986

C jS

Table l-l (cont'd)

Appendix B Purchasin Procedures Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel I k

Purchasing Department Organization and Responsibilities II Preparation, Review, Approval and Issuance of IV Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation IV Purchasing Procedures Purchasing Procedure Deviation Request.

Supplier Evaluation VII Establishment and Maintenance of Qualified VII.

Suppliers List Supplier Nonconformance Report Processing Purchasing Department Response to Corrective XVI Action Reports and Corrective Action Reporting Purchasing Records XVII Purchasing Response to Audits XVIII Revision 12 December 1986

b

%4 '

Table l-l (cont'd)

Appendix B General Maintenance Procedures Criteria Indoctrination and Training General Maintenance Organization and Responsibilities Documentation and Control'of Modification/

1 Fabrication Activities Preparation, Review and Approval of Purchase IV Reguisitions and Related Procurement Documents Quality Maintenance Procedures Quality Maintenance Procedure Deviation Request Preparation, Review and Approval of General Maintenance Fabrication Route Cards Control and Distribution of Documents Regulating VI Safety Related Activities Receipt and Acceptance of Purchased Materials VII Control of Accepted Material, Parts and Components VIII Traceability of Material VIII Issue, Control and Storage of Weld Consumables VIII Control of Welding IX Inspection and Surveillance Activities Conduct of Crane Operators XIII Control and Disposition of Nonconforming Material, XV Parts and Components Corrective Action at General Maintenance XVI Quality Maintenance Records XVII General Maintenance Response to Internal Audits XVIII

(

Revision 12 December 1986

Table l-l (cont'd)

Appendix B Research and Science Procedures Criteria Indoctrination and Training Research and Science Organization and Responsibilities Preparation, Review and Approval of Purchase IV Requisitions and Related Procurement Documents Quality Research and Science Procedures Quality Research and Science Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Control and Distribution of Documents Regulating VI Safety Related Activities Receipt and Acceptance of Purchased Materials VII Preparation, Review and Approval of Supplier VII Evaluation Welding Prodedure Preparation Review and Approval IX

,

Welding Procedure Qualification IX Heat Treating Procedures IX Welder Qualification and Currency IX Nondestructive Examination Procedures IX Nondestructive Examination Procedures Manual IX Nondestructive Examination Personnel Qualification IX Inservice Inspection Program and Plans Incorporating Ginna Modifications into Inservice Inspection Program Test Control XI Revision 12 December 1986

t3 r I t lL t

Table l-l (cont'd)

Appendix B Research and Science Procedures Criteria Test Personnel Qualification XI Calibration and Control of Nondestructive XII Examination Instruments Inspection and Maintenance of Material Handling XIII Equipment Overhead and Gantry Cranes XIII Inspection and Maintenance of Portable Lifting XIII and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems XIII Slings and Related Apparatus XIII Classification and Training of Material Handling XIII Equipment Personnel Mobile Hydraulic Cranes XIII Inspection and Maintenance of Jacks XIII Forklift Loading Forks XIII Monorails XIII Training and Qualification of Crane Operators XIII Lifting Devices in the Containment Vessel XIII Control and Disposition of Nonconforming Material, XV Parts and Components Corrective Action at, Research and Science XVI Quality Research and Science Records XVII Research and Science Response to Internal Audits XVIII Revision 12 December 1986

'

t 'I

Table -l-l (cont'd)

Appendix B Electric Transmission and Distribution Procedures Criteria Quality Assurance Program Implementation for Electric Transmission and Distribution Department Training of Electric Transmission and Distribution Personnel Electric Transmission and Distribution Organization Design/Modification Activities Control Control of Procurement Documents for Purchased IV Parts, Components and Services Preparation, Review, and Approval of Electric Transmission and Distribution and Laboratory Procedures Control of Electric Transmission and Distribution VI Procedures, Schedules and Test Form Books Supplier Qualification Technical Evaluation VII Receipt and Acceptance of Instrumentation and VII Standards Equipment Control of Purchased Services for EMAIL VII Identification and Control of Materials, Parts and VIII Components Performance of Tests at Ginna Station XI Performance of Tests at the Electric Laboratory XI Qualification of Test Personnel XI Calibration and Control of Test, Instruments XII Handling, Storage and Shipping XIII Inspection and Test Status at Electric Meter and XIV Laboratory Control and Disposition of Nonconforming Parts and Components Revision 12 December 1986

Table l-l (cont'd)

Appendix B Electric Transmission and Distribution Procedures Criteria

(

Initiating and Processing of Corrective Action Reports XVI Control of Quality Assurance Records XVII Response to Audits XVIII Revision 12 December 1986

.V 4p r+ J ty (i

/

fft t+8 lC At

TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents

1. ~fk-include:

formed.

'1d f h k 1

  • 2. Technical Re uirements by reference to specific drawings, speczfx.cat1.ons, codes, regulations, procedures or instruc-tions including revisions, therto that describe the items or services to be furnished. Also identified shall be'est, inspection and acceptance requirements, and any special re-quirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shpping and extended storage.
  • 3. ualit Assurance Pro ram Re irements which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier in-corporate appropriate quality assurance program require-ments in subtier procurement documents.

h f - 'd h f '1' d the supplier for source, inspection and audit by the Purchaser or parties designated by the purchaser. Also included shall f

be provisions for the identification of witness and hold points and the minimum time of advance notice.

"S. Documentation Re irements Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calcu-lations and analyses.

  • 6. Nonconformances Requirements for reporting and disposition of nonconformances to procurement requirements.
  • - Included in the review by Quality Assurance/Quality Control.

Revision 12 December 1986

I

'\'

TABLE l 8- l Audit List Functional Or anization Activities Audited Engineering Indoctrination and Training Design Control Procurement Document Control Document, Control Records Procurement Control Purchasing Indoctrination and Training Procurement Document Control Records and Document Control Procurement Control Ginna Station QA Indoctrination and Training Ginna Staff Training, Retraining-Qualification and Performance Modification Maintenance and Repair Procuren ent- Control Document Control and Records Inservice Inspection Surveillance Testing Handling, Storage and Shipping Facility Operation Conformance to all provisions contained in Technical Specifications and applicable license conditions Refueling Calibration and Control of Measuring and Test Equipment Health Physics 6 Chemistry Security Plan and Procedures Emergency Plan and Procedures Inspection & Surveillance

  • Fire Protection Program and Implementing Procedures Corrective Action associated with deficiencies occurring in facility equipment, struc-tures, y tens or methods of operation Revi ion 12 December 1986

TABLE l8-1 (cont'd.)

Audit- List Functional Or anization Activities Audited Transportation of Radioactive Waste Fire Protection and Loss Prevention Program Inspection and Audit

      • Fire Protection and Loss Prevention Program Independent Inspections and Audits Radiological Environmental Monitoring Program and Results Thereof
  • Offsite Dose Calculation Manual and Implementing Procedures
  • Process Control Program and Implementing Procedures
  • Biennially
      • Triennally General Maintenance Indoctrination and Training Maintenance and Repair Procurement Control Document Control and Records Shop Fabrication 'and Repairs Control of Measuring Equipment Special Processes Handling, Storage and Shipping Inspection and Surveillance Electric Transmission and Indoctrination and Training

'istribution Design/Modification Control Procurement Control Document Control and Records Handling and Shipping Control of Measuring and Test Equipment Test Control Revision 12 December 1986

TABLE 18-1 (cont'd. )

Audit List Activities Audited Research and Science Indoctrination and Training Handling, Storage, and Shipping Procurement, Control Welding and NDE Inservice Inspection Document Control Control of Measuring and Test Equipment Test Control Records Revision 12 December 1986

"

OI Sllf ENVISION ANO AOSNNNEAAEON CHAIRMANOF ONES R. E. GINNA NUCLEAR POWER PLANT

~ ~ ~ ~ LINES OF COMMUNKATION THE BOARD MANAGEMENT ORGANIZATION CHART PRESIDENT EXECUTIVE Sf NIOR VICE VKE PRESIDENT PRESIDENT GENERAL SE RVKES I I

I VKfPRESIDENt V.P. ELECTRIC VICf PRESIDENT VICE PRESIDENT PU&LKAFFAIRS, TRANSMISSION. fNGINEERING & f LECTRIC ~ NSAR& RATES PURCHASING CONSTRUCTION PRODUCTION 4 DISTRISUtlON CONTROLLER AND DISTRICTS CHIEF SUPERINTENDENT MANAGER lJl NUCLEAR SECURITY.

I ENGINEER PORC PRODUCTON CLAIMS.

DIV5ION INSURANCE SUPERINTENDENT DIVISION fMERGENCY TRAINING DIRECTOR OF PLANNER MANAGER SKURITY TIONN PURCHASING SUPT. SUPT. MANAGER DIRECTOR SUPT. DIRECTOR MANAGER MANAGER SUPT.

SUPT SUPERVISOR AGENT ELE CTRK ELECTRIC DIVISIONAL ENGINE E RING GENERAL Rf SEARCH 4 QUALITY NUCLEAR GINNA GINNA GINNA METER 4 LAS SU&STATIONS SERVKES SERVKES MAINTENANCE SCIENCE ASSURANCf ASSURANCE SUPPORT PRODUCTION SECURITY SERVICES PROCURE- METER DESIGN RKORDS & DESIGN FIELD & SHOP MATERIALS QUALITY QUALITY TKH SUPPORT STATION SKURITY MENT CALI&RATION TKH SUPPORT DOCUMENT CONSTRUC- FABRICATION f NGR. ENGR. CONTROL TESTING OPERATIONS SERVKES SERVKES & MAIN- ROTATING CONTROL TION SERVICES NDE ASSURANCE & FIRE PROT. MA'TE RIAL MAINTE-TENANCE fQUIP. MANT. SERVICES LKEHSING 5I & AUDIT SAFETY coNTRDL a NANCE M ELKTRIC LAS RELAY TESt 4 FUEL MGMT. & MHE U5P. Sf RVICES RKORDS & f LIAISON NGR. HP&

4R SERVICES CONSTRUC-Sf RVKfS TKH.

SUPPORT SERVKES DOC CONTROL SERVICES CHE M5TRY CONTROL SERVICES SERVKES FIGURE 2-1

The figure previously appearing on this page was deleted with the issuance of Revision 7, dated November 1980; Revision 12 December 1986

f.

4 4

I

ROCHESTER GAS AN RIC CORPORATION R. E. GINNA STATION ORGANIZATION QJtf RNFTE NDENT NUCLEAR PROOUCITON SUPE RINTENDENT SUPERINTENDENT OIVIQON TRAINING GINNA SUPPORT MANAGKN GINNA PRODUCTION SERVKES NUClfAR HEAlTH PHYQCS OPEMTION5 ADMINISTRATIVE TECHNKAL GINNA TRAINIHG A55UNANCE AND CHEMISTRY Sf RVKES MANAGfk MANAGER MANAGER MANAGER MANAGEN ISROI MANAGER OUAUTY CONTROL HEAITH REACTOR LKENSE TMWIHG NUDGET ENGAIKKA PHYQOSTS ENGINEER COOAOINATOA OtfkATIONS MDIATUN SUtl RVISON ISRO) ~ROCURE MlNT AKSULT5 ~ TES'F 5IMUIATOA TMINIIIG PROTECTION SUPERVISOR COOADINATOA fOAKMAN Qllft SUtERVISOR TRANSPORTATION REQIlTS AND ZEST HEALTH PHY5ICS TECHNIOANS I I SNIFT ISAOI, fONE MAN TRAIHWG MAINTENANCE fONKMEN MDIATION PROTECTNNI TECNIOANS 115HIFT HEAD CONTROL ii SIITEkS.

STORK 5, TECHNKIANS A tENSONMANCE GENERAl f MPLOYEE TMINWG TESTERS OtlRATON MS,CHANKS, t

I I SIUF INO) HANDYMEN SIRE PROTECTOR CCWTROL Otf RATOR RADKKHEMISt f

SAS TY COOAINNATON Il SIAFT INDI TECHNICAL AUXlliARY I~C COMWTER SY5TEM5 SUPERVISOR ANALYSt Ot f kATOR5 CHEMISTRY KSSIAFZ TECHNKIANS COMWTER

- I4 C AND TECHNKIAN5 ElECTRK FORE MEN ClNTRAL OPEMTIONAL RECORDS ASSESSMENT CHEMIST TfOUDOAN5, ENGINEER RE PAINE MEN 4 ELfCTRKIANS SHIF Z TECHNICAL ADVISOR CHEMISTRY I I SHIFT TECHNIOANS i WHEN RCS AVERAGE TEMlNATURE >KIXPF ii A 5ECOND 5RO WRL Nf ON 5HlfT AS 'f REOIARED RY I ~ Cfk SLSK WHKN RCS GINNA AVERAGE ZEMPKMTURE slOFf MODISKATION FIGURE 2-3 SUPPORT ocf Iihi 5

0

'

ELECTRIC TRANSMISSION A DISTRIBUTION DIVISION VICE PRESIDENT ELECTRIC TRANSMISSION &

DISTRIBUTION DIVISION SUPERINTENDENT ELECTRICMETER ELECTRIC

& LABORATORY SUBSTATIONS SUPERINTENDENT DEPARTMENT SUPERINTENDENT LABORATORY METER ASSISTANT MANAGER SERVICES MAINTENANCE SUPERINTENDENT ENGINEERING/

CONSTRUCTION/

RELAY TEST SUBSTATION CONSTRUC'I'ION/

ELECTRICIANS RE I.AY TEST NOTE: Chart is abreviated to show only key ENGINEERING H positions involved in implementing QA QR program and therefore does not show all MOTOR positions in the division. MAINTENACE QUALITY SERVICES RG&E 9r86 pcf 1 5 FIGURE 2-4

I OP

ENGINEERING DIV N ORGANIZATION VICE PRESIDENT ENGINEERING &, CONSTRUCTION CHIEF ENGINEER Superintendent, Director, Manager, Manager, Director, General Maintenance Engineering Quality Divisional Research Services Assurance Services &, Science

~ ~ ~ le ~ ~ ~ ~ ~

~ ~ ~ ~ ~

~ohio~ ~ ~~ ~ ~ al ~ ~ ~

Manager, "'hop Manager, Supervisor, Research and Operations Construction Cost and Development Engineering Quality Schedule Manager, Analyst Services Field Service Manager, Supervisor, Coordinator Operations and Electrical Office Services Manager, Project Planning Engineering and Environmental Document Control Manager, Manager, Science and Quality Assurance Administrative Mechanical Functional Staff Laboratory Service Services Engineering Management Lead Engineers Services Manager, Manager, Manager, Inspection/Land Nuclear Materials Survey and Building Engineering Engineering Services and Inspection Manager, Services Structural Engineering M

0 Administrative Project Direction RG&E Si86 pet 1 5 FIGURE 2-5

Rochester Gas and E c Corporation Ginna Station REVIEW and AUDITS FUNCTIONS NSARB QA PORC Electric Research Transmission General and Science and Purchasing Maintenance Engineering Plant Distribution Review M

Audits 0

Figure 2-6 RG&E 10/86 RAF

4