MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept ML17355A3711999-07-0606 July 1999 Forwards Revised EPIPs 0-EPIP-20201, Maintaining Emergency Preparedness - Radiological Emergency Plan Training & 0-EPIP-20126, Off-Site Dose Calculations. with Summary of Changes ML17355A3591999-06-30030 June 1999 Forwards Turkey Point,Unit 4 ISI Rept. Listed Repts Are Encl.No Eddy Current Exams Scheduled for Unit 4 Steam Generators ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17355A3571999-06-28028 June 1999 Informs That Util Voluntarily Reporting Facility Readiness as Outlined in Suppl 1 to GL 98-01.Encl Is Y2K Readiness Disclosure for Units 3 & 4,reporting Status of Facility Y2K Readiness ML17355A3521999-06-18018 June 1999 Forwards Response to NRC 990415 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML17355A3491999-06-0404 June 1999 Forwards Summary of Corrective Actions Implemented by FPL Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. ML17355A3441999-05-27027 May 1999 Modifies FPLs Consent to Confirmatory Order to Reflect Resolution of Four Issues Identified as Pending in L-99-031 ML17355A3451999-05-24024 May 1999 Requests Waiver of 520 Hours (13 Wks) Required Parallel Watchstanding in Control Room Prior to License Application Submittal for W Conley ML17355A2921999-04-22022 April 1999 Forwards Rev 35 to Turkey Point EP & Revised EPIP 0-EPIP-20101, Duties of EC, Per Requirements of 10CFR50, App E & 10CFR50.54(q).Summary of Changes,Encl.Implementation Date for Both Documents Was 990330 ML17355A2891999-04-0909 April 1999 Forwards Relief Request 20, Exempt Tendon Insp, Requesting Relief from ASME Section XI Code,1992 Edition,Paragraph IWL-2521.1(c) Which Requires That Each Exempted Tendon Be Examined IAW IWL-2524 & IWL-2525.Approval Needed by 991001 ML17355A2861999-04-0505 April 1999 Forwards COLR for Turkey Point Unit 4,Cycle 18,IAW TS 6.9.1.7 ML17336A0681999-04-0101 April 1999 Expresses Support for FP&L Request for Waiver of Applicable Review Fees Upon FP&L Submittal of an Application for License Renewal for Turkey Point Units 3 & 4 ML17355A2751999-03-25025 March 1999 Informs NRC & Staff of Fp&Ls Plans to Submit License Renewal Application for Turkey Point Units 3 & 4 by End of Dec 2000 ML17355A2641999-03-19019 March 1999 Requests Changes to FPL Official Service List for Turkey Point,Units 3 & 4.Add s Franzone & Remove G Hollinger from All Correspondence ML17355A2651999-03-19019 March 1999 Forwards Annual Radioactive Effluent Release Rept for Jan-Dec 1998 & Rev 7 to ODCM for Gaseous & Liquid Effluents from Turkey Point,Units 3 & 4. ML17355A2621999-03-16016 March 1999 Forwards Special Rept as Result of Turkey Point Unit 3 End-of-Cycle 16 ISI of SG Tubes.Rept Summarizes Results of SG Tube ISI ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML20204C6991999-03-10010 March 1999 Requests Amend to Turkey Point PSP to Modify Requirement to Post Security Officers to Provide Continuous Observation of Entire PA Perimeter in Event of Security Computer Failure. Change to Security Force Staffing Level Also Requested ML17355A2451999-03-0909 March 1999 Submits Info on FPL Current Levels of Nuclear Property Insurance,Per 10CFR50.54(w)(3) ML17355A2501999-03-0808 March 1999 Informs That Licensee Reviewed NRC 990228 Ltr Issuing Exemption Requested Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg.Tabulated Summary of Util Comments & Marked Copy of NRC Ltr & SER Encl ML17355A2441999-03-0101 March 1999 Provides Update to Util Written Notices,Dtd 961120 & 970627 of Claim Involving Alleged Bodily Injury Arising Out of or in Connection with Use of Radioactive Matl at Units 3 & 4 ML17355A2431999-02-25025 February 1999 Informs That FPL Does Not Have Any Candidates from Turkey Point Scheduled to Participate in 990407,Generic Fundamentals Examination (GFE) ML17355A2341999-02-18018 February 1999 Provides Response to RAI Re GL 97-01, Degradation of Crdm/ CEDM Nozzle & Other Vessel Closure Head Penetrations. L-99-042, Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3)1999-02-18018 February 1999 Forwards Rev 13 to Turkey Point Physical Security Plan,Per 10CFR50.54(p).Util Determined That Rev Does Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR2.790(a)(3) ML17355A2361999-02-18018 February 1999 Forwards Tabulation of 1998 Occupational Exposure Data for Turkey Point,Units 3 & 4,per TS 6.9.1.2.a.Reactor Coolant Specific Activity Limits of 100/E-bar Mci Per Gram of Gross Radioactivity Were Not Exceeded During 1998 ML17355A2301999-02-18018 February 1999 Forwards Semiannual Fitness for Duty Performance Data for Period of 980701-981231 for Turkey Point Units 3 & 4 ML17355A2231999-02-0808 February 1999 Informs That Util Will Comply with Commitment with Respect to Units 3 & 4,in Response to Ja Zwolinski 990129 Ltr.Util Also Agrees to Incorporate Commitment Into Confirmatory Order Modifying License Effective Immediately Upon Issuance ML17355A2031999-01-29029 January 1999 Forwards Rev 3 to Turkey Point Nuclear Plant Recovery Plan. Rev Does Not Decrease Effectiveness of Plan ML17355A2171999-01-20020 January 1999 Forwards Listed ISI Repts for Turkey Point Unit 3,in Accordance with Provisions of ASME Code,Section XI ML17354B2241999-01-0606 January 1999 Forwards Annual 10CFR50.46 Rept Re Changes To,Or Errors Discovered in ECCS Evaluation Models,Or in Application of Such Models That Effect Peak Clad Temp Calculation ML17354B2081998-12-15015 December 1998 Informs That Fpl,In Cooperation with State of Fl & County Emergency Response Agencies,Will Conduct Exercise of Turkey Point Radiological Emergency Plan on 990210.Scenario Package Forwarded to Emergency Preparedness Section Chief,Region II ML17354B2091998-12-15015 December 1998 Forwards Price Anderson Guarantees Annual Financial Rept,Per 10CFR140.21.Exhibit 1 Submitted to Satisfy Annual Financial Reporting Requirement of 10CFR50.71(b) ML17354B2061998-12-0909 December 1998 Informs That Request for Exemption Specified in Section II.B.3 Will Not Be Needed Re Fire Rating of Raceway Fire Barriers in Open Turbine Bldg ML17354B1981998-11-25025 November 1998 Forwards Scope & Objective for 1999 Plant Annual Emergency Preparedness Exercise.Objectives Developed in Conjunction with State & Local Govts.Exercise Scheduled for 990210 1999-09-09
[Table view] |
Text
PH.ICIER.I EY'
'ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9503310030 DOC.DATE: 95/03/24 NOTARIZED: YES DOCKET g FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit'4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION BOHLKE,W.H. Florida Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Provides util response to NRC RAI re validity & use of technical info provided by Thermal Science,Inc for resolution of fz.re barrier issues at plant.
DISTRIBUTION CODE: A029D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Generic Letter 92-008 Thermal-Lag 330 Fare Barrier NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 1 1 CROTEAU,R 1 1
'
INTERNAL: ILE=CENTER==-01 1 1 NRR/DE/EELB 1 NRR/DRPW/PD3-1 1 1 NRR/DSSA/SPLB 2 2 RGN2 ....FILE 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I OR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10
L-95-074 10 CFR 50.54(f)
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Response to Follow-Up to the Request for Additional Information Generic Letter 92-08 Thermo-La 330-1 Fire Barriers By letter dated December 26, 1994, the NRC issued to Florida Power and Light Company (FPL) a request foz additional information regarding Generic Letter (GL) 92-08, "Thermo-Lag 330-1 Fire Barriers." The December 26, 1994 letter requested information concerning the validity and use of technical information provided by Thermal Science, Incorporated for resolution of the fire barrier issues at Turkey Point Units 3 and 4.
In accordance with the NRC request, FPL provides the attached response. The attached information is provided pursuant to the requirements of Section 182a of the Atomic Energy Act of 1954, as amended, and 10 CFR 50.54 (f) .
Should there be any questions concerning this response, please contact us.
Vez truly yours, W. H. Bohlke Vice President Nuclear Engineering and Licensing OIH Attachment cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 95033i0030 950324 05000250 PDR ADOCK P PDR an FPL Group company
l'q~
a,~
~ ',.i.,',
STATE OF FLORIDA )
) ss.
COUNTY OF DADE )
W. H. Bohlke being first duly sworn, deposes and says:
That he is Vic Presiden Nuclear En ineerin and Licensin , of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.
W. H ~ Bohlke Subscribed and sworn to before me this day of 1995.
mes Name of Notary Public (Type or Print)
NOTARY PUBLIC, in and for the County of Dade, State of Florida My Commission expires Commission No.
W. H. Bohlke is personally known to me.
JAMES E. KNORR Mg COMMSSlON f CC +@~
i':: -'.:- EXPELS: muae22. ~999
'sa"~" coed TtwuHotae~++~~
Attachment to L-95-074 Page l of 5 RESPONSE TO NRC REQUEST FOR ADDXTXONAL XNFORMATION REGARDING GENERIC LETTER 92-08 "THERMO-LAG 330-1 FIRE BARRIERS" NRC REQUESTED INFORMATION: QUESTION 1 .A Describe the specific tests and analyses that will be performed to veri,fy that the Thermo-Lag fire barrier materials that are currently installed at Turkey Point Units 3 and 4, or that will be installed in the future, are representative of the materials that were used to address the technical issues associated with Thermo-Lag barriers and to construct the fire endurance and ampacity derating test specimens. The tests and analyses shall address the material properties and attributes that were determined or controlled by TSI during the manufacturing process and the quality assurance program. The tests and analyses shall also address the material properties and attributes that contribute to conclusions that the Thermo-Lag materials and barriers conform to NRC zegulatS.ons. These include:
(1) chemical composition (2) material thickness (3) material weight and density (4) the pzesence of voids, cracks, and delaminations (5) fS.re endurance capabilities (6) combustibility (7) flame spread rating (8) ampacity dezatS.ng (9) mechanical properties such as tensile strength, compressive strength, shear strength, and flexural strength.
FPL RESPONSE QUESTION 1.A:
FPL is currently participating in the effort initiated and sponsored by the Nuclear Energy Institute (NEI) to determine the fire rating of the installed Thermo-Lag material as well as determining modifications necessary to restore the Thermo-Lag fire barriers to their required rating. This program has included chemical composition testing of materials from plant 'stock as well as material used foz testing purposes. The conclusions of the chemical testing laboratory were that no significant variation in composition existed for any of the tested samples. Other testing has included fire endurance, flame spread, and combustibility.
A significant quantity of testing has been performed by NEI and member utilities with no indicat,ion of inconsistencies with the material. FPL is participating in the effort sponsored by NEI to further verify the chemical composition of Thermo-Lag materials. The NEI effort includes testing a number of samples from various participating plants, including Turkey Point Units 3 and 4. The results of this testing will provide a basis for comparison to the industry fire test data and to confirm applicability of generic test data with respect to fire endurance capability, combustibility, flame spread, heat release and ampacity.
Attachment to L-95-074 Page 2 of 5 FPL concurs with NEI's position that, all chemical testing should be performed to the same protocol as the previous NEI chemical testing method (i.e., pyrolysis gas chromatography), so as to provide a consistent generic basis for comparison. NEI's approach, by use of a generic pool, will cover a larger population of lot numbers and provide greater assurance of material consistency. NEI has agreed to function as a clearinghouse for the chemical test data and will provide the results to the NRC in a generic fashion.
NEI and other utilities have performed extensive testing in order to determine various capabilities of the Thermo-Lag 330 material. It is FPL's and NEI's position that only chemical analysis of a small number of plant specific samples is necessary to provide a reasonable assurance as to the applicability of the generic industry testing. Material properties and attributes such as fire endurance capability, flame spread, combustibility, etc., can be determined by the generic test data collected by NEI.
Information on the mechanical properties of Thermo-Lag installations do not relate to fire barrier performance, but rathez to integrity under normal service applications and seismic considerations. FPL treats fire barriers as seismic Category II/I. Mechanical properties of Thermo-Lag are not significant in terms of seismic integrity as opposed to the actual installation (i.e., location of tie wires, banding and other attachment methods). Mechanical properties are expected to vary only if chemical composition deviated.
The issues of material thickness and installation are addressed in FPL's response to Question 2 below.
Ampacity dezating has been addressed by FPL in existing calculations, FPL believes that there is sufficient margin in these calculations with regard to ampacity derating to bound any testing which may be performed. After an acceptable plan and test methodology have been established and agreed upon, and testing has been performed, FPL will review test results to determine there is any impact on ampacity derating calculations.
if NRC REQUESTED INFORMATION QUESTION 1.B Describe the methodology that will be used to determine the sample size and demonstrate that the sample size will be large enough to ensure that the information and data obtained will be sufficient to assess the total population of in-plant Thermo-Lag barriers and the materials that will be installed in the future. In determining the sample size, consider the time of installation and manufacture of the various in-plant materials and barrier installations. Give the number and types (e.g., panels, conduit preshapes, trowel-grade material, stress skin) of samples that will be tested or analyzed.
Attachment to L-95-074 Page 3 of 5 FPL RESPONSE QUESTION 1.B As discussed above, FPL is participating in the NEI effort to verify the composition of installed Thermo-Lag materials. The NEI effort includes testing a number of samples from various participating plants, including Turkey Point Units 3 and 4. FPL concurs with NEI's position that, based on the testing that has been performed, only chemical analysis of a small number of plant specific samples is necessary to determine composition.
Material properties and attributes such as fire endurance capability, flame spread, combustibility, etc., can be determined based on the generic test data collected by NEI. Inspection of samples from TSI and utilities following performance of fire testing indicate no variations in material fire endurance capability as a function of manufacture date.
FPL is providing seven Thermo-Lag samples from Turkey Point Units 3 and 4 in accordance with NEI's test program. Since Turkey Point Units 3 and 4 have shared facilities, such as the Auxiliary Building, one set of samples was detezmined to be sufficient for chemical testing. Of the seven samples, five are taken from "vintage" Thermo-Lag as prescribed by NEI (i. e., 1-houz conduit, 1-hour panel, 3-hour conduit, 3-hour panel, and trowel grade). The other two samples are taken from Thermo-Lag which was installed during the 1990-91 Dual Unit Outage. As only one-hour rated Thermo-Lag was installed, samples from a 1-hour conduit and a 1-hour panel were determined to be sufficient. The Thermo-Lag sampling is adequate, as this represents all of the "types" of Thezmo-Lag used at Turkey Point. Therefore, the Turkey Point samples are considered to be representative and to bound installations in the plant.
NRC REQUESTED INFORMATION QUESTION 1. C Submit the schedule foz verifying the Thermo-Lag materials.
FPL RESPONSE QUESTION 1.C Thermo-Lag samples from Turkey Point Units 3 and 4 are being forwarded to the NEI specified testing laboratory. This sampling was performed based on the guidelines provided in the NEI letter dated February 3, 1995.
NRC REQUESTED INFORMATION QUESTION 1.D After the analyses and tests have been completed, submit a written supplemental report that confirms that this effort has been completed and provide the results of the tests and analyses. Describe any changes to previously submitted plans or schedules that result from the tests or analyses.
FPL RESPONSE QUESTION 1.D Test data and results from the chemical testing will be provided from NEI generically. FPL will submit a supplemental report to confirm that the analyses and testing have been completed. Issues specific to Turkey Point will be discussed in the supplemental report.
AttaChment to L-95-074 Pag'e 4 of 5 NRC REQUESTED INFORMATION QUESTION 2.A Describe the examinations and inspections that will be performed to obtain the important barrier parameters given in Section II of the RAI of December 1993 for the Thermo-Lag fire barrier configurations installed at Turkey Point Units 3 and 4.
FPL RESPONSE QUESTION 2.A As discussed in FPL letter L-94-24, dated February 7, 1994, FPL is currently performing field walkdowns and destructive examinations of Thermo-Lag fire barriers (pull boxes and conduits) to verify installed configurations and important barrier parameters. This effort includes both indoor and outdoor Thermo-Lag fire barriers.
NRC REQUESTED INFORMATION QUESTION 2.B Describe the methodology that will be applied to determine the number and type of representative in-plant fire barrier configurations that will be examined in detail and demonstrate that the sample size is adequate to ensure that the information and data that will be obtained are adequate to assess the total population of in-plant Thermo-Lag barriers. A large enough sample of the total population of configurations should be examined to provide reasonable assurance that the materials and important barrier parameters used to construct the in-plant barriers and any future barrier installations or modifications, are representative of the parameters used to construct the fire endurance test specimens.
FPL RESPONSE QUESTION 2.B FPL has performed walkdowns to verify in-plant fire barrier configurations.
Destructive examination of fire barriers is currently limited to Thermo-Lag which has been identified for repair as part of the on-going Thermo-Lag inspection/repair program, or has been determined through evaluation as not being required. FPL believes that this sampling is adequate for verifying in-plant fire barrier configurations for the following reasons:
- 1) At Turkey Point, the installation of Thermo-Lag fire barriers has been performed by qualified and trained personnel in accordance with approved procedures. The approved procedures provide guidance for Thermo-Lag installation to assure that important installation criteria are met. Quality Control (QC) inspection provides independent, confirmation that the fire barrier installation meets or exceeds the requirements of the installation procedures. Section II of the December 1993 RAI identified critical barrier parameters which were part of the original installation pzocedure, but not necessarily part of the QC inspection. Limited sampling of fire barriers is being performed to assure that these additional parameters are met.
- 2) The destructive testing which has been performed has shown the barriers to be well constructed, having met or exceeded the installation guidelines.
Attachment to L-95-074 Page 5 of 5
- 3) The random and excessive destructive testing of Thermo-Lag fire barriers poses an undue burden on the plant. Additional destructive testing of fire barriers, and the costs and manpower associated with replacement of these barriers, is not considered an effective, or.
necessary use of plant resources.
NRC REQUESTED INFORMATION QUESTION 2. C Submit the schedule for obtaining and verifying all of the important barrier parameters.
FPL RESPONSE QUESTION 2.C FPL will complete the verification of important Thermo-Lag fire barrier parameters by June 30, 1995.
NRC REQUESTED INFORMATION QUESTION 2.D After the information has been obtained and verified, submit a wzitten supplemental report that confirms that this effort has been completed and provide the results of the examinations and inspections. Verify that the parameters of the in-plant configurations are representative of the parameters of the fire endurance test specimens. Describe any changes to previously submitted plans or schedules that result from the examinations.
FPL RESPONSE QUESTION 2.D FPL will submit a supplemental report to confirm that the important barrier parameters and fire barrier configurations have been verified. Based on a satisfactory resolution of the important fire barrier parameters issue and concerns related to the use of the NEZ application guide, FPL will reassess and describe its plans for resolution of Thermo-Lag issues and any changes to previously submitted plans oz schedules. FPL expects to complete these activities by November 15, 1995.