Request for Additional Information Regarding License Request No. 217 and Changes to Operating License Conditions and Technical Specifications (TAC MF0602 and MF0603)
ML13137A460
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/23/2013
From: Farideh Saba
Plant Licensing Branch II
To: Nazar M
Nextera Energy
Saba, F E NRR/DORL/LPL2-2
References
TAC MF0602, TAC MF0603
Download: ML13137A460 (6)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 23,2013 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer NextEra Energy P. O. Box 14000 Juno Beach, FL 33408-0420 TURKEY POINT NUCLEAR PLANT, UNITS NOS. 3 AND 4 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE REQUEST NO. 217 AND CHANGES TO OPERATING LICENSE CONDITIONS AND TECHNICAL SPECIFICATIONS (TAC NOS. MF0602 AND MF0603)

Dear Mr. Nazar:

By letter dated September 14,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12262A290), as supplemented by letter dated January 29, 2013 (ADAMS Accession No. ML13037A387), Florida Power & Light Company (FPL, the licensee) requested an amendment to the Turkey Point Nuclear Plant, Units 3 and 4, Renewed Facility Operating Licenses.

The January 29,2013, supplement replaced the September 14, 2012, request in its entirety.

The licensee proposed changes to license conditions and revisions to Technical Specifications for Turkey Point Nuclear Plant, Units 3 and 4. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee in its January 29, 2013, letter and determined that additional information is needed to complete the review. The enclosed document contains the NRC staff's specific request for additional information (RAI). As previously discussed with Ms. Olga Hanek of your staff on May 15, 2013, the NRC is requesting a response to the RAI by May 31, 2013.

M. Nazar -2 Please contact Audrey Klett at 301-415-0489 if you have any questions.

Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

Request for Additional Information cc w/enclosure:

Distribution via Listserv REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST NO. 217 OPERATING LICENSE CONDITIONS AND TECHNICAL SPECIFICATIONS TURKEY POINT NUCLEAR PLANT, UNIT NOS. 3 AND 4 DOCKET NOS. 50-250 and 50-251 By letter dated September 14,2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML12262A290), as supplemented by letter dated January 29,2013 (ADAMS Accession No. ML13037A387), Florida Power & Light Company (FPL, the licensee) requested an amendment to the Turkey Point Nuclear Plant, Units 3 and 4, Renewed Facility Operating Licenses.

The January 29,2013, supplement replaced the September 14, 2012, request in its entirety.

The licensee proposed changes to license conditions and revisions to Technical Specifications for Turkey Point Nuclear Plant, Units 3 and 4. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the information provided by the licensee in its January 29, 2013, letter and determined that additional information is needed to complete the review. Request for Additional Information

  1. 1 TS pages 3/4 2-6a, 3/4 2-9a, 3/4 2-10a, 3/4 2-12a, and 3/4 3-40a are not on the pagination list in the application and are not shown as deleted in Attachment
1. Discuss the differences between pages 3/4 2-6 and 3/4 2-6a, 3/42-9 and 3/4 2-9a, 3/42-10 and 3/4 2-10a, 3/42-12 and 3/4 2-12a, and 3/4 3-40 and 3/43-40a.

Explain if a page is proposed to be deleted. Include which page is the appropriate page to delete between the two pages, and provide the basis for the deletion.

Request for Additional Information

  1. 2 Current TS page 3/49-14 is stated to become new page number 3/49-13 in the application enclosure; however, Attachment 2 shows the page as 3/4 9-12. Which page number will TS page 3/4 9-14 become: 3/49-13 or 3/4 9-12? Also provide any further corrections to the page numbers for the TS pages that follow current TS page 3/4 9-14 if needed (Le. current page 3/4 9-15 and 3/4 9-16). Request for Additional Information
  1. 3 Current TS page 3/4 9-16 is not on the pagination list in the application, and there is no request in this application for changes to or deletion of this page. Explain what FPL is proposing for TS page 3/49-16. Include the basis for any changes and any changes to the page number? Enclosure

-Request for Additional Information

  1. 4 Current TS page 3/4 5-17 contains a requirement that states: 5.6 COMPONENT CYCLIC OR TRANSIENT LIMIT 5.6.1 The components identified in Table 5.6-1 are designed and shall be maintained within the cyclic or transient limits of Table 5.6-1. However, Attachment 1 does not show any requirement on TS page 3/4 5-17; rather, only that it is being deleted. The application does not discuss the deletion of such a requirement, nor does the index reference TS 5.6 or Table 5.6-1. Is FPL proposing to delete TS 5.6? If so, provide a discussion that explains the basis for deletion.

If not, reflect current TS 5.6 in this amendment and explain where Table 5.6-1 is located. Request for Additional Information

  1. 5 Attachment 1 shows the index listing title for Figure 3.4-2 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS APPLICABLE UP TO 32 EFPY." However, Attachment 2 shows the index listing title for Figure 3.4-2 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM HEATUP LIMITATIONS (Heatup Rates of 60 and 1 OOOf/Hr) APPLICABLE FOR 48 EFPY (Without margins for instrumentation errors)." This is different from the current approved TS, and the application does not discuss the requested change. Provide a discussion that explains this proposed change, or return the title to what is currently approved.

Request for Additional Information

  1. 6 Attachment 1 shows the index listing title for Figure 3.4.3 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM COOLDOWN LIMITATIONS (100°F/hr)

APPLICABLE UP TO 32 EFPY." However, Attachment 2 shows the index listing title for Figure 3.4-3 as, "TURKEY POINT, UNITS 3&4 REACTOR COOLANT SYSTEM COOLDOWN LIMITATIONS (Cooldown Rates of 0, 20, 40, 60 and 1 OO°F/hr) APPLICABLE FOR 48 EFPY (Without margins for instrumentation errors)." This is different from the current approved TS and the application does not discuss the requested change. Provide a discussion that explains this proposed change, or return the title to what is currently approved.

Request for Additional Information

  1. 7 Attachment 1 shows the index listing title for Table 3.7-1 as, "MAXIMUM ALLOWABLE POWER RANGE NEUTRON FLUX LEVEL HIGH SETPOINT WITH INOPERABLE STEAM LINE SAFETY VALVES DURING THREE LOOP OPERATION," with "RANGE NEUTRON FLUX" being deleted and replaced by "LEVEL." However, the title of Table 3.7-1 in the TS is, "MAXIMUM ALLOWABLE POWER LEVEL WITH INOPERABLE STEAM LINE SAFETY VALVES DURING THREE LOOP OPERATION," which does not include "HIGH SETPOINT," and the application does not discuss this requested change. Provide a discussion that explains this proposed change, and correct the title so that it matches the title in the Table 3.7-1.

-3 Request for Additional Information

  1. 8 Attachment 1 shows the index listing title as "Standby Steam Generator Feedwater System," with "Steam Generator" being deleted. However, the application does not discuss this proposed change. Provide a discussion that explains this proposed change. Request for Additional Information
  1. 9 Attachment 1 shows the index listing title as "Feedwater Line Isolation Valves," with "Line" being deleted. However, the title in the TS is, "Feedwater Isolation," which does not include "Valves," and the application does not discuss this proposed change. Provide a discussion that explains this proposed change and correct the title so that it matches the title in the TS. Request for Additional Information
  1. 10 In the application, FPL stated, "The text on 5-4 moved to 5-1, on 6-12 moved to 6-5, on 6-23 moved to 6-22a, and on 6-25 moved to 6-24." However, Attachment 1 shows other TS pages where the text is proposed to be relocated; the page is being deleted, and the pages are not reflected in the application.

Provide a discussion that reflects every deleted page that has relocated text. Include the page number, what text is on the page, and the text's relocated position.

M. Nazar -2 Please contact Audrey Klett at 301-415-0489 if you have any Docket Nos. 50-250 and Request for Additional cc w/enclosure:

Distribution via LPL2-2 ADAMS Accession No.: ML13137A460 Sincerely, IRA! Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor licensing Office of Nuclear Reactor Regulation

  • concurrence via email OFFICE LPLlI-2 LPLlI-2/PM LPLlI-2/LA DSS/STSB/BC LPLlI-2/BC LPLlI-2 NAME AKlett FSaba KGoldstein for BClayton RElliot* JQuichocho FSaba DATE 05/20/13 05/21/13 05/20113 04/19/13 05/23/13 05/23/13 OFFICIAL RECORD