ML12262A290
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/14/2012
From: Kiley M
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2012-130
Download: ML12262A290 (46)


Text

L-2012-130 10 CFR 50.90 SEP 14 2012 FPL.

U. S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications

References:

(1) J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Alternative Source Term (TAC Nos. ME1624 and ME 1625)," Accession No. ML110800666, June 23, 2011.

(2) J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Fuel Criticality Analysis (TAC Nos. ME4470 and ME4471)," Accession No. ML11216A057, October 31, 2011.

(3) J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Control Room Habitability Technical Specification Task Force (TSTF)-448 (TAC Nos. ME4277 and ME4278)," Accession No. ML12067A176, March 30, 2012.

(4) J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Extended Power Uprate (TAC Nos. ME4907 and ME4908)," Accession No. ML11293A365, June 15, 2012.

On June 23, 2011, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment Nos. 244 and 240 to Renewed Facility Operating License Nos. DPR-31 and DPR-41 for the Turkey Point Nuclear Plant, Units Nos. 3 and 4, respectively, with supporting Safety Evaluation Report (SER) regarding the Alternative Source Term (AST) [Reference 1]. License Conditions 3.H. 1-3 for Unit 3 and 3.1.1-3 for Unit 4 were established addressing the AST modifications.

On October 31, 2011, the NRC issued Amendment Nos. 246 to DPR-31 and 242 to DPR-41 with supporting SER regarding Fuel Criticality Analysis [Reference 2].

On March 30, 2012, the NRC issued Amendment Nos. 248 to DPR-31 and 244 to DPR-41 with supporting SER regarding Control Room Habitability (CRH) [Reference 3]. License Conditions 3.1 for Unit 3 and 3.J for Unit 4 were established addressing testing and assessment.

On June 15, 2012, the NRC issued Amendments No. 249 to DPR-31 and 245 to DPR-41 with supporting SER regarding the Extended Power Uprate (EPU) [Reference 4]. License Conditions 3.J, 3.K, & 3.L for Unit 3 and 3.K, 3.L, & 3.M for Unit 4 were established addressing spent fuel pool cooling heat exchanger modifications, fuel thermal conductivity degradation analysis, and burnable absorber credit in the spent fuel pool.

Florida Power & Light Company *0A(c.l 9760 SW 344 St., Florida City, FL 33035 11d(LL

Turkey Point Units 3 and 4 L-2012-130 Docket Nos. 50-250 and 50-251 Page 2 of 2 The Unit 3 Cycle 26 Refueling Outage has implemented the AST, CRH, Fuel Criticality Analysis, and EPU Amendments above and satisfied several of the above license conditions for Unit 3 as well as several for Unit 4. These specific conditions can therefore be removed from their respective Operating Licenses.

As discussed with the NRC Reactor Systems Branch (SRXB) technical reviewer, a note allowing the crediting of burnable absorbers other than Integral Fuel Burnable Absorbers (IFBAs) in the spent fuel pool is being removed from two tables and one figure in TS Section 5.5.1. By removing the provision in the notes, crediting any burnable absorber other than Integral Fuel Burnable Absorber (IFBA) rods for the storage of fuel assemblies in the Region I spent fuel racks will be effectively prohibited. Therefore, the same prohibition established by License Conditions 3.L for Unit 3 and 3.M for Unit 4 can be deleted. Several inadvertent errors were also identified in the TS that require correction. Lastly, a revision to License Conditions 3.E for Unit 3 and 3.E for Unit 4 is proposed to update reference to the Physical Security Plan (PSP) to the latest approved title and revision level.

In accordance with the provisions of 10 CFR 50.90, Florida Power and Light Company (FPL) requests that Appendix A of Renewed Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Units 3 and 4 be amended to incorporate the enclosed Technical Specification (TS) revisions, revision of license condition 3.E for DPR-31 and DPR-41, deletion of license conditions 3.H, 3.1, 3J, and 3.L for DPR-31 and deletion of license conditions 3.H, 3.1.1 & 3.1.3, 3.J, 3.K, and 3.M for DPR-41.

Descriptions of the proposed TS and OL changes with supporting justifications and a no significant hazards determination and environmental consideration are provided in the Enclosure to this letter.

The Turkey Point Plant Nuclear Safety Committee (PNSC) has reviewed the proposed license amendments. The proposed TS changes have been evaluated in accordance with 10 CFR 50.91 (a)(1),

using the criteria in 10 CFR 50.92(c). FPL has determined that the proposed TS changes do not involve a significant hazards consideration.

The proposed license amendments change requirements with respect to the use of a facility component located within the restricted area as defined in 10 CFR Part 20. FPL has determined that the proposed amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite, and no significant increase in individual or cumulative occupational radiation exposure. Therefore, FPL has concluded that the proposed amendments meet the criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) and, pursuant to 10 CFR 51.22(b), an environmental impact statement or environmental assessment need not be prepared in connection with issuance of the amendments.

This letter contains no new commitments and no revisions to existing commitments.

In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.

Should you have any questions regarding this submittal, please contact Mr. Robert J. Tomonto, Licensing Manager, at (305) 246-7327.

Florida Power & Light Company 9760 SW 344 St., Florida City, FL 33035

Turkey Point Nuclear Plant L-2012-130 Docket Nos. 50-250 and 50-251 Page 3 of 3 I declare under penalty of perjury that the foregoing is true and correct.

Executed on September /__, 2012.

Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant Enclosure cc: USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 1 of 43 Enclosure Enclosure Turkey Point Units 3 and 4 License Amendment Request No. 217 Administrative Changes to Operating License Conditions and Technical Specifications

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 2 of 43 Enclosure TABLE OF CONTENTS LICENSE AMENDMENT REQUEST NO. 217 ADMINISTRATIVE CHANGES TO OPERATING LICENSE CONDITIONS AND TECHNICAL SPECIFICATIONS SECTION TITLE PAGE Cover Sheet 1

--- Table of Contents 2

1.0 Purpose and Scope

3 2.0 Background Information 3 3.0 Description of Proposed Changes 5 4.0 Basis/Justification of Proposed Changes 7 5.0 List of Commitments 20 6.0 Conclusion 21 7.0 No Significant Hazards Determination 22 8.0 Environmental Consideration 25 9.0 Summary of Results 26 10.0 References 26 11.0 Tables & Figures 29

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 3 of 43 Enclosure

1.0 Purpose and Scope

Florida Power and Light Company (FPL) proposes to amend Renewed Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Units 3 and 4 to (1) close and remove license conditions that have been fully satisfied as of the end of the Unit 3 Cycle 26 refueling outage, (2) revise TS 5.5.1 to remove related license conditions, (3) correct several inadvertent errors in the TS, and (4) update the reference to the Physical Security Plan (PSP) to the latest approved revision in the related license conditions. The license conditions that have been fully satisfied include 3.H on AST Modifications, 3.1 on Control Room Habitability, and 3.J on EPU Modifications for DPR-31 and license conditions 3.H on the Boraflex Remedy, 3.1.1 & 3.1.3 on AST Modifications, 3.J on Control Room Habitability, and 3.K on EPU Modifications for DPR-41.

The proposed amendments will delete TS Table 5.5.1 Notes 4 and 5, and revise TS Table 5.5-3 Note 4 and TS Figure 5.5-1 Note 3 to remove the phrase "or contains an equivalent amount of another burnable absorber". This proposed change prohibits crediting any burnable absorber other than Integral Fuel Burnable Absorber (IFBA) rods for the storage of fuel assemblies in the Region I spent fuel racks and would replace the same prohibition established by License Conditions 3.L for DPR-31 and 3.M for DPR-41; thereby, allowing deletion of these license conditions. In addition, the proposed amendments will correct several inadvertent errors identified in the TS including TS Figure 3.1-2 to address over-compensation for instrument uncertainty in the boric acid tank minimum volume curve for two unit operation as it was added twice, Surveillance Requirement (SR) 4.7.5.c to properly state that the in-place testing acceptance criterion for the assumed 99% filter efficiency (i.e.,

99.95% at 95/95 confidence level), SR 4.7.5.d.2 and 4.7.5.g to annotate a footnote, and TS 5.5.1.3 to delete conditional verbiage that was negated by earlier changes to TS 5.5.1.1 .f.

Lastly, a revision to License Conditions 3.E for DPR-31 and 3.E for DPR-41 is proposed to update the reference to the Physical Security Plan to the latest revision.

2.0 Background Information On November 13, 2009, the U.S. Nuclear Regulatory Commission (NRC) issued License Amendment No. 237 to DPR-41 for Turkey Point Unit 4 with supporting Safety Evaluation Report (SER) revising the date specified in License Amendment No. 229 for implementation of the Boraflex Remedy in the Turkey Point Unit 4 spent fuel pool [Reference 23]. License Amendment No. 237 established License Condition 3.H applicable for the period prior to the implementation of the Boraflex Remedy for which Boraflex continued to be credited for fuel storage in the Unit 4 spent fuel pool. License Amendment No. 229 has been implemented eliminating all credit for Boraflex in the Unit 4 spent fuel pool.

On October 31, 2011, the NRC issued Amendment Nos. 246 to DPR-31 and 242 to DPR-41 for the Turkey Point Nuclear Plant, Units Nos. 3 and 4, respectively, with supporting SER on the Fuel Criticality Analysis [Reference 1]. These amendments revised the spent fuel storage requirements specified in TS 5.5.1 Fuel Storage - Criticality and have been fully implemented; thereby, superseding the Boraflex Remedy amendments (Amendments 234 and 229) for both Unit 3 and Unit 4 and maintaining no credit for Boraflex.

During subsequent review of additional proposed changes to TS 5.5.1 in support of the Extended Power Uprate (EPU) project, the NRC Reactor Systems Branch (SRXB) technical reviewer identified proposed language in TS 5.5.1.2.b that would have allowed an equivalent

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 4 of 43 Enclosure amount of burnable absorber other than Integrated Fuel Burnable Absorber (IFBA) rods to be credited for new fuel storage. On February 15, 2012, FPL eliminated the proposed language via letter L-2012-050 [Reference 2]. Subsequent discussion with the NRC Project Manager (PM) and the SRXB technical reviewer identified similar language in two of the TS Tables and one of the TS Figures addressing spent fuel pool storage requirements and resulted in a proposed license condition for each unit (3.L for DPR-31 (Unit 3) and 3.M for DPR-41 (Unit 4)) that prohibited crediting of any burnable absorber other than IFBA for storage of fuel assemblies in the Region I spent fuel racks via letter L-2012-081 dated February 23, 2012 [Reference 3]. It was understood that these license conditions which were issued as part of the EPU amendments on June 15, 2012 [Reference 4] would remain in place until such time as the cited language in the two tables and one figure were removed.

The proposed amendments will revise TS Table 5.5-1 Note 5, TS Table 5.5-3 Note 4, and TS Figure 5.5-1 Note 3 to remove the phrase "or contains an equivalent amount of another burnable absorber" and to delete associated license conditions 3.L and 3.M for Units 3 and 4, respectively. TS 5.5.1.3 will also be revised to delete conditional phrase "Unless otherwise specified in accordance with Specification 5.5.1.1 .f," as TS 5.5. 1.l.f was revised via letter L-2011-386 on September 14, 2011 [Reference 5] to ensure that fuel assembly storage in spent fuel pool storage racks other than the cask storage area rack complies with only the storage configurations allowed by TS 5.5.1.3. This language is reflected in Amendment Nos. 246 and 242 [Reference 1].

On June 23, 2011, the NRC issued License Amendment Nos. 244 to DPR-31 and 240 to DPR-41 with supporting SER regarding the Alternative Source Term (AST) [Reference 6].

License Conditions 3.H for Unit 3 and 3.1 for Unit 4 were established addressing AST modifications. The modifications required by license conditions 3.H for Unit 3 have been implemented. The modifications required by license conditions 3.1.1 and 3.1.3 for Unit 4 have been implemented. The NaTB baskets associated with license condition 3.1.2 for Unit 4 have been installed; however, the specified quantity of NaTB is not scheduled to be loaded until the Unit 4 Cycle 27 outage.

On March 30, 2012, the NRC issued License Amendment Nos. 248 to DPR-31 and 244 to DPR-41 with supporting SER regarding Control Room Habitability (CRH) [Reference 7].

License Conditions 3.1 for Unit 3 and 3.J for Unit 4 were established addressing Control Room Envelope (CRE) testing and CRH assessment. The testing and assessment required by license conditions 3.1 for Unit 3 and 3.J for Unit 4 have been successfully completed.

The proposed amendments will correct two inadvertent errors in TS 3/4.7.5 Control Room Emergency Ventilation System. Specifically, TS Surveillance Requirement (SR) 4.7.5.c.(1) will be revised to cite the proper test acceptance criterion given in RG 1.52 [Reference 8] for an assumed 99% filter efficiency (i.e., 99.95% at 95/95 confidence level) and SR 4.7.5.d.2 and SR 4.7.5.g will be annotated with ***footnote to indicate that the subject testing applies to the both the normal filter train and the compensatory filtration unit. In addition, the ***footnote will be modified slightly to clarify that "use of the compensatory filtration unit" is part of the mitigating actions specified in Action a.5.

On June 15, 2012, the NRC issued Amendments Nos. 249 to DPR-31 and 245 to DPR-41 with supporting SER on the Extended Power Uprate [Reference 4]. License Conditions 3.J, 3.K, & 3.L for Unit 3 and 3.K, 3.L, & 3.M for Unit 4 were established addressing spent fuel

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 5 of 43 Enclosure pool cooling heat exchanger modifications, fuel thermal conductivity degradation analysis, and burnable absorber usage in the spent fuel pool. The confirmatory design and structural integrity information regarding the Units 3 and 4 spent fuel pool cooling heat exchanger modifications have been provided to the NRC [References 17, 18, and 22].

The proposed amendments will correct an inadvertent error identified in TS Figure 3.1-2 in which the boric acid minimum volume curve for two unit operation was overcompensated for level instrument uncertainty when the correction was applied twice for the same boric acid storage tanks, i.e., these tanks are common components shared by both units.

The proposed amendments will also revise the title for the Physical Security Plan (PSP) in license condition 3.E and delete license conditions 3.H on AST Modifications, 3.1 on Control Room Habitability, 3.J on EPU Modifications, and 3.L on Burnable Absorbers for DPR-3 1. The proposed amendments will also revise the title for the PSP in license condition 3.E and delete license conditions 3.H on the Boraflex Remedy, 3.1.1 & 3.1.3 on AST Modifications, 3.J on Control Room Habitability, 3.K on EPU Modifications, and 3.M. 1 on Burnable Absorbers for DPR-4 1. Note that license condition 3.1.2 regarding the NaTB baskets for Unit 4 will be deleted via a supplement to this submittal once the baskets have been loaded with the buffering agent.

3.0 Description of Proposed Changes The proposed TS changes affect the following:

  • SR 4.7.5.c.(1), Filter penetration and bypass leakage testing

" SR 4.7.5.d.2, CRE differential pressure testing

" TS Table 5.5-1 Notes 4 and 5, Blanketed Fuel - Coefficients to Calculate the Minimum Required Fuel Assembly Burnup (Bu) as a Function of Enrichment (En) and Cooling Time (Ct)

" TS Table 5.5-3 Note 4, Fuel Categories Ranked by Reactivity

" TS Figure 5.5-1 Note 3, Allowable Region I Storage Arrays The proposed OL changes for Unit 3 affect the following:

" 3.E, Physical Security Plan

" 3.H.1, AST Modifications - CREVS

" 3.H.2, AST Modifications - NaTB Baskets

" 3.H.3, AST Modifications - CREFS

" 3.I.(a), CRE Unfiltered Inleakage Test

  • 3.1(b), CRE Habitability Assessment
  • 3.I.(c), CRE Differential Pressure Test
  • 3.J.1, SFP Heat Exchanger Design
  • 3.L.1, Burnable Absorbers

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 6 of 43 Enclosure The proposed OL changes for Unit 4 affect the following:

0 3.E, Physical Security Plan

  • 3.H.(a), Boraflex Remedy - SFP Boron Concentration
  • 3.H.(b), Boraflex Remedy - BADGER Testing
  • 3.H.(c), Boraflex Remedy - Burnup/Configuration Restrictions a 3.H.(d), Boraflex Remedy - Fuel Movement Restrictions
  • 3.1.2, AST Modifications - NaTB Baskets
  • 3.I.(a), CRE Unfiltered Inleakage Test
  • 3.J.(b), CRE Habitability Assessment
  • 3.J.(c), CRE Differential Pressure Test
  • 3.K.1, SFP Heat Exchanger Design
  • 3.M. 1, Burnable Absorbers To provide more specific description of the proposed changes, TS mark-ups are attached and an item-by-item description is provided below with a brief justification for each change.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 7 of 43 Enclosure 4.0 Basis/Justification for the Proposed Changes 4.1 Changes to the PTN Technical Specifications 4.1.1 Technical Specification Table 3.1-2 Current TS Figure 3.1-2 BORIC ACID TANK MINIMUM VOLUME (1)

Modes 1, 2,3 and 4 M00 S 16000 w

M

.414000 12300

!C000 woo0 4.66 6

JR14 pnh1 (6992gpm) .(61 is*w (t o 11).

BAT INVENT0 RY CONCENTRATION (WEIGHT %Q:

' 11INIJIUM A=EPTABLE TWOQAT:CF5ZAT1(.*

--a-- MINIMUM ACCEPTABLE ONE UN9T op~twiONC2 I.

42, Ine~ftls M0ga~w thie shulad" Nor OUmlL

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 8 of 43 Enclosure Proposed TS FtGURE 3.1-2

ýBORIC ACID TANK MINIMUM VOLUME (1)

MODES I.2,3 AND4 220DO 21.150 20000 1811

~100

-j 4

4j 14000 mC 12000 1 1,2501

  • [ * --,**_. 0,775 I1D011 8000 3.00 3.25 3.50 3-75 4.00 (5245 ppm (082 ppm) (6119rppm) (&2Q3ppm)

BAT INVENTORY CONCENTRATION (WEIGHT %)

MiNIN M ACCEPTABLE T'WO IUNrT OPERATION

- =NIEVM ACCEPTABLE ONE UNIT OPERATION (2)

I Notes:

Corrhned vdtneoofallwat'blebu i acid tannks assw-g RWST boraonc .en bebv2400 ppmand2C0U ppm (n2ludes 2900 ga tsfohershutohddaimi Basis for the Change: An instrument uncertainty of 600 gallons was applied to the Boric Acid Tank (BAT) minimum volume curve for one unit operation and then doubled to 1200 gallons for the BAT minimum curve for two unit operation via L-2011-560 dated January 10, 2012 [Reference 9]. However, the BAT is common equipment that serves both units so the instrument uncertainty for two unit operation should not have been counted twice.

A markup of the TS change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 9 of 43 Enclosure 4.1.2 Technical Specification 4.7.5 Surveillance Requirements Current TS

c. 1 Verifying that the air cleanup system satisfies the in-place penetration and bypass leakage testing acceptance criteria of greater than or equal to 99%

DOP and halogenated hydrocarbon removal at a system flow rate of 1000 cfm

+10%***.

Proposed TS

c. 1 Verifying that the air cleanup system satisfies the in-place penetration and bypass leakage testing acceptance criteria of greater than or equal to 99.95%

DOP and 99% halogenated hydrocarbon removal at a system flow rate of 1000 cfm +/-10%***.

Basis for the Change: The AST radiological dose consequence analyses assumed 99% control room filter efficiency for particulates which requires an acceptance criterion for the DOP (Dioctyl Phthalate) test of 99.95% per RG 1.52 [Reference 8]

rather than 99% as currently stated. The required change to the DOP test acceptance criterion was inadvertently overlooked when the dose consequence analyses were revised to account for new meteorological data, increased filter efficiency, and decreased unfiltered air inleakage and the summary report resubmitted to the NRC via letter L-2010-137 on June 25, 2010 [Reference 10]. Correction of the acceptance criterion for the DOP test assures that the control room filter will satisfy the 99%

particulate filter efficiency assumed in the design basis dose analyses. The associated surveillance procedures have been revised and past surveillance results were found to have met this revised acceptance criterion.

A markup of the TS change is attached.

4.1.3 Technical Specification 4.7.5 Surveillance Requirements Current TS d.2 On a staggered test basis every 36 months, test the supply fans (trains A and B) and measure CRE pressure relative to external areas adjacent to the CRE boundary.

      • As the mitigation actions of TS 3.7.5 Action a.5 may include the use of the compensatory filtration unit, the unit shall meet the surveillance requirements of TS 4.7.5.b, by manual initiation from outside the control room and TS 4.7.5.c and d.

Proposed TS d.2 On a staggered test basis every 36 months, test the supply fans (trains A and B) and measure CRE pressure relative to external areas adjacent to the CRE boundary.***

      • As the mitigation actions of TS 3.7.5 Action a.5 may include the use of the compensatory filtration unit, the unit shall meet the surveillance requirements of TS 4.7.5.b, by manual initiation from outside the control room and TS 4.7.5.c, d and g.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 10 of 43 Enclosure Basis for the Change: The AST Amendments 244 and 240 annotated SR 4.7.5.d with the ***footnote regarding the applicability of surveillance requirement to the compensatory filtration unit [Reference 6]. TSTF-448 Amendments 248 and 244 inadvertently omitted the * **footnote when SR 4.7.5.d was split into SR 4.7.5.d.1 and SR 4.7.5.d.2; thereby, leaving the applicability of the surveillance requirement for the compensatory filtration unit unspecified [Reference 7]. Annotation of SR 4.7.5.d.2 with the ***footnote will simply restore the intent of the surveillance requirement as it applies to the compensatory filtration unit.

The proposed editorial change to the footnote clarifies its intent as indicated in TSTF-448 RAI response letter L-2011-380 dated October 27, 2011 [Reference 11]

in which TS 3.7.5 Action a.5 was amended to clarify that in the event of the filter train became inoperable, the mitigating actions required to be implemented included the immediate initiation of the compensatory filtration unit. Thus, the ***footnote needed to be revised to reflect this by deleting "may" and including SR 4.7.5.g.

A markup of the TS change is attached.

4.1.4 Technical Specification 4.7.5 Surveillance Requirements Current TS

g. By performing required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.

Proposed TS

g. By performing required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program.***

Basis for the Change: The AST Amendments 244 and 240 annotated SR 4.7.5.b, c, and d with the ***footnote regarding the applicability of surveillance requirements to the compensatory filtration unit [Reference 6]. TSTF-448 Amendments 248 and 244 inadvertently omitted the * ** footnote on TS 4.7.5. g; thereby, leaving applicability of surveillance requirement for the compensatory filtration unit unspecified [Reference 7].

The annotation of SR 4.7.5.g with the ***footnote will simply restore the intent of the surveillance requirement as it applies to the compensatory filtration unit as stated in letter L-2010-197 dated September 15, 2010 [Reference 12]: "The addition of the footnote is appropriate as the maintenance of the compensatory filtration unit must satisfy the applicable surveillance requirements imposed on the normal CREVS filter train (TS 4.7.5.b, c and d) in order to assure its operational readiness."

A markup of the TS change is attached.

4.1.5 Technical Specification 5.5.1 Fuel Storage - Criticality Current TS 5.5.1.3 Credit for burnup and cooling time is taken in determining acceptable placement locations for spent fuel in the two-region spent fuel racks.

Unless otherwise specified in accordance with Specification 5.5. 1. .f, fresh or irradiated fuel assemblies shall be stored in compliance with the following:

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 11 of 43 Enclosure Proposed TS 5.5.1.3 Credit for burnup and cooling time is taken in determining acceptable placement locations for spent fuel in the two-region spent fuel racks.

UnkOSS -hznvie.

. szzifiz' in aecor-dancc-with 88pe"ifl'tiz' -------- f, Fresh or irradiated fuel assemblies in the Region I or Region II racks shall be stored in compliance with the following:

Basis for the Change: The conditional phrase above was added to TS 5.5.1.3 via letter L-2011-032 dated February 22, 2011 [Reference 13] which submitted the current fuel storage criticality analysis as part of license amendment request 207.

TS 5.5.1.1 .f was later revised to delete the provision for alternate configurations other than those allowed by TS 5.5.1.3 via letter L-2011-386 dated September 14, 2011 [Reference 5]. The proposed deletion of the conditional phrase in TS 5.5.1.3 removes the inconsistency between TS 5.5.1. .f and TS 5.5.1.3 as written.

A markup of the TS change is attached.

4.1.6 Technical Specification Table 5.5-1 Blanketed Fuel - Coefficients to Calculate the Minimum Required Fuel Assembly Burnup (Bu) as a Function of Enrichment (En) and Cooling Time (Ct) - Notes 4 and 5 Current TS

4. Category I-1 is fresh unburned fuel up to 5.0 wt% U-235 enrichment.
5. Category 1-2 is fresh unburned fuel that obeys the IFBA requirements in Table 5.5-4 or contains an equivalent amount of another burnable absorber.

Proposed TS

4. Deleted.
5. Deleted.

Basis for the Change: Although this language was approved by the NRC on October 31, 2011 with the issuance of Amendments 246 and 242 [Reference 1], the SRXB Technical Reviewer, as part of his review of the EPU LAR [Reference 4], questioned the allowance of another burnable absorber other than IFBAs in the spent fuel pool as it was not explicitly identified and documented in the newly approved criticality analysis (WCAP-17094-P, Rev 3) [Reference 14]. As a result, a license condition for each unit (3.L.1 for DPR-31 (Unit 3) and 3.M.1 for DPR-41 (Unit 4)) was established prohibiting credit for any burnable absorber other than IFBA for the storage of fuel assemblies in the Region I spent fuel racks [Reference 4] until the TS language could be corrected by removal of the above provision. In addition, it has been determined that Table 5.5-1 is not applicable to either Category I-I or 1-2 fuel. Therefore, these notes are being deleted.

A markup of the TS change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 12 of 43 Enclosure 4.1.7 Technical Specification Table 5.5-3 Fuel Categories Ranked by Reactivity - Note 4 Current TS

4. Category 1-2 is fresh unburned fuel that obeys the IFBA requirements in Table 5.5-4 or contains an equivalent amount of another burnable absorber.

Proposed TS

4. Category 1-2 is fresh unburned fuel that obeys the IFBA requirements in Table 5.5-4 or contain an equivalent amount of another-burnable a.Lzc. he-Basis for the Change: Although this language was approved by the NRC on October 31, 2011 with the issuance of Amendments 246 and 242 [Reference 1], the SRXB Technical Reviewer, as part of his review of the EPU LAR [Reference 4], questioned allowing credit for another burnable absorber other than IFBAs in the spent fuel pool as it was not explicitly identified and documented in the newly approved criticality analysis (WCAP-1 7094-P, Rev 3) [Reference 14]. As a result, a license condition for each unit (3.L for DPR-31 (Unit 3) and 3.M for DPR-41 (Unit 4)) was established prohibiting credit for any burnable absorber other than IFBA for the storage of fuel assemblies in the Region I spent fuel racks [Reference 4] until the TS language could be corrected by removal of the above provision. Therefore, the text is being deleted.

A markup of the TS change is attached.

4.1.8 Technical Specification Figure 5.5-1 Allowable Region I Storage Arrays - Note 3 Current TS

3. Category 1-2 is fresh unburned fuel that obeys the IFBA requirements in Table 5.5-4 or contains an equivalent amount of another burnable absorber.

Proposed TS

3. Category 1-2 is fresh unburned fuel that obeys the IFBA requirements in Table 5.5-4 or-cxntain' an eqjuivalent amount of another burnable aLhose4,z,.

Basis for the Change: Although this language was approved by the NRC on October 31, 2011 with the issuance of Amendments 246 and 242 [Reference 1], the SRXB Technical Reviewer, as part of his review of the EPU LAR [Reference 4], questioned allowing credit for another burnable absorber other than IFBAs in the spent fuel pool as it was not explicitly identified and documented in the newly approved criticality analysis (WCAP-17094-P, Rev 3) [Reference 14]. As a result, a license condition for each unit (3.L for DPR-31 (Unit 3) and 3.M for DPR-41 (Unit 4)) was established prohibiting credit for any burnable absorber other than IFBA for the storage of fuel assemblies in the Region I spent fuel racks [Reference 4] until the TS language could be corrected by removal of the above provision. Therefore, the text is being deleted.

A markup of the TS change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 13 of 43 Enclosure 4.2 Changes to the PTN Renewed Operating Licenses 4.2.1 Renewed Operating License DPR-31 Condition 3.E. "Physical Security Plan" Current OL The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan - Revision 3 "submitted by letter dated May 18, 2006.

Proposed OL The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Florida Power & Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Revision 15" submitted by letter dated August 3, 2012.

Basis for the Change: Revision 15 to the Physical Security Plan was submitted via letter L-2012-305 dated August 3, 2012 [Reference 15].

A markup of the OL change is attached.

4.2.2 Renewed Operating License DPR-31 Condition 3.H "Alternative Source Term (AST) Modifications" Current OL H. 1 FPL will relocate the CR Ventilation System emergency air intakes prior to implementation of AST. The relocated intakes and associated ductwork will be designed to seismic criteria, protected from environmental effects, and will meet the requirements of 10 CFR 50 Appendix A, GDC 19. The new intakes will be located near the ground level extending out from the southeast and northeast comers of the auxiliary building and will fall within diverse wind sectors for post-accident contaminants. FPL will perform post-modification testing in accordance with the plant design modification procedures to ensure the TS pressurization flow remains adequate to demonstrate the integrity of the relocated intakes. In addition, FPL will provide to the NRC a confirmatory assessment which demonstrates that the requirements of 10 CFR 50 Appendix A, GDC 19 will be met. The confirmatory assessment will follow the methodology in Amendment 244

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 14 of 43 Enclosure

[the alternative source term amendment] including the methods used for the establishment of the atmospheric dispersion factors (X'Q values).

H.2 FPL will install ten (two large and eight small) stainless steel wire mesh baskets containing NaTB located in the containment basement to maintain pH during the sump recirculation phase following a Design Basis LOCA.

H.3 The CREVS compensatory filtration unit, which is being installed by FPL as part of the AST methodology implementation at Turkey Point, will be designed in accordance with the Class I Structures, Systems, and Equipment Design Requirements defined in Appendix 5A of the Turkey Point UFSAR. As such, the compensatory filtration unit will be designed so that the stress limits found in Table 5A-1 of the Turkey Point UFSAR will not be exceeded due to the loadings imposed by a maximum hypothetical earthquake. FPL shall ensure that the design of the compensatory filtration unit satisfies these stress limits prior to the implementation of the proposed AST methodology at Turkey Point.

Proposed OL Deleted.

Basis for the Change: License condition 3.H. 1 was satisfied with the relocation of the control room emergency air intakes and post-modification testing that included flow balancing, control room pressurization testing, and tracer gas testing. The required confirmatory assessment was provided to the NRC via letter L-2011-277 on August 11, 2011 [Reference 16]. License condition 3.H.2 was satisfied with the installation of the ten baskets loaded with the specified quantity of NaTB. License condition 3.H.3 was satisfied with installation and testing of compensatory filtration unit. AST Amendment No. 244 including TS 3/4.7.5 on CREVS and EPU Amendment No. 249 have been implemented for Turkey Point Unit 3.

A markup of the OL change is attached.

4.2.3 Renewed Operating License DPR-31 Condition 3.1 "Control Room Habitability" Current OL Upon implementation of Amendment No. 248 adopting TSTF-448 Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by Surveillance Requirement (SR) 4.7.5.g, in accordance with Technical Specification (TS) 6.8.4.k.c.(i), the assessment of CRE habitability as required by Specification 6.8.4.k.c.(ii), and the measurement of CRE pressure as required by Specification 6.8.4.k.d, shall be considered met. Following implementation:

(a) The first performance of SR 4.7.5.g, in accordance with Specification 6.8.4.k.c.(i), shall be within the specified Frequency of 3 years, plus the 9 month allowance of SR 4.0.2, as measured from July 31, 2009, the date of the most recent tracer gas test.*

(b) The first performance of the periodic assessment of CRE habitability, Specification 6.8.4.k.c.(ii), shall be within 3 years, plus the 9-month

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 15 of 43 Enclosure allowance of SR 4.0.2, as measured from July 31, 2009, the date of the most recent tracer gas test.

(c) The first performance of the periodic measurement of CRE pressure, Specification 6.8.4.k.d, shall be within 36 months on a STAGGERED TEST BASIS, plus the 138 days allowed by SR 4.0.2, as measured from the date of the most recent successful pressure measurement test, or within 138 days of license amendment implementation if not performed previously.

  • The most recent tracergas test (July 31, 2009) was unsuccessful in that there was a measured9 cfm control room inleakage: the acceptance criteriais 0 cfm.

In accordancewith Regulatory Guide (RG) 1.197 Rev. 0, a recalculationof the consequences to the control room operators was performed, and the results were acceptablefor continued CREVS operability. Consistentwith RG 1.197, afull test is to be conducted three years later to ascertainwhether the CRE's integrity has continued to degrade.

Proposed OL Deleted.

Basis for the Change: License conditions 3.I.(a) & (c) were satisfied with completion of the tracer gas testing and pressurization testing of the Control Room using the main control room emergency ventilation system filter train on July 18, 2012 and using the compensatory filtration unit on July 25, 2012. License condition 3.I.(b) was satisfied with completion of the required CRE Habitability Assessment.

A markup of the OL change is attached.

4.2.4 Renewed Operating License DPR-31 Condition 3.J "Extended Power Uprate Modifications" Current OL J. 1 Prior to completion of the Cycle 26 refueling outage for Unit 3, the licensee shall provide confirmation to the NRC staff that the design and structural integrity evaluations associated with the modifications related to the spent fuel pool supplemental heat exchangers are complete, and that the results demonstrate compliance with appropriate UFSAR and code requirements.

As part of the confirmation, the licensee shall provide a summary of the structural qualification results of the piping, pipe supports, supplemental heat exchanger supports, and the inter-tie connection with the existing heat exchanger for the appropriate load combinations along with the margins.

Proposed OL Deleted.

Basis for the Change: The above license condition has been satisfied with the submission of the requested design information via letters L-2012-143 and L-2012-179 dated June 19, 2012 and July 13, 2012, respectively [References 17 and 18].

NRC closed this item via letter on August 2, 2012 [Reference 19].

A markup of the OL change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 16 of 43 Enclosure 4.2.5 Renewed Operating License DPR-31 Condition 3.K "PAD TCD Safety Analyses" is renumbered as 3.H to account for the proposed deletions above.

A markup of the OL change is attached.

4.2.6 Renewed Operating License DPR-31 Condition 3..L "Burnable Absorbers in the Spent Fuel Pool" Current OL L.1 With respect to Technical Specification 5.5.1.3, FPL shall not credit any burnable absorber other than Integral Fuel Burnable Absorber (IFBA) rods for the storage of fuel assemblies in Region I spent fuel racks.

Proposed OL Deleted.

Basis for the Change: The above license condition was established for each unit to prohibit the crediting of any burnable absorber other than IFBA rods for storage of fuel assemblies in the Region I spent fuel racks [Reference 4] until provisions in TS Table 5.5-1, Table 5.5-3, and Figure 5.5-1 were revised to remove such an allowance.

Therefore, the license condition can now be deleted.

A markup of the OL change is attached.

4.2.7 Renewed Operating License DPR-41 Condition 3.E. "Physical Security Plan" Current OL The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Florida Power and Light & FPL Energy Seabrook Physical Security Plan, Training and Qualification Plan and Safeguards Contingency Plan - Revision 3 "submitted by letter dated May 18, 2006.

Proposed OL The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Florida Power & Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program - Revision 15" submitted by letter dated August 3, 2012.

Basis for the Change: Revision 15 to the Physical Security Plan was submitted via letter L-2012-305 dated August 3, 2012 [Reference 15].

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 17 of 43 Enclosure A markup of the OL change is attached.

4.2.8 Renewed Operating License DPR-41 Condition 3.H Current OL H. FPL will implement the following measures as part of the request for a change in the implementation date for Amendment 229 for Unit 4. These measures will remain in place until Amendment No. 229 is implemented or until the NRC approves the license amendment request discussed in Item (b) below but not later than February 28, 2011.

(a) The Unit 4 Spent Fuel Pool (SFP) boron concentration will be increased to and maintained no less than 2100 ppm. This measure will be implemented within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of installing the transfer tube gate isolating the SFP from the reactor cavity during the current Unit 4 refueling outage.

(b) FPL will complete Boraflex panel surveillance using EPRI BADGER neutron attenuation methodology in the Unit 4 SFP no later than May 30, 2010. The report documenting the results of the EPRI BADGER testing campaign and the license amendment request updating the SFP licensing basis will be submitted to the NRC no later than 90 days after completion of the BADGER testing.

(c) FPL will increase the current MWD/MTU burnup requirements for SFP Region II storage by 10% and will configure the SFP to comply with these requirements or insert an RCCA in any fuel assembly not in compliance with these requirements. These measures will be completed by February 28, 2010.

(d) FPL will not move any fuel assemblies into the Unit 4 SFP subsequent to the successful completion of startup physics tests for Unit 4 Cycle 25.

Proposed OL H. Deleted.

Basis for the Change: The above license conditions 3.H(a), (b), (c), & (d) for Unit 4 are associated with the implementation of the Amendment 229 on Boraflex Remedy.

As required by H(b) above, the results of the EPRI Badger testing for Unit 4 were provided to the NRC via letter L-2010-173 dated August 5, 2010 [Reference 20]

while License Amendment Request No. 207 updating the SFP licensing basis with a new criticality analysis for new fuel and spent fuel pool storage was submitted to the NRC via letter L-2010-169 dated August 5, 2010 [Reference 21 ]. The other measures detailed above remained in place until Amendment 229 was fully implemented in September 2010. Since full implementation of Amendment 229, these measures have not been required. In addition, Amendments 246 and 242, issued on October 31, 2011 [Reference 1], and the LAR 207 associated criticality analysis [Reference 14]

have been implemented and supersede the fuel storage requirements specified in Amendments 234 and 229. Therefore, the above license condition can be deleted.

A markup of the OL change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 18 of 43 Enclosure 4.2.9 Renewed Operating License DPR-41 Condition "Alternative Source Term (AST) Modifications" Current OL 1.1 FPL will relocate the CR Ventilation System emergency air intakes prior to implementation of AST. The relocated intakes and associated ductwork will be designed to seismic criteria, protected from environmental effects, and will meet the requirements of 10 CFR 50 Appendix A, GDC 19. The new intakes will be located near the ground level extending out from the southeast and northeast corners of the auxiliary building and will fall within diverse wind sectors for post-accident contaminants. FPL will perform post-modification testing in accordance with the plant design modification procedures to ensure the TS pressurization flow remains adequate to demonstrate the integrity of the relocated intakes. In addition, FPL will provide to the NRC a confirmatory assessment which demonstrates that the requirements of 10 CFR 50 Appendix A, GDC 19 will be met. The confirmatory assessment will follow the methodology in Amendment 240

[the alternative source term amendment] including the methods used for the establishment of the atmospheric dispersion factors (X/Q values).

1.2 FPL will install ten (two large and eight small) stainless steel wire mesh baskets containing NaTB located in the containment basement to maintain pH during the sump recirculation phase following a Design Basis LOCA.

1.3 The CREVS compensatory filtration unit, which is being installed by FPL as part of the AST methodology implementation at Turkey Point, will be designed in accordance with the Class I Structures, Systems, and Equipment Design Requirements defined in Appendix 5A of the Turkey Point UFSAR. As such, the compensatory filtration unit will be designed so that the stress limits found in Table 5A-1 of the Turkey Point UFSAR will not be exceeded due to the loadings imposed by a maximum hypothetical earthquake. FPL shall ensure that the design of the compensatory filtration unit satisfies these stress limits prior to the implementation of the proposed AST methodology at Turkey Point.

Proposed OL 1.1 Deleted.

1.2 FPL will install ten (two large and eight small) stainless steel wire mesh baskets containing NaTB located in the containment basement to maintain pH during the sump recirculation phase following a Design Basis LOCA.

1.3 Deleted.

Basis for the Change: License conditions 3.1.1 and 3.1.3 have been satisfied for Turkey Point Unit 4. The NaTB baskets have been installed in Unit 4; however, license condition 3.1.2 will not be completed until the baskets are loaded with the specified quantity of NaTB during the Unit 4 Cycle 27 refueling outage.

A markup of the OL change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 19 of 43 Enclosure 4.2.10 Renewed Operating License DPR-41 Condition 3.J "Control Room Habitability" Current OL Upon implementation of Amendment No. 244 adopting TSTF-448 Revision 3, the determination of control room envelope (CRE) unfiltered air inleakage as required by Surveillance Requirement (SR) 4.7.5.g, in accordance with Technical Specification (TS) 6.8.4.k.c.(i), the assessment of CRE habitability as required by Specification 6.8.4.k.c.(ii), and the measurement of CRE pressure as required by Specification 6.8.4.k.d, shall be considered met. Following implementation:

(a) The first performance of SR 4.7.5.g, in accordance with Specification 6.8.4.k.c.(i), shall be within the specified Frequency of 3 years, plus the 9 month allowance of SR 4.0.2, as measured from July 31, 2009, the date of the most recent tracer gas test.*

(b) The first performance of the periodic assessment of CRE habitability, Specification 6.8.4.k.c.(ii), shall be within 3 years, plus the 9-month allowance of SR 4.0.2, as measured from July 31 ,2009, the date of the most recent tracer gas test.

(c) The first performance of the periodic measurement of CRE pressure, Specification 6.8.4.k.d, shall be within 36 months on a STAGGERED TEST BASIS, plus the 138 days allowed by SR 4.0.2, as measured from the date of the most recent successful pressure measurement test, or within 138 days of license amendment implementation if not performed previously.

The most recent tracergas test (July 31, 2009) was unsuccessful in that there was a measured9 cfm control room inleakage."the acceptance criteriais 0 cfm.

In accordancewith Regulatory Guide (RG) 1.197 Rev. 0, a recalculationof the consequences to the control room operators was performed, and the results were acceptablefor continued CREVS operability. Consistent with RG 1.197, a full test is to be conducted three years later to ascertainwhether the CRE's integrity has continued to degrade.

Proposed OL J. Deleted.

Basis for the Change: License conditions 3.J.(a) & (c) were satisfied with completion of the tracer gas testing and pressurization testing of the Control Room using the main control room emergency ventilation system filter train on July 18, 2012 and using the compensatory filtration unit on July 25, 2012. License condition 3.J.(b) was satisfied with completion of the required CRE Habitability Assessment.

A markup of the OL change is attached.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 20 of 43 Enclosure 4.2.11 Renewed Operating License DPR-41 Condition 3.K "Extended Power Uprate Modifications Current OL K. I Prior to completion of the Cycle 27 refueling outage for Unit 4, the licensee shall provide confirmation to the NRC staff that the design and structural integrity evaluations associated with the modifications related to the spent fuel pool supplemental heat exchangers are complete, and that the results demonstrate compliance with appropriate UFSAR and code requirements.

As part of the confirmation, the licensee shall provide a summary of the structural qualification results of the piping, pipe supports, supplemental heat exchanger supports, and the inter-tie connection with the existing heat exchanger for the appropriate load combinations along with the margins.

Proposed OL K Deleted.

Basis for the Change: The above license condition has been satisfied with submission of the requested design information via FPL letter L-2012-318 dated August 10, 2012

[Reference 22]. NRC closed this item via letter on September 13, 2012 [Reference 24].

A markup of the OL change is attached.

4.2.12 Renewed Operating License DPR-41 Condition 3.M "Burnable Absorbers in the Spent Fuel Pool" Current OL M. 1 With respect to Technical Specification 5.5.1.3, FPL shall not credit any burnable absorber other than Integral Fuel Burnable Absorber (IFBA) rods for the storage of fuel assemblies in Region I spent fuel racks.

Proposed OL Deleted.

Basis for the Change: The above license condition was established for each unit to prohibit the crediting of any burnable absorber other than IFBA rods for storage of fuel assemblies in the Region I spent fuel racks [Reference 4] until provisions in TS Table 5.5-1, Table 5.5-3, and Figure 5.5-1 were revised to remove such an allowance. Therefore, the license condition can now be deleted.

A markup of the OL change is attached.

5.0 List of Commitments None

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 21 of 43 Enclosure 6.0 Conclusion The proposed amendments include TS changes to selected notes in Tables 5.5-1 and 5.5-3 and in Figure 5.5-1 to remove the provision for crediting of burnable absorber other than IFBA rods for the storage of spent fuel assemblies inthe spent fuel pool racks. Accordingly, the proposed amendments include deletion of license conditions 3.L in DPR-31 and 3.M in DPR-41 with the approval of these TS changes. The proposed amendments will also delete license condition 3.H for Unit 4 only, associated with implementation of the Amendment No.

229 (aka "Boraflex Remedy") as it is no longer required.

Additionally, several inadvertent errors identified in the TS that require correction including TS Figure 3.1-2 to address over-compensation for instrument uncertainty in the boric acid tank minimum volume curve for two unit operation as it was added twice, TS Surveillance Requirement (SR) 4.7.5.c. 1 in which the acceptance criterion for the DOP test was incorrectly stated as 99% rather than 99.95%, SR 4.7.5.d.2 & 4.7.5.g to which the applicable footnote regarding the compensatory filtration unit was inadvertently omitted, and TS 5.5.1.3 in which conditional verbiage is deleted to be consistent with a previously approved TS change to TS 5.5.1.i .f. The correction of the acceptance criteria for the DOP test assures test results support the 99% particulate filter efficiency assumed in the dose analyses. The annotation of the footnote to the latter two SRs assures that the compensatory filtration unit will meet the same surveillance requirements as those for the normal filter train.

For DPR-3 1, the proposed amendments will revise the title for the Physical Security Plan (PSP) in license condition 3.E and delete license conditions that have been fully satisfied including 3.H on AST Modifications, 3.1 on Control Room Habitability, and 3.J on EPU Modifications. For DPR-41, the proposed amendments will revise the title for the PSP in license condition 3.E and delete license conditions that have been fully satisfied including 3.H on Boraflex Remedy, 3.1.1 & 3.1.3 on AST Modifications, 3.J on Control Room Habitability, and 3.K on EPU Modifications. Note that license condition 3.1.2 regarding the NaTB baskets for Unit 4 will be deleted via a supplement to this submittal once the baskets have been loaded with the buffering agent.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 22 of 43 Enclosure 7.0 No Significant Hazards Determination The Commission has provided standards in 10 CFR 50.92(c) for determining whether a significant hazards consideration exists. A proposed amendment to an operating license for a facility involves no significant hazard if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.

The proposed license amendments to Renewed Facility Operating Licenses DPR-31 for Turkey Point Unit 3 and DPR-41 for Turkey Point Unit 4 will revise the Technical Specifications to remove the provisions for crediting of burnable absorber other than IFBA rods for storage of spent fuel assemblies in the spent fuel pool racks in TS Table 5.5-1, Table 5.5-3, and in Figure 5.5-1. The proposed license amendments will also delete license conditions 3.L and 3.M in DPR-31 and DPR-41, respectively, which were established to prohibit the crediting of any burnable absorber other than IFBA rods for storage of fuel assemblies in the Region I spent fuel racks [Reference 4] until the provisions in TS Table 5.5-1, Table 5.5-3, and Figure 5.5-1 were removed. The proposed amendments will also delete license condition 3.H for Unit 4 associated with implementation of the Amendment No. 229 (aka "Boraflex Remedy") as it is no longer required.

Additionally, several inadvertent errors identified in the TS that require correction including TS Figure 3.1-2 to address over-compensation for instrument uncertainty in the boric acid tank minimum volume curve for two unit operation as it was added twice, TS Surveillance Requirement (SR) 4.7.5.c. I in which the acceptance criterion for the DOP test was incorrectly stated as 99% rather than 99.95%, SR 4.7.5.d.2 & 4.7.5.g to which the applicable footnote regarding the compensatory filtration unit was inadvertently omitted, and TS 5.5.1.3 in which conditional verbiage is deleted to be consistent with a previously approved TS change to TS 5.5.1.1 .f.. The correction of the acceptance criteria for the DOP test assures test results support the 99% particulate filter efficiency assumed in the dose analyses. The annotation of the footnote to the latter two SRs assures that the compensatory filtration unit will meet the same surveillance requirements as those for the normal filter train.

For DPR-3 1, the proposed amendments will revise the title for the Physical Security Plan (PSP) in license condition 3.E and delete license conditions that have been fully satisfied including 3.H on AST Modifications, 3.1 on Control Room Habitability, and 3.J on EPU Modifications. For DPR-41, the proposed amendments will revise the title for the PSP in license condition 3.E and delete license conditions that have been fully satisfied including 3.H on Boraflex Remedy, 3.1.1 & 3.1.3 on AST Modifications, 3.J on Control Room Habitability, and 3.K on EPU Modifications. Note that license condition 3.1.2 regarding the NaTB baskets for Unit 4 will be deleted via a supplement to this submittal once the baskets have been loaded with the buffering agent.

FPL has reviewed this proposed license amendment for FPL's Turkey Point Units 3 and 4 and determined that its adoption would not involve a significant hazards consideration.

The bases for this determination are:

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 23 of 43 Enclosure The proposed amendment does not involve a significant hazards consideration for the following reasons:

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

No. The proposed amendments do not change or modify the fuel, fuel handling processes, fuel storage racks, number of fuel assemblies that may be stored in the spent fuel pool (SFP), decay heat generation rate, or the spent fuel pool cooling and cleanup system. The proposed amendments only limit crediting of burnable absorbers in the spent fuel pool to Integrated Fuel Burnable Absorber (IFBA) rods that were specifically addressed in the currently approved criticality analysis (WCAP- 17094-P, Revision 3)

[Reference 14]. The removal of the phrase "or an equivalent amount of another burnable absorber" eliminates the possibility of crediting a burnable absorber other than IFBA for storage of spent fuel assemblies in the spent fuel pool without prior NRC approval. The deletion of the license condition associated with the Boraflex Remedy is editorial as it is no longer applicable. The proposed amendments do not affect the ability of the BAST to perform its function or the ability of the CREVS to perform its function. These latter proposed TS changes correct inadvertent errors and are consistent with the stated intent of original license submittals or delete license conditions that have been fully satisfied.

The proposed amendments do not cause any physical change to the existing spent fuel storage configuration or fuel makeup. The proposed amendments do not affect any precursors to any accident previously evaluated or do not affect any known mitigation equipment or strategies.

Therefore, the proposed changes do not involve a significant increase in the probability or consequences of an accident previously evaluated.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

No. The proposed amendments do not change or modify the fuel, fuel handling processes, fuel racks, number of fuel assemblies that may be stored in the pool, decay heat generation rate, or the spent fuel pool cooling and cleanup system. The proposed amendments do not result in any changes to spent fuel or to fuel storage configurations.

The removal of the phrase "or an equivalent amount of another burnable absorber" eliminates the possibility of crediting a burnable absorber other than IFBA for storage of spent fuel assemblies in the spent fuel pool without prior NRC approval. The proposed amendments do not affect the ability of the BAST to perform its function or the ability of the CREVS to perform its function. These latter proposed TS changes correct inadvertent errors and are consistent with the stated intent of the original license submittals, delete license conditions that are no longer applicable or have been fully satisfied.

Therefore, the proposed changes do not create the possibility of a new or different kind of accident from any accident previously evaluated.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 24 of 43 Enclosure

3. Does the proposed amendment involve a significant reduction in the margin of safety?

No. The proposed amendments do not change or modify the fuel, fuel handling processes, fuel racks, number of fuel assemblies that may be stored in the pool, decay heat generation rate, or the spent fuel pool cooling and cleanup system. Therefore, the proposed amendments have no impact to the existing margin of safety for subcriticality required by 10 CFR 50.68 (b)(4). The other proposed TS changes correct inadvertent errors and are consistent with the stated intent of the original license submittals or delete license conditions that are no longer applicable or have been fully satisfied.

Therefore, the proposed amendments do not involve a significant reduction in the margin of safety, Based on the above discussion, FPL has determined that the proposed change does not involve a significant hazards consideration.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 25 of 43 Enclosure 8.0 Environmental Consideration 10 CFR 51.22(c)(9) provides criteria for and identification of licensing and regulatory actions eligible for categorical exclusion from performing an environmental assessment.

A proposed amendment of an operating license for a facility requires no environmental assessment, if the operation of the facility in accordance with the proposed amendment does not: (1) involve a significant hazards consideration, (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, and (3) result in a significant increase in individual or cumulative occupational radiation exposure. FPL has reviewed this LAR and determined that the proposed amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of this amendment. The basis for this determination follows.

Basis This change meets the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9) for the following reasons:

1. As demonstrated in the 10 CFR 50.92 evaluation, the proposed amendment does not involve a significant hazards consideration.
2. The proposed amendment does not result in a significant change in the types or increase in the amounts of any effluents that may be released offsite. The proposed amendments do not change or modifythe fuel, fuel handling processes, fuel racks, number of fuel assemblies that may be stored in the pool, decay heat generation rate, or the spent fuel pool cooling and cleanup system. The proposed amendments do not change the design or operation of the spent fuel or spent fuel storage system. The proposed amendments do not affect the ability of the BAST to perform its function or the ability of the CREVS to perform its function. The proposed amendments do not directly or indirectly affect effluent discharges.
3. The proposed amendment does not result in a significant increase in individual or cumulative occupational radiation exposure. The proposed amendments do not change or modify the fuel, fuel handling processes, fuel racks, number of fuel assemblies that may be stored in the pool, decay heat generation rate, or the spent fuel pool cooling and cleanup system. The proposed amendments do not change the design or operation of the spent fuel or spent fuel storage system. The proposed amendments do not affect the ability of the BAST to perform its function or the ability of the CREVS to perform its function. The proposed amendments do not directly or indirectly affect the radiological source terms.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 26 of 43 Enclosure 9.0 Summary of Results The proposed amendments include TS changes to selected notes in Tables 5.5-1 and 5.5-3 and in Figure 5.5-1 to remove the provision for crediting of burnable absorber other than IFBA rods for the storage of spent fuel assemblies in the spent fuel pool racks. Accordingly, the proposed amendments include deletion of license conditions 3.L in DPR-31 and 3.M in DPR-41 with the approval of these TS changes. The proposed amendments will also delete license condition 3.H for Unit 4 associated with implementation of the Amendment No. 229 (aka "Boraflex Remedy") as it is no longer required.

Additionally, several inadvertent errors identified in the TS that require correction including TS Figure 3.1-2 to address over-compensation for instrument uncertainty in the boric acid tank minimum volume curve for two unit operation as it was added twice, TS Surveillance Requirement (SR) 4.7.5.c. 1 in which the acceptance criterion for the DOP test was incorrectly stated as 99% rather than 99.95%, SR 4.7.5.d.2 & 4.7.5.g to which the applicable footnote regarding the compensatory filtration unit was inadvertently omitted, and TS 5.5.1.3 in which conditional verbiage is deleted to be consistent with a previously approved TS change to TS 5.5.1.1.f. The correction of the acceptance criteria for the DOP test assures test results support the 99% particulate filter efficiency assumed in the dose analyses. The annotation of the footnote to the latter two SRs assures that the compensatory filtration unit will meet the same surveillance requirements as those for the normal filter train.

For DPR-3 1, the proposed amendments will revise the title for the Physical Security Plan (PSP) in license condition 3.E and delete license conditions that have been fully satisfied including 3.H on AST Modifications, 3.1 on Control Room Habitability, and 3.J on EPU Modifications. For DPR-41, the proposed amendments will revise the title for the PSP in license condition 3.E and delete license conditions that have been fully satisfied including 3.H on Boraflex Remedy, 3.1.1 & 3.1.3 on AST Modifications, 3.J on Control Room Habitability, and 3.K on EPU Modifications. Note that license condition 3.1.2 regarding the NaTB baskets for Unit 4 will be deleted via a supplement to this submittal once the baskets have been loaded with the buffering agent.

10.0 References

1. J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Fuel Criticality Analysis (TAC Nos. ME4470 and ME4471)," Accession No. MLl 1216A057, October 31, 2011.
2. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2012-050), "Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and New Fuel Storage Requirements," Accession No. ML12048A068, February 15, 2012.
3. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2012-08 1), "Response to NRC Reactor Systems Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Spent Fuel Pool Storage Requirements," Accession No. ML12058A126, February 23, 2012.
4. J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Extended Power Uprate (TAC Nos. ME4907 and ME4908),"

Accession No. MLl 1293A365, June 15, 2012.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 27 of 43 Enclosure

5. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2011-386), "License Amendment Request No. 207 Fuel Storage Criticality Analysis Supplement 2, Accession No. ML11259A007, September 14, 2011.
6. J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Alternative Source Term (TAC Nos. ME 1624 and ME1625)," Accession No. ML110800666, June 23, 2011.
7. J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - "Issuance of Amendments Regarding Control Room Habitability Technical Specification Task Force (TSTF)-448 (TAC Nos. ME4277 and ME4278)," Accession No. ML12067A176, March 30, 2012.
8. Regulatory Guide 1.52, Revision 3, "Design, Inspection, and Testing Criteria for Air Filtration and Adsorption Units of Post-Accident Engineered-Safety-Feature Atmosphere Cleanup Systems in Light-Water-Cooled Nuclear Power Plants,"

June 2001.

9. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2011-560), "Supplement 3 to Extended Power Uprate License Amendment Request No. 205 Regarding Proposed Technical Specification Changes," Accession No. ML11362A383, January 10, 2012.
10. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2010-137), "Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196," Accession No. ML101800220, June 25, 2010.
11. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2011-380), "License Amendment Request (LAR 194) Control Room Habitability TSTF-448 - Responses to NRC Questions and LAR 194 Changes (TAC Nos. ME0004 and ME0005),"

Accession No. ML 1304A1 84, October 27, 2011.

12. M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-197), "Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST)

License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System (CREVS)

(TAC Nos. ME1624 and ME1625), Accession No. ML102630160, September 15, 2010.

13. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2011-032), "License Amendment Request No. 207 Supplement 1 to Fuel Storage Criticality Analysis,"

Accession No. ML110560335, February 22, 2011.

14. WCAP-17094-P, Revision 3, Turkey Point Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis," February 2011.
15. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2012-305), "Revision 15 to the Physical Security Plan," August 3, 2012.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 28 of 43 Enclosure

16. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2011-277),

"Confirmatory Dose Assessment for Control Room Emergency Ventilation System Air Intake Modification to Satisfy Operating License Conditions 3.H. 1 for DPR-31 and 3.1.1 for DPR-41, Accession No. ML11228A011, August 11, 2011.

17. M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2012-143),

"Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Spent Fuel Pool Cooling System Structural Design (Unit 3)," June 19, 2012.

18. M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2012-179), "Response to NRC Request for Additional Information Regarding Extended Power Uprate and Unit 3 License Condition 3.J. 1 on Spent Fuel Pool Cooling System Heat Exchanger Design,"

Accession No. ML12199A010, July 13, 2012.

19. Farideh E. Saba (NRC) to M. Nazar (FPL), Turkey Point Nuclear Generating Unit No. 3 - License Condition 3.J. 1, "Extended Power Uprate Modifications," Regarding Spent Fuel Pool Supplemental Heat Exchangers (TAC No. ME9003), Accession No. ML12214A303, August 2, 2012.
20. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2010-173), "BADGER Test Results - License Condition 3..H(b)," Accession No. ML102250419, August 5, 2010.
21. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2010-169), License Amendment Request No. 207 Fuel Storage Criticality Analysis, Accession No. ML102220022, August 5, 2010.
22. M. Kiley (FPL) to U. S. Nuclear Regulatory Commission (L-2012-318),

"Supplemental Response to NRC Request for Additional Information Regarding Extended Power Uprate Amendment 245 and License Condition 3.K. 1 on Spent Fuel Pool Cooling System Supplemental Heat Exchanger Structural Design," Accession No. ML12227A684, August 10, 2012.

23. J. Paige (NRC) to M. Nazar (FPL), Turkey Point Unit 4 - Issuance of Amendment Regarding Implementation Date Change for License Amendment 229 (TAC No.

ME2161), Accession No. ML092890635, November 13, 2009.

24. Farideh E. Saba (NRC) to M. Nazar (FPL), Turkey Point Nuclear Generating Unit No. 4 - License Condition 3.K. 1, "Extended Power Uprate Modifications,"

Regarding Spent Fuel Pool Supplemental Heat Exchangers (TAC No. ME9246),

Accession No. ML12248A082, September 13, 2012.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 29 of 43 Enclosure FIGURE 3.1-2 BORICACID TANK MINIMUM VOLUME (1)

MODES 1, 2, 3 AND 4 22000 20000 18000 z

0

-J S16000 w

0 14000 12000 10000 8000 -

3.00 3.25 3.50 3.75 4.00 (5245ppm) (5682 ppm) (6119 ppm) (6556 ppm) (6993 pIpm)

BAT INVENTORY CONCENTRATION (WEIGHT %)

MINIMUM ACCEPTABLE TWO UNIT OPERATION

- MINIMUM ACCEPTABLE ONE UNIT OPERATION (2)

Notes:

(1) Combined volume of all availableboric acid tanks assuming RWST boron concentration between 2400 ppm and 2600 ppm.

(2) Includes 2900 gallonsfor the shutdown unit.

TURKEY POINT - UNITS 3 & 4 3/4 1-294a AMENDMENT NOS. 249 AND 245

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 30 of 43 Enclosure SURVEILLANC.E- E9RjEM E i- 4.. .. . . . . .

g9.9i5%

1) Verifying that the air cleanup system satisfies the i:n-place penetra ion and by s leaikage testfng acceptance criteria of greater than or equal to 90-%DOP and halogenated hydrocarbon removal at a system flow rate of 1000 cfrn +/-10%*.
2) Verifying, within 31 days after removal, that a laboratory analysis of a representative carbon sample obtained In accordance with Regulatory Posilion C.6.b of Regulatory Guide 1.52, Revision 2. March 1978, and analyzed per ASTM D3803 - 1989 at 300C and 95% relative humidity, meets the methyl Iodide penetration criteria of less than 2,5% or the charcoal be replaced with charcoal that meets or exceeds 'the stated performance requirement"', and
3) Verlying by a visual inspection the absence of foreign materials and gasket deterioration-,

d.1 At least once per 12 months by verifying that the pressure drop across the combined HEPA fifters and charcoal adsorber banks is less than 6 inches Water Gauge while operating the system at a.

flow rate of 1000 cfmn 10%t"%

d.2 On a staggered test basis every 36 months, test the supply fans (tr,ain A and B) and measure CRE pressure relative to external areas adjacent to the CRE boundary, 99 t

e. At least once per 18 months by verifying that on a Containment Phase "A Isolatfon test signal the system automatically switches into the recirculation mode of operation, t At least once per 18 months by verifying operability of the kftchen and toilet area exhaust dampers, and L i
g. By performing required CRE unfiltered air inleakage testing in accordance with the Control Room Envelope Habitability Program, FED

-As the migigation actions of TS 3.7.5 Action a.5 may Include the use ai the compensatory filtraton unit, the unit shall meet the surveillance requirements of TS 4375.b, by manual Initiation from outside the control room and TS 4.7.6., -75.o d and g.

TURKEY POWT - UNIýTS 3 &4 314 7-17 AMENrMFNr NOS. 248 MiD 244

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 31 of.43 Enclosure DESIGN EMA'RES IFresh or irradiated fuel ass-emblies in the Region I or Region II racks

/

5,5.1.3 Credlt for bumup and cooling time1* taken In determining acceptable placement locations for spent fuel In the two.-egion spent fuel racks .nle..............

' Wes-..pecified in ersne..o lth if-auo 15.5,4.4- frod, or lrrdlated fue! asseomblies shall be stored Incompliance with the following:

a, Any 2x2 array or Region I storage cells containing fuel shall comply with the storage patterns in Figure 5.5-1 and the requirements of Table 5.5-1 and 5,5-2. as applicable. The reactivity rank of fuel assemblies ti the 2x2 array (rank determined using Table 5,5-3; shtall be equal to or less reactive than that shown For the 2x2 array.

b. Any 2x2 array of Reglon I1storage cells containing fuel shall:

I. Comply with the storage paltems In Figure 5.5.2 and the requirements of Ta be 5.5-1 and 61-2. as applicable. The reactivity rank of fuel assemblies in the 2x2 array (rank determined using Table 5,5-3) shal bo equal to Or less reactive than that shown for the 2x2 array, ii. Have the same directional orientation for Meaamri inserts in a contiguous group of 2x2 arrays where Metam[c Inserts are required, and iii. Comply with the requirements of 5.5.1.3.c for cells adjacent to Region I racks.

c, Any 2x2 array of Region II storage cells Chat Interface with Region I storage cells shag comply with the rules of Figure 56.-3.

d. Any fuel assembly may be replaced with a fuel rod storage basket or non-fuel hardware.
e. Storage of Metamlc Inserts or RCCAs Is acceptable in locallons designated as empty (water-filled) ceils.

5,5.2 The spent fuel storage pit is designed and shalt be maintained to prevent Inadvertent draining of the pool below a level of,6 reet above the fuel assemblies in the storage racks.

CAPAC 5.5.3 The spent fuel storage pool'is designed and shaM be maintained with a storage capacity limited to no more I than 1635 fuel assembles.

TURKEY POINT - UNITS 3 &4 5-6¸ AMENDMENT NOS. 251 AND 247 I

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 32 of 43 Enclosure Table 5.5-1 Blanketed Fuel - Coefficients to Calculate the Minimum Required Fuel Assembly Burnup (Bu) as a Function of Enrichment (En) and Cooling Time (Ct)

See notes 1-6 for use of Table 5.5-1

0) Coeff. Fuel Category U) 1-3 1-4 I1-1 11-2 11-3 11-4 11-5 Al 5-66439153 -14.7363682 -7.74060457 -7.63345029 24.4656526 8-5452608 26.2860949 A2 -7.22610116 11.0284547 5.13978237 10-7798957 -20.3141124 47257395 -18.0738662 A3 2.98646188 -1.80672781 -0.360186309 -2.81231555 6.53101471 2.09078914 5.8330891 A4 -0.287945644 0.119516492 0.0021681285 0.29284474 -0.581826027 -0.188280562 -0.517434342 A5 -0.558098618 0.0620559676 -0.0304713673 0.0795058096 -0.16567492 0.157548739 -0.0614152031 A6 0.476169245 0.0236575787 0.098844889 -0.0676341983 0.243843226 -0.0593584027 0.134626308 A7 -0.117591963 -0.0088144551 -0.0277584786 0.0335130877 -0.0712130368 0.0154678626 -0.0383060399 A8 0.0095165354 0.0008957348 0.0024057185 -0.0040803875 0.0063998706 -0.0014068318 0.0033419846 A9 -47.1782783 -20.2890089 -21.424984 14.6716317 -41.1150 -0.881964768 -12.1780 A10 33.4270029 14.7485847 16.255208 -10.0312224 43.9149156 9.69128392 23.6179517 All -6.11257501 -1.22889103 -1.77941882 5.62580894 -9.6599923 -0.18740168 -4.10815592 A12 0.490064351 0.0807808548 0.127321203 -0.539361868 0.836931842 0.0123398618 0.363908736 Notes:
1. All relevant uncertainties are explicitly included in the criticality analysis. For instance, no additional allowance for bumup uncertainty or enrichment m uncertainty is required. For a fuel assembly to meet the requirements of a Fuel Category, the assembly bumup must exceed the 'minimum burnup' z (GWdIMTU) given by the curve fit for the assembly "cooling time" and "initial enrichment." The specific minimum bumup required for each fuel assembly 0 is calculated from the following equation:

m 3 2 3 2

Bu = (A. + Aj*En + A3 *En + A4 *En3) exp [- (As + Ag*En + A7*En 2 + As*En )-Ct ] + A9 + AIo*En + AII*En + A1 2 *En 0 2. Initial enrichment, En, is the nominal central zone U-235 enrichment. Axial blanket material is not considered when determining enrichment. Any enrichment between 2.0 and 5.0 may be used.

Zi

3. Cooling time, Ct, is in years. Any cooling time between 0 years and 25 years may be used. An assembly with a cooling time greater than 25 years must use 25 years.
4. Gaieqeoy; 1 is irczn unnumea Fuel up,to 1.1't cnrrcfl;mnnt: DELETED

-225

5. Gaieqer; 1 2. lsusn unoum-ea fuel Mat obeys the IlFHA Fe~iuircments in Tablec 5-5 4orcNtan an eaui 'alent amonOUt al another: burnable abserbeF.lf~ --TIDI
6. This Table applies for any blanketed fuel assembly.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 33 of 43 Enclosure Table 5.5-3 Fuel Cateaories Ranked by Reactivity See notes I-S for use of Table 5.5-3 I-1 High Reactivity 1-2 Region I 1-3 1-4 Low Reactivity Il-1 High Reactivity 111-2 Region, II 11-3 11-4

]11-5 Low Reactivity Notes:

1. Fuel Category is ranked by decreasing order of reactivity wilhoul regard for any reactiviy-reducing mechanisms, ,e.g., Category 1-2 is less reactive than Category I-f, etc. The mlore reactive fuel categories require compensatory measures to be placed in Regions I and I1of the SFP, e-g. ,use of water fied cells, Metamic inserts, ,or full length RCCAs.

2- Any higher numbered fuel category can be used in place of a lower numbered fuel category from the same Region.

3. Category I-1 is fresh unburned fuel up to 5.0 wt% U-235 enrichment.
4. Category 1-2 is fresh unburned fuel that obeys the IFBA requirements of Table 5.5-4 o,-eonteine-en cquivolent zn-.unt e4 arnetlzr burnablc abaziter.
5. All Categories except 8-1 and 1-2 are determined from Tables 5-5-1 and 5.5-2.

Table 5.5-4 IFB*A Recuirements for Fuel Cateuorv I-2

...... Reureet for.....l...............

Nominal Enrichment Minimum Required Number (wto U-235), of IF BA Pins Enr, <_4.3 0 4.3 < En r. S4._-4 32 4.4 < En r. :5 4.7 64 4.7 < Enr.5_< 5.0 80 TURKEY POINT - UNITS 3 & 4 5-13 AMENDMENT NOS. 246 AND 242

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 34 of 43 Enclosure FIGURE 5.5-1 ALLOWABLE REGION I STORAGE ARRAYS See notes 1-8 for use of Figure 5.5-1 DEFINITION ILLUSTRATION Array I-A Checkerboard pattern of Category I-I assemblies 1-1 X and empty (water-illed) cels.

X I-1 Array 1-B Category 1-4 assembly in every cell. 1-4 1-4 1-4 1-4 Array I-C Combination of Category 1-2 and 1-4 assemblies. Each Category 1-2 assembly shafl contain a full length RCCA.

1-4 1,-4 1-1141 Array I-D Category 1-3 assembly in every cel. One of every four 1-3 1-3 assembles contain a full length RCCA.

1-3 Notes:

1. In all arrays, an assembly of lower reactivity can replace an assembly of higher reactivity.
2. Category 1-1 is fresh unburned fuel up to 5.0 wt% U-235 enrichment.
3. Category 1-2 is tresh unburned fuel that obeys the IFBA requirements in Table 5.5-4 o.r.ontain.-ark
4. Categories 1-3 and 1-4 are determined from Tables 5.5-1 and 5.5-2.
5. Shaded cells indicate that the fuel assembly contains a full length RCCA.
6. X indicates an empty (water-filled) cell.
7. Attributes for each 2x2 array are as stated in the definition. Diagram is for illustrative purposes only.
8. An empty (water-filled) cell may be substituted for any fuel containing cell in all storage arrays.

TURKEY POINT - UNITS 3 & 4 5-14 AMENDMENT NOS. 246 AND 242

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 35 of 43 Enclosure 4

0. Fire Protection FPL shall implement and maintain in effect 11provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report (UFSAR) for Turkey Point Units 3 and 4 and as approved in the Safety Evaluation Report (SER) dated March 21, 1979 and supplemented by NRC letters dated April 3, 19,810, July 9,. 1.980, December 8, 1980, January26, 1981, May 10. 1982., March 2,7, 1984. April 16, 1984, August 12, 1987, and by Safety Evaluations dated February 25, 1'994, February 24, 1998, October 8, 1998, December 22, 1998, May 4, 1999. and May 5, 1999, subject to the following provision:

The licensee may make changes to the approved Fire Protection Program without prior approval of the Commissiononly if those changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of afire.

E. The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and: qualification, and safeguards contingency plans including amendments made pursuant to provision of the, Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10,CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 7321, is entitled: "Florida PwcrF and Light

& FPFL= E=ncrgy Soabroo)6k Physical Gecuit' Plan, Trnininq and Qualification Plan The licensee shall fully implement and maintain in effect all provisions of the Commission- pproved ,cyber security plan (CSP), including changes made pursuant to t e authority of 10 CFR 50.90 and 10 CFR 50-54(p). The Turkey

,Point Nuclea Generating Station CSP was approved by License Amendment No- 24.5-F- 1. The licen ee shall restrictthe combined numberof fuel assemblies loaded in the existi g spent fuel pool storage racks and cask pit rack to no more than the capa ity of the spent fuel pool storage racks- This condition applies at all times, xcepl during activities associated with a reactor core offloadlre oad refueling condition. This restriction will ensure the capability to unload nd remove the cask pit rack when cask loading operations are n ecessar

2. The licen ee shall establish two hold points within the rack installation procedur to ensure proper orientation of the cask rack in each unit's spent fuel pool. erification of proper cask pit rack orientation will be implemented by an aut rized Quality Control inspector during installation of the racks to ensure co sistency with associated spent fuei pool criticality analysis assumptio s. "Florida Power and Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Pro~gram -

Revision 15' submitted by letter dated Aug1ust 3, 2012.

Renewed License No,- DPR-31 Amendment No- 245

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 36 of 43 Enclosure 5

G, Mitigation Strategyv License Condition

Develop anrmaiRntainr strategies for addressing large fires and explosions and that include Lhe Iollowing k~ey areas:

(a) Fire khniing rsponsei strategy wih [Ie folowingi elements:

'I. Pie-defiPer*coordinatedfire resporise'strategy and guidanc:

2. Asseessrnet-ofimtual aid fire fightiipgoassejs:
3. Designated staginfg, areas for equipmenit.and
  • a*.terials'.

4., Command artd control

5. Training of resonse personnel (b) Operations lo mltigafeiuel damnage~conslderlng the foo~llng 1ýProticiion~and use of personnel assets 2.Cornrnrr~cations-3ý Mtnlmlzlng lire Spread.
4. Proceduresfor implemenling Integrated fire response strategy

.. Identification of ;readi1y-ai.alabloepre-stagedI equipment TrainngS6 ion integrated fire response strategy

7. Spent fuel pool rriligation mheasures (c0. Actions,-to rmnimize release to Indude consideration of:

'. Water. spray scrubbing 2- Doseitoenshi responders VFI'LY,4 F[..Ii_t "hce 6 nime ACST.~ mt3,Ated Ltaksz arJzslated du'et 1ill &o!

8tFL de-klie te kei Omieel~d.I:t% &Mwerfil. eelA

.46snio ns. and wll zeesr dliimu ibidsing~ en t YMl ia~hn diverac wid ftetonfor i9FPeoa

-e-. _.,tpimre d v wv _PLptm at ;¶;uQp.dnim#6h ~

eccr~aewir t~ p~m eýgn mrafftcllon, proAmers- ensre WIQ le'-G reoAtEd-6nS1,4 diborFb-il-rwdtolh-N6acn mtwl 0t0'irmai t cc.I'WARR 'OR Oati#OF the ctei.

d~ilmea t0 FR SO Appcn fcto rs(XJQ-vaIluesM 2:

conlaln-ig-NaTfloate~d-inrthe-oan1menktta- -sement-to-tnsitaiiT-Ro dtrnin t e .s p . -. ...t*. _ f iý_Iw I - a_. a- LO. , .

Renewed License No. DPR-31 A."endnien No. : 244

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 37 of 43 Enclosure PuntR Wrlcr.e By tz~ 1-i:znfig pI ihi AST Fnethbdolg6

In: ocordpn::oc:

m~ m'ItwTjrfi~y Peint, willbc dc5,qfzd

wilh~it::o C/O N ln Table GA 1 of the TuOrlýii on FA ilntb&c tdu.Aetth S6i rng: irt*oazd by a rnlxlrnum hypothcale- oarthttc. FPI. Lmhl3 ercti" up~on-fm plementetian -orAmend~menl-No,.24&naopli~ng-WS-T-F-448-ReAtsloný-1the

'.""...: .;;2 .... ** ;.+e~ .: *.,*.:*,.*

. i* *;-,* ..*.a ^ ,,y.*..._.....e~,.:.* ' d,,""

t,c of.,Th-c S FneefAalequiremenFSR$-+&g awrin aceedsoc#AtJoyT31,209o? thpdaeelfiteet

i ~[::::::if:;0rniWlo1-f- nn nnro!-

(bf$&&4ie 4frths-sssesmlineen.4-of-Gep phdabs6ifabiety t ro frm ih h 3t2005 ihn dzin a? [ha rnnolrmcnitd zby 9Fs-bEqired-by-Seehlye0 pýP4 A A:ýt :E6ýi pq bA cp :29flcd IlhrIk 414hqt4cr -Af2h yc44t, pluAth&QaE Thea farot pafeflamanc Ofticioi the MOMt rcocnt 3UOC3$MpCar motsufrton icat, or w-%hin 138B day f

... . ............  :.:.z:r.......l.

.... ....... .... . .. ....... .... . .. . . 4.  :. . -..

rneznucri-9,.D C .nesrEVl4 GYý'Oun klbec tH,vvqpmi p TuncrtrdenaIs'RG

k. - jt-M.,

. . . t :r:..-  ; ..

.......  :.. f *r....:..

  • ::;::F::*14,,, 0k v*., t nirL.. +4 'i r .,. L ¶JZAO n s t w,

,+C.m',+:*::::  :,L:

..'s':p".:e"

-o_ ' .... - eeo"ftfl _m'*** '_atoe-F"-eo'nS.:' -*eiIWI2*"-' ":'ne'vide"-___.--Sumr, " . ..... 'r ... ::..fh...

  • .. :::;.turaI :.q*,+,,o.F:l
  • t k:*Y. r.rc.s'..1t&

1 . .h`` pipip...ppots*:.

v !** *"",r.su p *s..M..a',l he .:
e:i:..:c..:::h..._r.it er" rts an
upp i, t lieo*'rtci

,d ;'*::*:;-i."Kr 1, c :. th th"

.":-!*] , , !n- , ,,',"U'h::

  • ,**. ,h.o.r,gex-Iforth* appwprota..oad :rnniblr*+'*`'afvno 4h o*v++np!

- IFJM4..4 mopn..L,.;'. *.

wi..th Iegf-0 VbOIUZthe4 .iL1Ut.i4lotng We a VeA 0Jth the~ 0 peritfl Rs~;wo4 LI;onao Nc, Urn 31 Amendment Na. 249

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 38 of 43 Enclosure 7

Ey I "PAD 4.-0 TOD has-been speciflc.~lljapproved (at use fo~r t Thrkejt Point.

ic~en'sirinbsq analyfs es.RUpnNR~ pprbval of a re'&lodd ,onedic vereloiw

,of PAD Ihat aob~tints for. Thermal Cornduclivity Degradation (COD), FPL v/Iu1 six months.' :withln

a. Demonstrate ihat.PAD 4.0 TOO j1emnains conservativeJy bounding In

............ .+..... - , , : :............. llicensinig bas4s .nelyses

.. ........ . ....i:i:: .:twhooncmpared

_[i to the newqugeneically

- pproveod versipnof. PAC w17TC, or~

Provilde a sc~hedule for fthe re-analysis using the now genefica~lli ap.Wp.oved verlon of PADVwTOD for any of the affected licensing basis analyses.

4=; clknccoblle pIn h R~ga pnfe cc 4 %sronowedi icon so iseffectie as of the date of issuance, and shaNi expiretatflmidnight Juy1% 2032..

FOR THE NUCLEAR 'REGULATORY COiýMMISSION Signed iby Samuel J; Collins, Director Office of Nuclear Reiactor Regulation.

Attachmnentsv Appapdlx, A.- Techhil~ai Spacoiflca liens for Unit 3

.AppendixB - Environmental Ptdiectron Plan Date OFIss1Saiico: Juno 6, 2002 Renewd LUoense No. DPQR,31 Amendment No. :249

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 39 of 43 Enclosure 4

D. Fire Protection FPL shall implement and maintain in, effect afl provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report (UFSAR) for Turkey Point Units 3 and 4 and as approved in the Safety Evaluation Report (SER) dated March 21, 1979 and supplemented by NRC letters dated April 3, 1980, July 9, 1980, December 8, 1980, January 26, 1981.

May 10, 1982, March 27, 1984, April 1.6, 1984, August 12,1987, and. by Safety Evaluations dated February.25, 1994, February 24, 1998, October 8, 1998,

]December 22, 1998, May 4, 1999. and May 5, 1999, subject to the following provision:

The licensee may make changes to the approved Fire Protection Program without prior approval of the Commission only ifthose changes would not adversely affect the ability to achieve and maintain safe shutdown in the event of a fire.

E. The licensee shall fully implement -and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provision of the Miscellaneous Amendments and Search Requirements revisions to 10CFR 73:55 (51: FR 27817 and 27822) and to the authorityof 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73-21, is entitled: "Flrida P"o..r and Ligh,

&.FRI= Energy Scabrok PhyeAlal ceurity Plan, TrainAin and Qualification Plan and Safeguards Contingency Plan Rovision.3, "submitted by letter datd May 16.2006 The licensee shall fully impleme t and maintain in effect all provisions of the Commission-approved cyber security plan (CSP), including changes made pursuant to the authority of 10tFR 50.90 and 10 CFR 50.54(p). The Turkey Point Nuclear Generating Sta ion CSP was approved by License Amendment No. 241.

F. 11. The licensee shall resti:cl the combined number of fuel assemblies loaded in the existing spent fu pool storage racks and cask pit rack to no more than the capacity o1 the sgent fuel pool storage racks. This condition applies at all times, except d'urng activities associated with a reactor core offload/reload refu.ling condition. This restriction will ensure the capabirity to unload and ren ve the cask pit rack when cask loading operations are necessary.

2. The licensee s all establish two hold points within the rack installation procedure to IAsure proper orientation of the cask rack in each unit's spent fuel pool. Ve lfication of proper cask pit rack orientation will be implemented by an autho Ped Qua~lity Control inspector during instalEation of the racks to ensure con~isency with associated spent fuel pool'criticality analysis assumptiorts.

"Florida Power and Light Turkey Point Nuclear Plant Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Renewed License- No. DPR-41 Installation Security Program - Revision 15," submitted by Amendment No. 241 letter dated August 3. 2012.

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 40 of 43 Enclosure 5

G. Mhioa~tlon :Stratec !L:censeCondition Develop and maintain strategies for addressing large fires and explosions and that include the followling key areas:

(a) Fire fighting response strategy with, the following elements:

1. Pre-defined coordinated fire response strategy and guidance
2. Assessment of mutual aid fire fighting assets 3, Designated staging areas for equipment and' materials
4. Command and control:
5. Training of response personnel (b) Operations to mitigate fuel damage -considering the following
1. Protection and use of personnel assets
2. Communications
3. Minimizing, fire spread
4. Procedures for implementing integrated fire response strategy
5. Identification of readily-available pre-staged equipment Training on integrated fire response strategy
7. Spent fuel pool mitigation measures (c) Actions to minimize release to include consideration of:
1. Water spray scrubbing!

2, Dose to onsite responders

.H. FPL= will implemerithe fllawlng moosurcoS no part oft.:e roguest for a thong: in the implementatlzn date for Amendmcn~t 229 for Unit 4- These :moasurc: will rompiln in plee: until Amendme~nt No. 229 'a lmpemented or until the NRC cpprovec !he lsens: emcndmfnt~ roquest diacussed in [Hem (b)belew:but not laere thBan nDeletedc Februjary 28, :2011.

(a}ý "11a Wurni t 4*Spent, Ful Ro ol (9F*FP) booro n;,Go o

.c- ntratoflln- M-4;11bI,*bIncro-ea-s ad.to and moaintsined no icco then 2100 ppmA. This menoure wil be imfiplemfented 4ithin,72 hour: of installing YletranofOr tabe gate sloalting th~e SFP fromR the re..t.r.eaily during the curen.t Un..4.utag... refueling (b4 F=PL will complete Booraf lox pandl aur-oieilamnca using EPRI BADGEFR neu tron atnuation methodology in tIheUnit.FPno Itrt. no IM than May 30,2010. The rept doe*nA.e,,n the r.e.Ultof the EPRI BADGER lttiJng campaign end the lHcense amendment roqucot updating th: SFPR Ileensng badis will be-submilled to the'NRC no lBtor than 90 dey: after eompletioneio he BAIDG FR 1eaU r4, (c4 FPL will;ncrease the u-rrent [..'a!...'n. J burn-p requirements for SFP Region. . storage by 10% and will configurate SPe RFRto-comply with the rouiomntol Or inoiFt an RCCA in any fuol assembly not in eomplinnec with thealreqirments. These mneasurco wvill be completed by Foebruor- 28, 2010, Renewed License No. DPR-41

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 41 of 43 Enclosure a

{4} Fri %W9 n mo'an .ot l ft e-mbioas itt UnitIANr4 SFA1 cobtse*.nt*i*

th.eso~mssful r mpiaelon of cttup Pfl tostc fR Un it 4 Cycle 25.

I.Altemsf1im Source Term Modifications:

4-. FPL vAIt rofocot the CR V0011ot1110 %rtomR OmRForgny air k~inttOc prior to imp ineu tati*. a-AST.4eoomia ted4,taes.ar'd-asodatedductvwk-wUi be-designed to colcmki CIIIflO, protecuted from anylonmonbil oFFoct. and Y4O MeeI4h rquiroments of It) CPR 50 Ap"pend A,40CC 19. The nowv intakoci be located r-es 1.1l11 the 9mound "I 9i atnding ou from thia southes t srin

,"odheas~to nwere-o- e.rniu;*l.ituding :-a nwg-wiJ.lthiih{*Neroe*wnd socciom Ifr patooadcl ca~dntarr~telnanb, FPL. will perkfompest fmciladileUo tOctin Wn accordance Yit; the plant decigni Rncltlxion prcc)Fodwmrro10 nsum the relo,,c*"*ate In.takes. In .add.u.lo,, FPL ,willpr.-*ds* 11 N.,.,MRC s conrf,,,,,mntor-AppendA 0.00,4G 8A

-w~ll ~be-met"hoecntimolorra.ssesm nen e~,wilolfoliowh methodolog in AmendIe*wt 2240 (the sltnamte soure 1m amrerldmen indudtog~&meothods-sosd4orthe-eflatishme'fl of4ho-ahnospeic dispersion-FactoisAXfO-Musýzs) 2, FPI will Install Ion (two large ,and eigh small) stainless steel wire mnesh baskets containing NaTS located Inthe onltainment basementto maintain pH during the sump recirculation phase following a Design Basis LOCk 4-. Th: CREVC cOmSPeAGGctcY QIJFnwOn unitl. whiah 't WASinstalrited by, FPL no pad, of the ART methodolorry Impleomentatlo n a'Ti ikr: Polint witl be designedhin accondancc with t1he Oasis rSWu'turoc, yt mW arid uipmemt Dealgn Requirernenls-da *ied-InApper. *AMoýe-T4Aey*-P-i-UPSARA~uh r he cmpesonefy Afihinien unit will be dcuinsd so th-al the efrote limits foud in

-TabM-A-of-4-ol-Tuh ey4PnJ FSARA-wiot-beexoeedodda-e4he4oadiips imposed by a nuailimuni hypoW~otk94 oartZqwke. FP11L shalt eanaci Met the design.of-the.compernatory-filtmatlon.unit-salist fs.the-.res.Ilimits-pior-to{4he implemontation of the puvoead ART metlhodology al Turkey Poin J. t..nimnI Roam.. klt.,k4It DELETED]

Upon-implsment idoF-Ammnd men larlNae-"

de*Trmna~a~ato 2 ai 'neop CE )-unf*lre d-atlr-lnlektHlq rd by~~e1Rh nReq ufremenl4SRY4.7,,g wa-coranc*th.TcnaSpe .caon B . .

(a) i~i~ nrctvorromnnvo or 11¶ iJ.~a. inac~Ixosncawnn ~peancmmn ,.

O*AftteAWeflalFbe-wlfln-lfle4peaflsOt4OQusnwOIAFveaIsrPlu

,o, B-U18-U4flOqlUl Renewed License No, DPR41 Amendment No. 245

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 42 of 43 Enclosure 7

ollowance eFCR 4O.0.2 as rnamured (frmJuy 314 200G. S1he date cf the mcm rOcOnt Wavoc 906 MO.'

(0 Th4e Amr! pesrfrnonceof: the pelzdi; osaasemnon 0 CRC hablitab8it~,

Spesfloation flJ.4.e.(lI). Mhall he ith Ina year, plus 1ho 0 month al"Ot~nne of tOA SR aomonud from July 31.200D, the date of tlho most Fawnt itrata

The OFir! pcOFMORma of t1hpo'idedo moaeurmonl or ORE procure.

Spofeadton 6.BA.k4d, shall be within 36 mon~ts on a STAGGERED TEST BASIS, plus the 138 days llWed by .02

? an moasurod Wrmn 1h: date of fth most rcocnt succcasful prcscsnra me esurcment test, ofr wMtl S as liconrmc amonimoni Impicmonkatiaen Ii not porefomcd prc-Aouzly.

TcMOS rWCSW ~aweerys M4

k xi 431!,!200 wag tnn.'cOnf& in Mt1horrr a Mewvred9 fin COMVror iom
ffetfkft: Me acCePAon: crjhgrjpLis *L In coueqgucnces to Metic cn! moom 3pc1-Qors wzpecfrmenn4 andMe rsuiewace te-Mcontedihreenlkw/aGRrio-ascene~oin- GOrMeWW-CRe 1,47ieglr a wli IC E..*--.iodi F--.mr Ww i t 61li.,ll'.*l^ IDELETEDI

..hall pwoAdc conflrmodcn to fto WlC staff that tho design and clnacbra nft;dt evittueosc Itwith 4ho mccfflcuiono rlle ad to he-sopenI fuel poot supploivnonbl hoat cxchamrogcrc are cemrlplto, and ftha the fewlb dcmcerWtoete ccmprzanoc with opprpaprtc UFSAR and eode rsqulrcmnies.

3fsotteUrl g-alI~fillogn racuibs ef the piping~, pipe cuppoft, eupplomolnbii heat exchariger suports. end the inlr.IaVte conrwctln with the. exsi~ bo cxalheorgor [fo the appropriae load comblnailcu along w~it the marg~n.

L. PAD TCD SafedY Ana, ses 1, PAD 4.0 TCD has been speifically approved for use for the Turkey Point licensing basis analyses. Upon !NRC's approval of a revised genetic version of PAD that accounts for Thermal Conductivity Degradation (TCD), FPL wHl within six months:

t Demonstale that PAD 4.0 TCD remains conservatJvely bounding In liiensing basis analyses when compared to the new genetically approved version of PAD wITCD, or b, Provide a schedule far the re-analysls using the new genericaly approved version of PAD w(TCD5 for any of the affected licensing basis analyses.

Renewed License No. DPR-41 Amendment No. 245

Turkey Point Nuclear Plant L-2012-130 License Amendment Request No. 217 Page 43 of 43 Enclosure 8

St"aAble MaeftM in §ppol F4,0WON I. With rcpei -toTheah~niccl Bpczlfesicn 5.1.FPL st'311 no! crodit on; burrnbi tooer*oletW Man lnte~ipI Fuol Blurable Abctwbo (IFBA] rode feW the Storag o-fuelIossembliIe-ln-lIheRegion--spe rd-fuel-ra.ck 4.. Thrs renewed license is effective as of the date of issuance, and sha[l expire at midnight 10, 2033.

FOR THE NUCLEAR REGULATORY COMMISSION Signed by Samuel J. Colins, Director Office of Nuclear Rea clor Regulation Attachments.

Appendix A- Technical Speclltons For Unit 4 Appendix B - Erwmru'nental ProtectIon Plan Vale of Issuance: June 6, 2.002 Renewed Ucense No. DPR.41 Amendment No. 245