MONTHYEARIR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) IR 05000277/20240022024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. IR 05000277/20244022024-03-12012 March 2024 Cybersecurity Inspection Report 05000277/2024402 and 05000278/2024402 (Cover Letter Only) ML24061A2642024-03-0101 March 2024 Revision of Two Procedures That Implement the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) Commissioners ML24060A1192024-02-29029 February 2024 Notification of Conduct of a Fire Protection Team Inspection 2024-09-06
[Table view] Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23110A2402023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Table of Contents ML23173A0132023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Structures and Shielding, Sections 1 Thru 4 - Redacted ML23110A2462023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, PEA Chapter 00, Cover Page and General Table of Contents ML23110A2472023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix E, Table of Contents ML23110A2372023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary, Table of Contents ML23110A2422023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation, Table of Contents ML23110A2592023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix N, Peach Bottom Site Meteorology ML23110A2392023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix D, Table of Contents ML23110A2532023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Sections 1 Thru 8 ML23110A2202023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Exhibit IV, Vessel Fabrication and Assembly ML23173A0552023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix E, Station Atmospheric Release Limit Calculations - Redacted ML23110A2232023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix G, Plant Nuclear Safety Operational Analysis ML23173A0402023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Control and Instrumentation - Redacted ML23173A0382023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted ML23172A2812023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Figures - Redacted ML23173A0582023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Figures - Redacted ML23110A2312023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 11, Table of Contents ML23110A2602023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 3, Figures ML23173A0162023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 5, Figures - Redacted Rev1 ML23173A0172023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Sections 10 Thru 23 - Redacted ML23172A2802023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Figures - Redacted ML23110A2652023-04-10010 April 2023 Submittal of Revision 29 to Updated Final Safety Analysis Report and Rev. 24 to Fire Protection Program ML23173A0452023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 9, Table of Contents - Redacted ML23172A2752023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Table of Contents - Redacted ML23173A0332023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 2, Site - Redacted ML23172A2622023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 7, Figures - Redacted ML23173A0482023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Table of Contents - Redacted ML23110A2562023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary ML23110A2322023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix P, Environmental Technical Specifications ML23173A0232023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 12, Figures - Redacted ML23110A2242023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Exhibit Vi.B Unit 3, Deleted ML23110A2612023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix O, Table of Contents ML23173A0592023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix J, Identification-Resolution of AEC-ACRS and Staff Concerns - Redacted ML23173A0492023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Figures - Redacted ML23110A2512023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, PEA Chapter 6, Figures ML23173A0572023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted ML23173A0562023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Auxiliary Systems, Sections 1 Thru 24 - Redacted ML23173A0292023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Figures - Redacted ML23173A0432023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Electrical Power Systems - Redacted ML23172A2842023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix C, Table of Contents - Redacted ML23173A0372023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix a, Pressure Integrity of Piping and Equipment Pressure Parts - Redacted ML23110A2482023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix K, Exhibit III, Summary Stress Report ML23110A2452023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix H, Table of Contents ML23110A2502023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 8, Table of Contents ML23110A2292023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 10, Table of Contents ML23110A2572023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 5, Containment ML23110A2212023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 1, Figures ML23110A2282023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix F, Interaction of Units 2 and 3 ML23110A2412023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Appendix Q, Figure ML23110A2622023-04-10010 April 2023 9 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents 2023-04-10
[Table view] |