Reissue- Farley 2019 Exam Corporate Notification Letter
ML18337A042
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 12/03/2018
From: Eugene Guthrie
Division of Reactor Safety II
To: Madison D
Southern Nuclear Operating Co
References
IR 2018301
Download: ML18337A042 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 December 3, 2018 Dennis Madison Site Vice President Southern Nuclear Operating Co., Inc.

Joseph M. Farley Nuclear Plant 7388 North State Highway 95 Columbia, AL 36319

SUBJECT:

REISSUE - JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000348/2019301 AND 05000364/2019301

Dear Mr. Madison:

On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) issued the Notification of Licensed Operator Initial Examination for the Joseph M. Farley Nuclear Plant, which was memorialized as Agencywide Documents Access and Management System (ADAMS)

Accession Number ML18312A090. In reviewing this report, an administrative error was identified regarding the listed due dates of the preparatory examination material. Moreover, the appropriate branch chief/licensing authority for this examination required updating. Therefore, for the sake of clarity we are re-issuing the entire letter. We request that you disregard the previous information, and replace the previous letter with this letter in its entirety:

During a telephone conversation on October 10, 2018, between Mr. G. Ohmstede, Southern Nuclear Fleet Training Support Manager, other members of your staff, and Mr. M. Meeks, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Farley Nuclear Plant. The on-site preparatory week is scheduled for the week of May 6, 2019. The operating test is scheduled to be administered during the weeks of June 10 and June 17, 2019. The written examination is scheduled to be administered the week of June 24, 2019.

As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by January 11, 2019. The NRC provided the written examination outline to your staff in May, 2018. The operating test, written examination, and the supporting reference materials identified in Attachment 3 to ES-201 will be due by March 27, 2019. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

D. Madison 2 representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver and/or excusal requests (Office of Management and Budget (OMB) approval number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Meeks to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB approval number 3150-0090) and medical certifications (OMB approval number 3150-0024) should be submitted at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary.

Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.

Although the guidelines for receiving waiver or excusal requests call for at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398, Personal Qualifications StatementLicensee, or as directed by Mr. Meeks when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.

Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The burden to the public for these mandatory information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the

D. Madison 3 information collections. You may submit comments on any aspect of the information collections, including suggestions for reducing the burden, to FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information, unless the document requesting or requiring the collection displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the agencys Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection through ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html.

Thank you for your cooperation in this matter. Mr. Ohmstede has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail: Michael.Meeks@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.:50-348, 50-364 License Nos.:NPF-2, NPF-8 cc: Distribution via Listserv

D. Madison 4

SUBJECT:

REISSUE - JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000348/2019301 AND 05000364/2019301 dated December 3, 2018

  • See previous page for concurrence PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER: ML18337A042 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/ DRS/ OB1 RII/DRS/OB2 SIGNATURE MKM3 GXG NAME M.MEEKS E. Guthrie DATE 11/ 29 /2018 12/3 /2018 E-MAIL COPY? YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\OLExams\Farley Examinations\Initial Exam 2019-301\Correspondence\Reissued and Corrected Farley 2019 Exam Corporate Notification Letter.docx .