ML12132A324

From kanterella
Revision as of 19:27, 28 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
2012 Dresden Nuclear Power Station Initial License Examination ES-D-1 ILT-N-2
ML12132A324
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/05/2012
From: David Reeser
Operations Branch III
To: David Reeser, Nelson J
Exelon Generation Co
Shared Package
ML11354A121 List:
References
Download: ML12132A324 (1)


Text

TQ-AA-151-F10 Revision 0 Page 1 of 1 SRRS: 3D.105 Scenario Outline Station: Dresden Generating Station Scenario No.:

ILT-N-2 Class ID:

Evaluators Operators / crew position 11-1 (2012-301) / ATC / BOP Initial Conditions:

/ CRS Initial Power = 75% Turnover: Load drop to support FRV maintenance Swap Reactor Building Fans for maitenance Event Remove 2B FRV from service for maintenance No. Malf. No. Event Type* Event Description 1 NONE N B OP HVAC - Reactor Building Fans, Swap For Maintenance 2 NONE N ATC FW - FWRV, Remove From Service For Maintenance 3 ADS3CBN ADS3CSD C / T BOP MAIN STEAM

- ERV, Spurious Opening 4 RRMFNALO RRDFBTRP C ATC HVAC - Recirc MG Vent Fan, Trips Due To Overcurrent 5 HPINIT I / T BOP HPCI - System, Spurious Initiation 6 SER0512 C ATC DWEDS - Alarm Failure, Manually Pump Sumps 7 NP2 M TEAM Manual Scram

- Loss Of Instrument Air System.

8 HPRMBRKP M TEAM EMERGENCY DEPRESSURIZE

- On 2 Areas Above Max Safe Radiation Levels Due To HPCI Steam Line Leak into the HPCI Room.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (T)ech Spec