Entergy Nuclear Operations, Inc., RAI Regarding Technical Specification Changes to Pressure and Temperature Curves
ML062280434
Person / Time
Site: Pilgrim
Issue date: 08/18/2006
From: James Shea
NRC/NRR/ADRO/DORL/LPLA
To: Kansler M
Entergy Nuclear Operations
SHea J, NRR/DORL, 415-1388
References
TAC MD1218
Download: ML062280434 (6)


Text

August 18, 2006Mr. Michael R. KanslerPresident Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICALSPECIFICATION CHANGES TO PRESSURE AND TEMPERATURE CURVES(TAC NO. MD1218)

Dear Mr. Kansler:

By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. submitted an amendmentrequest to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification pressure and temperature curves. The Nuclear Regulatory Commission staff has been reviewing the submittal and hasdetermined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 60 days. Sincerely,/RA/James J. Shea, Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosure:

As statedcc w/encl: See next page August 18, 2006Mr. Michael R. KanslerPresident Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING TECHNICALSPECIFICATION CHANGES TO PRESSURE AND TEMPERATURE CURVES(TAC NO. MD1218)

Dear Mr. Kansler:

By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. submitted an amendmentrequest to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification pressure and temperature curves. The Nuclear Regulatory Commission staff has been reviewing the submittal and hasdetermined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). A response to these RAIs is requested to be provided within 60 days. Sincerely,/RA/James J. Shea, Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-293

Enclosure:

As stated cc w/encl: See next pageDISTRIBUTION:PUBLICRidsNrrDORLLpl1-1RidsOgcRPLLoisLPLI-1 R/FRidsNrrLASLittleRidsAcrsAcnwMailCenter RidsNrrPMJSheaRidsNrrDORLDprRidsRgn1MailCenterAccession Number: ML062280434 OFFICELPL1-1/PMLPL1-1/LASBWB/BCLPL1-1/BCNAMEJSheaSLittleGCranstonRLauferDATE8/17/068/18/068/18/068/18/06Official Record Copy REQUEST FOR ADDITIONAL INFORMATIONREGARDING TECHNICAL SPECIFICATION CHANGES TO REVISE PILGRIM PRESSURE AND TEMPERATURE CURVESENTERGY NUCLEAR OPERATIONS, INC.PILGRIM NUCLEAR POWER STATIONDOCKET NO. 50-293By letter dated April 12, 2006, Entergy Nuclear Operations, Inc. (Entergy) submitted anamendment request to revise the Pilgrim Nuclear Power Station (Pilgrim) Technical Specification (TS) pressure and temperature (P-T) curves. The Nuclear Regulatory Commission staff has been reviewing the submittal and hasdetermined that additional information is needed to complete its review. In your submittal, you requested TS 3.6.A.2 changes regarding revisions to the P-T limit curves. The revised P-T limits are based on recalculated vessel fluence values using the RAMA code.

The technical analysis in Section 4 of the submittal gives peak fluence values for 54 effective full-power years (EFPYs) at the 1-338A/C weld and the lower intermediate shell location.

However, the submittal includes curves for 24, 34, 44, and 54 EFPYs of operation for which fluence values are not presented. In addition, the RAMA approval includes limitations regarding the benchmarking of the code. Accordingly, please respond to the following request for additional information:1.Provide fluence values for the exposure for which you calculate limit P-T curves.

2.Identify the limiting material for each of the exposures if required.

3.Address the RAMA limitations for the Pilgrim application.Enclosure Pilgrim Nuclear Power Station cc:

Regional Administrator, Region IU. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Senior Resident InspectorU. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Post Office Box 867 Plymouth, MA 02360Chairman, Board of Selectmen11 Lincoln Street Plymouth, MA 02360ChairmanNuclear Matters Committee Town Hall 11 Lincoln Street Plymouth, MA 02360Chairman, Duxbury Board of SelectmenTown Hall 878 Tremont Street Duxbury, MA 02332Office of the CommissionerMassachusetts Department of Environmental Protection One Winter Street Boston, MA 02108Office of the Attorney GeneralOne Ashburton Place 20th Floor Boston, MA 02108MA Department of Public HealthRadiation Control Program Schrafft Center, Suite 1M2A 529 Main Street Charlestown, MA 02129Secretary of Public SafetyExecutive Office of Public Safety One Ashburton Place Boston, MA 02108 Director, Massachusetts EmergencyManagement Agency Attn: James Muckerheide 400 Worcester Road Framingham, MA 01702-5399Mr. William D. MeinertNuclear Engineer Massachusetts Municipal Wholesale Electric Company

P.O. Box 426 Ludlow, MA 01056-0426Mr. Kevin H. BronsonGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Michael A. BalduzziSite Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Stephen J. BethayDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508Mr. Bryan S. FordManager, Licensing Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill RoadPlymouth, MA 02360-5508

Pilgrim Nuclear Power Station cc:Mr. Gary J. Taylor Chief Executive Officer Entergy Operations 1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Oscar LimpiasVice President, Engineering Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael KanslerPresident Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Assistant General CounselEntergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601Ms. Stacey LousteauTreasury Department Entergy Services, Inc.

639 Loyola Avenue New Orleans, LA 70113Mr. James Sniezek5486 Nithsdale Drive Salisbury, MD 21801-2490Mr. Michael D. Lyster5931 Barclay Lane Naples, FL 34110-7306Mr. Garrett D. Edwards814 Waverly Road Kennett Square, PA 19348