ML14245A200

From kanterella
Revision as of 08:40, 21 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
V.C. Summer Mid-Cycle Ltr 2014
ML14245A200
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/02/2014
From: Mark King
NRC/RGN-II/DRP/RPB5
To: Gatlin T
South Carolina Electric & Gas Co
References
IR-2014-006
Download: ML14245A200 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 September 2, 2014 Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT:

MID-CYCLE LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NRC ASSESSMENT REPORT 05000 395/20100 6

Dear Mr. Gatlin:

On August 1 2, 2014, the NRC completed its mid

-cycle performance review of V.C. Summer Nuclear Station, Unit 1. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013, through June 30, 20

14. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, V.C. Summer, Unit 1, operated in a manner that preserved public health and safety and met all cornerstone objectives.

The NRC determined that the performance at V.C. Summer Nuclear Station, Unit 1, during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross

-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross

-reference in IMC 0310 during the mid

-cycle assessment review and evaluated for cross

-cutting themes and potential substantive cross

-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015. Routine inspections performed by resident inspectors are not included in the inspection plan The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end

-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security

-related inspections, which will be sent via separate, non

-publicly available correspondence.

T. Gatlin 2 In response to the accident at Fukushima, the Commission issued Order EA 049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond

-Design-Basis External Events," which requires licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities following a beyond

-design-basis external event. Additionally, the Commission issued Order EA 051, "Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation," which requires licensees to have a reliable means of remotely monitoring wide-range Spent Fuel Pool levels to support effective prioritization of event mitigation and recovery actions in the event of a beyond

-design-basis external event.

The NRC is conducting audits of licensee efforts towards compliance with these Orders. This audit includes an onsite component in order for the NRC to evaluate licensee plans for complying with the Orders, as described in site

-specific submittals, and to receive and review information relative to associated open items.

This onsite activity will occur in the months prior to a declaration of compliance for the first unit at each site, and will aid staff in development of an ultimate Safety Evaluation for the site. The date for the onsite component at your site is being coordinated with your staff. A site-specific audit plan for the visit will be provided in advance to allow sufficient time for preparations.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from th e

Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4511 with any questions you may have regarding this letter.

Sincerely, /Mark Franke RA for/

Michael F. King, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket No.:

50-395 License No.:

NPF-12

Enclosure:

V.C. Summer Inspection/Activity Plan (09/01/2014 - 12/31/2015) cc Distribution via List Serv

________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE BDB /RA/ SON /RA/ MEF /RA for/ NAME BBishop SNinh MKing DATE 8/27/2014 8/27/2014 9/02/2014 E-MAIL COPY?

YES NO YES NO YES NO YES NO T. Gatlin 3 Letter to Thomas D. Gatlin from Michael F. King dated September 2, 2014.

SUBJECT:

MID-CYCLE LETTER FOR VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 - NRC ASSESSMENT REPORT 05000395/201006 DISTRIBUTION: D. Gamberoni, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 1 09/02/2014 09:49:27 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site SummerInspection / Activity Plan 09/01/2014

-12/31/2015 EP-EP PROGRAM INSPECTION 3 1 IP A lert and Notification System Testing7111402 09/08/2014 09/12/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 09/08/2014 09/12/2014 1 IP Emergency Action Level and Emergency Plan Changes7111404 09/08/2014 09/12/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 09/08/2014 09/12/2014 1 IP Performance Indicator Verification71151 09/08/2014 09/12/2014 CDBI-COMPONENT DESIGN BASES INSPECTION 7 1 IP Component Design Bases Inspection7111121 09/08/2014 09/12/2014 1 IP Component Design Bases Inspection7111121 10/06/2014 10/10/2014 1 IP Component Design Bases Inspection7111121 10/20/2014 10/24/2014 1 IP Component Design Bases Inspection711112111/03/201411/07/2014 TFPI-TRIENNIAL FIRE PROTECTION INSP 4 1 IP Fire Protection [Triennial]7111105T 04/20/2015 04/24/2015 1 IP Fire Protection [Triennial]7111105T 05/04/2015 05/08/2015 RP-RP PUBLIC RAD SAFETY BASELINE 3 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 07/27/2015 07/31/2015 1 IP Radiological Environmental Monitoring Program71124.07 07/27/2015 07/31/2015 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 07/27/2015 07/31/2015 1 IP Performance Indicator Verification71151 07/27/2015 07/31/2015OL RQ-REQUAL INSP 2 1 IP Licensed Operator Requalification Program7111111B 08/10/2015 08/14/2015 RP-RP RAD HAZARDS ASSESSMENT 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/05/2015 10/09/2015 EP-EP EXERCISE 5 1 IP Exercise Evaluation7111401 10/12/2015 10/16/2015 1 IP Emergency Action Level and Emergency Plan Changes7111404 10/12/2015 10/16/2015 1 IP Performance Indicator Verification71151 10/12/2015 10/16/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 10/12/2015 10/16/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.