IR 05000482-07-401; on 6/25/2007- 8/3/2007; Wolf Creek Generating Station; Security Baseline Inspection, Security Training - Letter Only
ML072490275
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/04/2007
From: Shannon M
Plant Support Branch Region IV
To: Muench R
Wolf Creek
References
IR-07-401
Download: ML072490275 (3)


Text

September 4, 2007Rick A. Muench, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839SUBJECT:WOLF CREEK GENERATING STATION - NRC SECURITY TEAM INSPECTIONREPORT 05000482/2007401

Dear Mr. Muench:

On August 3, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at your Wolf Creek Generating Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on August 3, 2007, with S. Hedges, Vice President of Operations & Plant Manager, and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. This report documents one finding of very low security significance (i.e. Green as determined bythe Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. NRC is treating this violation as a noncited violation consistent with Section VI.A.1 of the NRCEnforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for Wolf Creek Nuclear Operating Corporation-2 your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk,Washington DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Wolf Creek Generating Station facility.The finding was NRC identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390." and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/Michael P. Shannon, ChiefPlant Support Branch Division of Reactor SafetyDocket: 50-482License: NPF-42Nonpublic Enclosure: Inspection Report 05000482/2007401 w/Attachment: Supplemental Information Wolf Creek Nuclear Operating Corporation-3 cc w/o enclosure:Vice President Operations/Plant Manager Wolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839Supervisor LicensingWolf Creek Nuclear Operating Corp.

P.O. Box 411 Burlington, KS 66839