ML17309A388

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to QA Program for Station Operation, Involving Changes to Util Mgt,Engineering & General Maint & Reflecting Incorporation of Electric Substation & Research & Science Depts Into QA Program
ML17309A388
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/18/1986
From: Kober R
ROCHESTER GAS & ELECTRIC CORP.
To: Lear G
NRC OFFICE OF ADMINISTRATION (ADM), Office of Nuclear Reactor Regulation
Shared Package
ML17309A389 List:
References
NUDOCS 8612230350
Download: ML17309A388 (5)


Text

REGULATORY ORNATION DISTRIBUTION SYS 1 (RIDS)

ACCESSION NBR: 8612230350 DOC. DATE: 86/12/18 NOTARIZED: NO D NET 0 FAC IL: 50-244 Robert Emmet Qinna Nuclear Plant> Unit i. Rochester Q 05000244 AUTH. NANE AUTHOR AFFILIATION ROBER> R. W Rochester Qas Zc Electric Corp.

RECIP. NAI'1E RECIPIENT AFFILIATION LEAR, Q. PMR Prospect Directorate 1

SUBJECT:

Forwards Rev 12 to GA program for station operation>

involving changes to util mgt engineering 8r general main+ 8c ref'lecting incorporation of electric substation 5 r esearch Zc science. depts into GA program.

DIBTRIBUTION CODE: BOOED COPIEB RECEIVE .LTR CL l BIZE: c2 + 't>>7 TITLE: Quality Assurance Dist. for Amdt to Report NOTES: License Exp date in accordance with 10CFR2> 2. 109(9/19/72). 05000244 RECIPIENT COPIES RECIPIENT COP XES ID CODE/NANE LTTR ENCL ID CODE/NAI'1E LTTR ENCL PNR-A PD1 LA 1 0 DIIANNI>D 1 0 INTERNAL: ADN/LFNB 1 0 AEOD/PTB 1 1 IE FILE 1 1 ~I-Ei&GAOM/GAB 0 -- 2 2 RQN1 0 1 0 RQN3 1 0 R 1 0 RQN5 0 03 2 2 EXTERNAL: LPDR NRC PDR 02 J9 TOTAL NUBBER OF COPIES REQUIRED LTTR jh ENCL 8

0

",fi 4

~ 't4 It

'I 4

4 4I I'

I 4

4 I

iiiiiiIiiiiiigZZZS(in/

t uzziiEl/il irueuzz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 ROGER W. KOBER VICE PRESIOKNT TKI.KPHONK ELECTRIC KI STEAM PROOVCTION AREA COOK TIS 546-2700 December 18, 1986'.S.

Nuclear Regulatory. Commission Document Control Desk Attn: Mr. George Lear PWR Project Directorate No. 1 Washington, DC 20555

SUBJECT:

Submittal of Quality Assurance Program R.E. Ginna Nuclear Power Plant Docket. Number 50-244

Dear Dr. Murley:

In accordance with 50.54 of 10 CFR Part 50, enclosed is Revision 12 to the Quality Assurance Program for Station Operation.

The revision involves changes in the RGSE management, Engineering, Ginna Station and General Maintenance organizations. This revision also reflects the incorporation of the Electric Substa-tions and Research and Science departments into the Quality Assurance program.

The management organization chart incorporates the two aforementioned departments and has been reformated to show service and product lines for the various support organiza-tions. The other changes were minor and included title changes for two vice presidents and the establishment of a Division Training Manager for the Electric Production Division.

The Engineering Division organization, revised in 1985, was further revised earlier this year following,the retirement of the Assistant Chief Engineer. Included was the establishment of the Manager, Divisional Services having responsibility for records and document control services. The establishment of the Research and Science department r'esulted, in,the transfer of the Materials Engineering group 'from the General" Maintenance department. The Engin'eering, General Maintenancet'and,'Research and Science organi-zations are now depicted 'on a divisional chart.

Changes in the Ginna Station organization are two fold and include:

P......

8612230350 861218 PDR ADQCK 05000244 P.DR QIIO

)'J

ei+

J lj t 'h V

I I H H

December 18, 1986, Mr. George Lear Page 2

a. Change in title of Materials Supervisor to Administrative Services Manager in conjunction with the expanded responsibility for budget and transportation.
b. The Quality Control Inspection Supervisor now reports directly to the Nuclear Assurance Manager in lieu of the Quality Control Engineer. The change separates the quality involvement in work planning responsibilities being performed by the Quality Control Engineers from the more traditional verification inspection and surveillance activities.

Electric Transmission and Distribution Division is the larger organization referenced under the Quality Assurance Program following the inclusion of Electric Substations department along with the Electric Meter and Laboratory department. A divisional chart is now included in this program description.

Additionally, minor clarifications have been made to the sections associated with supplier selection (Section 7), Quality Assurance Manager experience and responsibility (Section 2), and clarification of those reports forwarded to Quality Assurance and management described in Sections 15 and 16.

The Table 1 listing of the various implementing procedures has also been revised to reflect the two added departments and related shift in responsibilities.

These organization changes which have also been submitted as a change to Technical Specifications, will not reduce the effec-tiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments.

V truly yours,

~.d-/--

Roger W "Kober RWK:cern Z0p Enclosure xc: T.J. Polich, Senior Resident Inspector USNRC Region 1