UNITED STATES NUCLEAR REGULATORY COMMISSION ust 30, 2019
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000348/2019301 and 05000364/2019301
Dear Mr. Kharrl:
During the period June 10 - 20, 2019, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the Joseph M. Farley Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on June 26, 2019.
Seven Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. One SRO applicant failed the operating test, and one SRO applicant failed the written examination. There were two post-administration comments concerning the written examination. These comments, and the NRC resolution of these comments, are summarized in Enclosure 2. A Simulator Fidelity Report is included in this report as Enclosure 3.
The initial examination submittal was within the range of acceptability expected for a proposed examination. All examination changes agreed upon between the NRC and your staff were made according to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
If you have any questions concerning this letter, please contact me at (404) 997-4662.
Sincerely,
/RA/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos: 50-348 and 50-364 License Nos: NPF-2 and NPF-8
Enclosures:
1. Report Details 2. Facility Comments and NRC Resolution 3. Simulator Fidelity Report
REGION II==
Examination Report Docket No.: 05000348, 05000364 License No.: NPF-2, NPF-9 Report No.: 05000348/2019301 and 05000364/2019301 Licensee: Southern Nuclear Company (SNC), LLC Facility: Joseph M. Farley Nuclear Plant Location: Columbia, AL Dates: Operating Test - June 10 - 20, 2019 Written Examination - June 26, 2019 Examiners: M. Meeks, Chief Examiner, Senior Operations Engineer M. Kennard, Operations Engineer N. Lacy, Operations Engineer Approved by: Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Enclosure 1
SUMMARY
ER 05000348/2019301, 05000364/2019301; June 10-20, 2019 & June 26, 2019; Joseph M.
Farley Nuclear Plant; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Joseph M. Farley Nuclear Plant staff developed both the operating tests and the written examination. The initial operating test, written RO examination, and written SRO examination submittals met the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period June 10-20, 2019. Members of the Joseph M. Farley Nuclear Plant training staff administered the written examination on June 26, 2019. Seven Reactor Operator (RO) and five Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. Twelve applicants were issued licenses commensurate with the level of examination administered.
There were two post-examination comments.
No findings were identified.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a. Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved Knowledge and Ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period June 10 - 20, 2019. The NRC examiners evaluated seven Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the Joseph M. Farley Nuclear Plant training staff administered the written examination on June 26, 2019. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Joseph M. Farley Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
b. Findings
No findings were identified.
The NRC developed the written examination sample plan outline. Members of the Joseph M. Farley Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 11 of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC determined, using NUREG-1021, that the licensees initial examination submittal was within the range of acceptability expected for a proposed examination.
Seven RO applicants and five SRO applicants passed both the operating test and written examination. One SRO applicant passed the operating test but did not pass the written examination. One SRO applicant passed the written examination but did not pass the operating test. Seven RO applicants and five SRO applicants were issued licenses.
Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted two post-examination comments concerning the written examination. A copy of the final written examination and answer key, with all changes incorporated, may be accessed may be accessed not earlier than September 21, 2021, in the ADAMS system (ADAMS Accession Number(s) ML19239A461 and ML19239A463).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On June 20, 2019, the NRC examination team discussed generic issues associated with the operating test with C. Kharrl, Senior Vice President, Joseph M. Farley Nuclear Plant, and other members of the Joseph M. Farley Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT Licensee personnel C. Kharrl Site Vice President J. Andrews Work Management Director O. Arrnes Maintenance Director J. Austin Training Director O. Bertagnolli Operations Training Requalification Lead D. Erb Operations Director R. McAdams Engineering Director V. Richter Operations Training Initial Lead B. Reed Operations Service Manager S. Schwindt Operations Training Manager G. Surber Licensing Manager NRC personnel P. Meier Resident Inspector
FACILITY POST-EXAMINATION COMMENTS AND NRC RESOLUTIONS
A complete text of the licensees post-examination comments can be found in ADAMS under
Accession Number ML19239A458.
Item
Question 2, K/A 003K3.02 - Knowledge of the effect that a loss or malfunction of the Reactor
Coolant Pump System (RCPS) will have on the following: Steam Generators (S/G)
Comment
The licensee recommends deleting this question from the exam due to no correct answer being
provided. As ran on the plant referenced simulator, steam generator pressures rise rapidly for
approximately 40 seconds after the initiating event followed by stabilization at approximately 55
seconds and beyond.
Basis:
1. This question asks the examinee to predict what a trend of Steam Generator (SG) pressures
would be at a specific time after trip of a Reactor Coolant Pump from 100% power. It asks for
trends of both an affected loop and unaffected loop. The question asks the examinee to identify
the direction of the trend (bolded and underlined) "at 60 seconds after."
2. Simulator Integrated Plant Computer (IPC) trends were analyzed after the loss of an RCP.
Based on the trends (attached) Steam generator pressures rise rapidly for approximately 40
seconds after the initiating event followed by stabilization at approximately 55 seconds and
beyond with steam dumps operating to maintain pressure.
3. See attached IPC trends from the Plant Reference Simulator for BOL, MOL, EOL conditions.
[NOTE: available at the ADAMS number referenced above] IPC trends represent a trip of the C
RCP, and values for B/C SG pressures as provided in the stem.
4. Looking at the specificity of the time stated in the question and the trends from the IPC, the
correct answer is - stable for both SGs. The correct answer was not provided on the exam.
5. Based on the exam validation genealogy and exam question analysis this question was
originally written to test knowledge of the comparison of steam generator pressure from 100%
steady state power to that following a RCP trip and reactor trip. Iterative changes and
adjustments to the wording resulted in a different question than originally validated. The final
exam version of the question asks the trend at a specific moment in time (60 seconds) and
contains no correct answer.
Facility Licensee Position:
Question 2- The facility agrees with the student's recommendation to remove question 2 from
the exam due to no correct answer available. The question asks what is happening to the SG
Pressure 60 Seconds after the transient. While the pressure was greater at one minute than at
the start, the pressure at 60 seconds has stabilized. There is no choice for a stable pressure
therefore there is no correct answer.
NRC Resolution
The licensees recommendation was accepted.
As mentioned above in the facilitys contention, the original intent of this question was to test
knowledge of the comparison of Steam Generator (S/G) pressures at an initial state of 100%
power, steady-state operation; and S/G pressures following a Reactor Coolant Pump (RCP) trip
in both an idle and operating Reactor Coolant System (RCS) loop. Due to various modifications
made during exam review and validation, the question was changed to ask the applicant to
demonstrate knowledge of the S/G pressure trends at a point in time exactly 60 seconds after
the RCP trip. This point of time was initially chosen to ensure that the S/G pressure trends
would all be consistent with their initial trends post-RCP trip.
It is technically valid that both the C and B S/G pressures would be rising 60 seconds after the
1C RCP trips from 100% power (and the Unit 1 Reactor also trips). However, at 60 seconds
post-trip, the S/G pressures are rising extremely slowly (e.g., ~0.019 psig/s in the C S/G and
~0.029 psig/s in the B S/G as run on the Farley plant referenced simulator). From the
standpoint of operational validity, these rates are so small that they would go unnoticed on the
control board instrumentation. Therefore, an operator would be correct to evaluate the C and
B S/G pressures as being stable at the 60-second post-trip time; in other words, in the control
room it would be incorrect to evaluate the S/G pressure as rising.
Because the question did not provide stable as an answer option, the NRC agreed with the
facility licensee that the question did not provide an operationally valid correct answer. NUREG-
21, section ES-403 D.1.c stated If three or more answers could be considered correct or
there is no correct answer, the question shall be deleted. Therefore, in accordance with ES-
403 section D.1.c, the NRC deleted Question 2 from the site-specific Farley 2019 written
examination, and graded all applicants written examinations accordingly.
Item
Question 61, K/A 103A1.01 - Ability to predict and/or monitor changes in parameters (to prevent
exceeding design limits) associated with operating the Containment system controls including:
Containment pressure, temperature, and humidity.
Comment
The licensee recommends deleting this question from the exam due to no correct answer being
provided. Part two of this question is invalid because there is no procedural guidance that can
be implemented at time 2200. No FNP procedure exists to vent containment in Modes 1-4 if
greater than 1 psig and less than 2 psig.
Basis:
1. The second part of this question places the examinee at a point where no TS values have
been exceeded.
2. Question asks what actions are REQUIRED at 2200. At this time, for the operating team to
stay within SOP guidance, the pressure rise should be addressed by implementing SOP-12.2.
Because pressure is greater than 0.4 psid, SOP-12.2 will direct the operator to SOP-10 for
POST LOCA VENTING, Attachment 1. SOP-10, Attachment 1, will direct the operator to
commence venting prior to 1.0 psig. Conditions in Containment at 2200 would be 1.5 psig, so
the guidance in the SOP will not allow the operator to commence venting. At time 2200,
Containment conditions would be outside of the procedure initial conditions, and the operator
would then be required to involve Operations Management to proceed.
3. Precaution and limitation of SOP -10, Attachment 1, requires the vent to be commenced if
pressure is less than 1 psig.
4. At time 2200 pressure would reach 1.5 psig, which would prevent the operator from using the
procedure for venting containment in Modes 1-4, when pressure is between 1 psig and less
than 2 psig.
Facility Licensee Position:
Question 61-The facility agrees with the student's recommendation to remove question 61 from
the exam due to no correct answer available. The first part of the question has a correct answer.
The second portion of the question does not have an answer consistent with station policies.
The question would drive the student to assess the proper actions to take at 2200. Containment
pressure is 1.5 psig, which is above normal operating values. An operator would use SOP-12.2
to lower pressure. SOP-12.2 would then direct the operator to SOP-10, Attachment 1. The
Precaution and Limitation at the beginning of Attachment 1 stated, "If in Modes 1-4 AND
performance of this appendix is required, the release should begin prior to CTMT pressure
reaching 1.0 psig. The expectation for Farley Nuclear Plant operators when Precautions and
Limitations are not met is to stop and get the larger Farley team engaged in the decision as to
how to move forward. Since in this case, they did not meet the Precautions and Limitations, the
correct action was to stop and allow the team to weigh in on the actions to move forward. This
was not an option for one of the answers on the second portion of the question, therefore there
was no correct answer.
NRC Resolution
The NRC deleted Question 61 from the examination. The basis for this action was as follows:
The second part of Question 61 stated: At 2200 Operators are required to _____ to address the
parameter chosen above. The correct parameter chosen above is Containment pressure (first
part question), and at time 2200 Containment pressure is explicitly stated to be (+) 1.5 PSIG in
the Question 61 stem. Accordingly, the second part of Question 61 may be re-stated as follows:
Operators are required to [either Start Containment mini-purge or Vent Containment] to
address that Containment pressure has risen from (-) 0.5 psig to (+) 1.5 psig in a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> time
frame, and is currently at (+) 1.5 psig.
The facility licensee rationale was that, because Containment pressure is (+) 1.5 psig; and there
is a precaution and limitation that stated: If in Modes 1-4 AND performance of this appendix is
required, the release should begin prior to CTMT pressure reaching 1.0 psig; then because the
operators did not meet the precautions and limitations, the correct action is to stop and allow
the team to weigh in on the actions to move forward. Although this may be a correct
administrative response to a potential procedure variance, stopping any operational actions to
allow the team to caucus and weigh in on actions to move forward does not provide an answer
the second part question, which specifically requires the applicant to choose an action to
address the parameter chosen above. Stopping to determine a course of action would not
address the containment pressure condition, and therefore would not be a correct answer to the
second part question.
Moreover, the procedural Precaution and Limitation (P&L) cited above (If in Modes 1-4 AND
performance of this appendix is required, the release should begin prior to CTMT pressure
reaching 1.0 psig) is a recommendation ( should begin prior to ) and not a requirement.
Therefore, the procedures needed to be examined as part of the NRC review to determine
which course or course(s) of action were available to the operators, given the conditions
provided in the question.
Based on the question stem, the NRC found that, at time 1000, Containment pressure would be
(-) 0.5 psig and would begin to rise. At this Containment pressure, the mini-purge system could
be placed in operation to address the rising pressure parameter. However, P&L 6. of Farley
procedure FNP-1-SOP-12.2, Containment Purge and Pre-Access Filtration System, stated:
Mini-purge supply and exhaust fans shall NOT be started with CTMT [Containment] pressure
greater than 0.25 psid. Furthermore, P&L 5. of SOP-12.2 stated: Main and mini-purge supply
and exhaust dampers must NOT be opened with CTMT pressure greater than 0.4 psid.
Accordingly, if (hypothetically) operators had started a mini-purge at approximately time 1000,
by 0.25 psig they would have secured fans, and by 0.4 psig the supply and exhaust dampers
would be required to be closed. Therefore, because by 2200 Containment pressure is explicitly
stated to be (+) 1.5 psig, the NRC concluded that Start Containment mini-purge would
definitely be a technically incorrect answer to the second part question statement.
As described in the question stem, as Containment pressure continued to increase beyond 0.4
psig, P&L 7. of SOP-12.2 would apply: If unable to commence a batch release of CTMT per
prior to exceeding 0.4 psid, FNP-1-SOP-10.0 Attachment 1 may be used for
instructions for venting CTM
- T. Therefore, it would be operationally valid to use SOP-10.0
1, Venting Containment to Reduce Containment Pressure When Containment
Purge is Secured, to vent Containment to address the rising Containment pressure parameter,
and therefore Vent Containment (distractor choice B, the initially keyed answer) is potentially
a technically correct answer. The only P&L of Attachment 1 of SOP-10.0 (If in Modes 1-4 AND
performance of this appendix is required, the release should begin prior to CTMT pressure
reaching 1.0 psig) has already been shown to be a recommendation and not a requirement,
and therefore would not preclude operators from starting a Containment vent at time 2200 with
Containment pressure at (+) 1.5 psig, if the operators so decided.
However, although venting Containment has been shown to be an operationally valid option, the
second part question statement specifically stated Operators are required to [emphasis
added]. From the standpoint of precise technical validity, the NRC agreed, in part, with the
licensees assertion that No FNP procedure exists to vent containment in Modes 1-4 if greater
than 1 psig and less than 2 psig. Or, more specifically, there is no FNP procedural requirement
to commence or continue a Containment Vent operation when Containment pressure is
specifically at (+) 1.5 psig. There are requirements to lower Containment pressure when
pressure reaches 2.0 psig; however, that is not what Question 61 asked the applicants to
evaluate. The NRC determined that operators are not procedurally required to begin or
continue venting Containment when pressure is (+) 1.5 psig. Therefore, the NRC agreed with
the contention there was not a technically correct answer to the second part question.
More broadly, Question 61 was an RO-level question, not an SRO-level question; it was not
intended that the question require a detailed knowledge of the procedures referred to in this
analysis. The procedures listed above were not referenced in the question stem or distractors.
It was intended that the applicant utilize system-level RO knowledge to understand that at
Containment pressures greater than 0.4 psig, mini-purge was not allowed to be placed in
service, and therefore Containment vent was the only other alternative.
In conclusion, the NRC determined that because there was not a specific requirement to vent
Containment at (+) 1.5 psig, there was not a technically valid answer provided to the applicants.
NUREG-1021, section ES-403 D.1.c stated If three or more answers could be considered
correct or there is no correct answer, the question shall be deleted. Therefore, in accordance
with ES-403 section D.1.c, the NRC deleted Question 61 from the site-specific Farley 2019
written examination, and graded all applicants written examinations accordingly.
SIMULATOR FIDELITY REPORT
Facility Licensee: Joseph M. Farley Nuclear Plant
Facility Docket No.: 05000348, 05000364
Operating Test Administered: June 10-20, 2019
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with Inspection
Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee
action is required in response to these observations.
No simulator fidelity or configuration issues were identified.
3