ML17342A762

From kanterella
Revision as of 09:19, 22 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards EGG-NTA-7738, TMI Action-NUREG-0737 (II.D.1) Relief & Safety Valve Testing,Turkey Point Units 3 & 4, Informal Technical Evaluation Rept.Addl Info Required to Reconfirm That GDC 14,15 & 30 Met
ML17342A762
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/23/1987
From: Roberts E
EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY
To: Carrington M
Office of Nuclear Reactor Regulation
Shared Package
ML17342A763 List:
References
CON-FIN-A-6492, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-TM EWR-154-87, NUDOCS 8707200109
Download: ML17342A762 (3)


Text

REGULATORY ORMATION DISTRIBUTION SY 4 (BIDS)

ACCESSION NBR: 8707200109 . DOC. DATE: 87/06/23 NOTARIZED: NO DOCKET FACIL: 50-250 Turkey Point Planti Unit 3i Florida Poeer and Light C 05000250 50-251 Turkey Point Plant> Unit 4i Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION ROBERTS> E. W. EGCcG Idaho'nc. (subs. of EGSGi Inc. )

ROBERTS'. W. Idaho National Engineering Laboratory RECIP. NAME RECIPIENT AFFILIATION CARRINQTONi M. Of f ice of Nuclear Reac tor Regulationi Director (Post 870411

SUBJECT:

Forwards EGQ-NTA-7738'TMI Action-NUREG-0737 (II. D. 1) "

Relief 8c Safety Valve Testing> Turkeg Point Units 3 5 4i informal technical evaluation rept. Addi info required to

~

reconfirm that GDC 14'5 0 30 met.

DISTRIBUTION CODE: H001D COPIES RECEIVED: LTR I ENCL J SIZE:

TITLE: File Location Distr ibution: NRR Docket 50 NOTES:

REC IP IENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL INTERN . R Q FILE 01 1 EXTERNAL: LPDR NRC PDR 1 1 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL

e~

0 v

Idaho illatlonal Enttlnoarlng laboratory June 23, 1987 Mr. M. Carrington, Program Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF TECHNICAL EVALUATION REPORT, "TMI ACTION--NUREG-0737 (II.D.1) RELIEF AND SAFETY VALVE TESTING, TURKEY POINT UNITS 3 AND 4," DOCKET NOS. 50-250 AND 50-251, EGG-NTA-7738, June 1987-EWR-154-87 Ref: INEL Technical Assistance To The Office of Nuclear'eactor Regulation, "Evaluation of OR Licensing Actions - NUREG 0737, II.D.1" (FIN A6492)

Dear Mr. Carrington:

In accordance with the above reference, INEL has been providing technical assistance to the Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation for the evaluation of plant-specific licensing submittals regarding qualification of safety and relief valves.

The enclosed report is an evaluation of the Turkey Point Units 3 and 4 (Docket Nos 50-250 and 50-251) submittal.

~ This evaluation found that the licensee, Florida Power 8 Light Co., has not provided acceptable submittals and responses to requests for additional information to reconfirm that the General Design Criteria 14, 15, and 30 of Appendix A to 10 CFR 50 have been met.

Very truly yours, E. Wayne Roberts, Manager NRC Headquarters Support CLN,cln

Enclosure:

pA As Stated ~C.

cc: C. G. Hammer, NRR-EMEB G. L. Jones, DOE-ID P. T. Kuo, NRR-EMEB A. S. Masciantonio, NRR-EMEB E. J. Sullivan, Jr., NRR-EMEB J. 0. Zane, EGSG Idaho (w/o Encl.)

+Q &&Pa& Idaho, Inc. 11428 Rockvllle Pike Sttite 41D Rockville, MD 2~

S707200i09 870+23 PDR ADOCK 05000250 P PDRQ