09/02/08 - LaSalle, Units 1 and 2 - Mid-Cycle Performance Review and Inspection Plan
ML082460280
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/02/2008
From: Kenneth Riemer
NRC/RGN-III/DRP/B2
To: Pardee C
Exelon Generation Co
References
FOIA/PA-2010-0209
Download: ML082460280 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 September 2, 2008

Mr. Charles G. Pardee

Chief Nuclear Officer and Senior Vice President Exelon Generation Company, LLC 4300 Winfield Road

Warrenville IL 60555

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - LASALLE COUNTY STATION UNITS 1 AND 2

Dear Mr. Pardee:

On August 14, 2008, the NRC staff completed its performance review of the LaSalle County Station Units 1 and 2 for the first half of the calendar year 2008 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.

Plant performance for the most recent quarter at LaSalle County Station Units 1 and 2 was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a triennial fire protection inspection, a biennial PI&R inspection, and an engineering modifications inspection. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC C. Pardee

Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection

plan. Sincerely,

/RA/ Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

LaSalle County Station Units 1 and 2 Inspection/Activity Plan

DISTRIBUTION:

See next page Letter to C. Pardee from K. Riemer dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - LASALLE COUNTY STATION UNITS 1 AND 2

cc w/encl: Site Vice President - LaSalle County Station Plant Manager - LaSalle County Station Regulatory Assurance Manager - LaSalle County Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Braidwood, Byron and LaSalle Associate General Counsel Document Control Desk - Licensing Assistant Attorney General J. Klinger, State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Grundy County Board Chairman Mayor of Ottawa Mayor of Streator City Manager of Streator Director, Grundy County Emergency Management Agency Mayor of Seneca Mayor of Grand Ridge Mayor of Ransom Sheriff, LaSalle County LaSalle County Board Chairman Director, LaSalle County Emergency Management Agency Mayor of Marseilles Mayor of Verona Mayor of Kinsman G. Mortensen, INPO C. Pardee

Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9628 with any questions you may have regarding this letter or the inspection

plan. Sincerely,

/RA/ Kenneth Riemer, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18

Enclosure:

LaSalle County Station Units 1 and 2 Inspection/Activity Plan

DISTRIBUTION:

See next page

DOCUMENT NAME: G:\1-SECY\2008 MID-CYCLE FINAL LETTERS\LASALLE MOC LETTER

2008.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME KRiemer:cms

DATE 8/ /08 OFFICIAL RECORD COPY Letter to C. Pardee from K. Riemer dated September 2, 2008

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - LASALLE COUNTY STATION UNITS 1 AND 2

DISTRIBUTION

Tamara Bloomer RidsNrrDorlLpl3-2 RidsNrrPMLaSalle Donna Williams

RidsNrrDirsIpab Resource

James Caldwell Mark Satorius Kenneth Obrien Jared Heck

Allan Barker

DRPIII RSIII Patricia Buckley Tammy Tomczak ROPreports@nrc.gov

LaSalle Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/29/2008 Report 22 1 ISFSI-PAD CONSTRUCTION Other Routine Review of 10 CFR 72.212(b) Evaluations at Operating Plants 08/01/2008 10/31/2008 1 60856.1 IP 2 TI-TEMPORARY INSTRUCTION 2515/171 Generic Safety Inspecti o Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 09/29/2008 10/03/2008 1 2515/171 IP 1 OA-OTHER ROUTIINE - RPV HEAD DROP Baseline Inspections Refueling and Other Outage Activities 09/29/2008 10/03/2008 1 7111120 IP 3 BI ENG-FIRE PROTECTION INFO GATHERING TRIP Baseline Inspections Fire Protection [Triennial]

10/20/2008 10/24/2008 1 7111105T IP 4 BI ENG-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections Fire Protection [Triennial]

11/03/2008 11/17/2008 1 7111105T IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections Radioactive Material Processing and Transportation 12/08/2008 12/12/2008 1 7112202 IP 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspection A lert and Notification System Testing 01/12/2009 01/16/2009 1 7111402 IP EP Baseline Inspection Emergency Response Organization Augmentation Testing 01/12/2009 01/16/2009 1 7111403 IP EP Baseline Inspection Correction of Emergency Preparedness Weaknesses and Deficiencies 01/12/2009 01/16/2009 1 7111405 IP Baseline Inspections Drill/Exercise Performance 01/12/2009 01/16/2009 1 71151-EP01 IP Baseline Inspections ERO Drill Participation 01/12/2009 01/16/2009 1 71151-EP02 IP Baseline Inspections A lert & Notification System 01/12/2009 01/16/2009 1 71151-EP03 IP 1 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections Inservice Inspection Activities - BWR 01/18/2009 01/22/2009 2 7111108G IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 01/26/2009 01/30/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 01/26/2009 01/30/2009 1 7112102 IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Generic Safety Inspecti o Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 03/09/2009 03/13/2009 1 2515/173 IP Baseline Inspections Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/09/2009 03/13/2009 1 7112201 IP 3 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.

Baseline Inspections Evaluations of Changes, Tests, or Experiments & Permanent Plant Modifications 09/15/2009 10/02/2009 1 7111117B IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections A ccess Control to Radiologically Significant Areas 09/21/2009 09/25/2009 1 7112101 IP Baseline Inspections A LARA Planning and Controls 09/21/2009 09/25/2009 1 7112102 IP Baseline Inspections Reactor Coolant System Activity 09/21/2009 09/25/2009 1 71151-BI01 IP Baseline Inspections Occupational Exposure Control Effectiveness 09/21/2009 09/25/2009 1 71151-OR01 IP Baseline Inspections RETS/ODCM Radiological Effluent 09/21/2009 09/25/2009 1 71151-PR01 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

LaSalle Inspection / Activity Plan 09/01/2008

-12/31/2009 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2008 Report 22 1 ISFSI-ISFSI - DRY RUN & INITIAL LOADING Other Routine Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 10/01/2009 12/31/2009 1, 2 60854.1 IP Other Routine Operation of an Independent Spent Fuel Storage Installation at Operating Plants 10/01/2009 12/31/2009 1, 2 60855.1 IP 4 BI PI&R-BIENNIAL PI&R INSPECTION Baseline Inspections Identification and Resolution of Problems 11/02/2009 11/20/2009 1 71152B IP 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections Licensed Operator Requalification Program 11/16/2009 11/20/2009 1 7111111B IP 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Generic Safety Inspecti o Review of the Implementation of the Industry Ground Water Protection Voluntary Initiative 11/30/2009 12/04/2009 1 2515/173 IP Baseline Inspections Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 11/30/2009 12/04/2009 1 7112203 IP This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.