Letter Sequence Approval |
---|
CAC:MF9293, Control Room Habitability (Approved, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22214A1732022-08-0202 August 2022 Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E 2024-09-05
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML21119A0642021-06-25025 June 2021 License Amendment 299 ML21176A1552021-06-25025 June 2021 Issuance of Amendment to Change the Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan to Reflect an ISFSI-Only Configuration (EPID No. L-2020-LLA-0267) Public Version ML19179A2032019-09-18018 September 2019 Amendment No. 298 Issuance of License Amendment for Removal of Cyber Security Plan Requirements ML19164A1562019-07-0101 July 2019 Conforming Amendment No. 297 to License DPR-16 ML19129A3652019-06-12012 June 2019 Offsite Exemption Letter ML19098A2582019-06-11011 June 2019 Issuance of Amendment No. 296, Change to the Effective and Implementation Dates of License Amendment for Emergency Plan and Emergency Action Level Scheme Based on Adiabatic Calculation ML18227A3382018-10-26026 October 2018 Issuance of Amendment No. 295, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML18221A4002018-10-17017 October 2018 Issuance of Amendment No. 294, Revise the Site Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MG0160; L-2017-LLA-0307) ML17356A2132018-03-0707 March 2018 Issuance of Amendment No. 293, Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition (CAC No. MF9352; L-2017-LLA-0177) ML17289A2222017-12-22022 December 2017 Issuance of Amendment No. 292, Request to Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9550; EPID L-2017-LLA-0193) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17067A0422017-06-23023 June 2017 Issuance of Amendment No. 291, Request to Delete Decommissioning Trust Provisions in License Conditions 3.F Through 3.K of the Renewed Facility Operating License ML17090A1582017-04-0707 April 2017 Correction to Renewed Facility Operating License Page for Amendment No. 289 Regarding Changes to the Technical Specifications to Reduce Reactor Steam Dome Pressure ML16235A4132017-03-0707 March 2017 Issuance of Amendment No. 290, Changes to Administrative Controls Section of the Technical Specifications No Longer Applicable to Facility in Permanently Defueled Condition ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15040A7212015-04-0303 April 2015 Issuance of Amendment to Revise Technical Specification for the Snubber Surveillance Requirements ML14329A6252015-03-30030 March 2015 Issuance of Amendment Regarding Reactor Building Vital Area Access Control ML14295A3002015-01-29029 January 2015 Issuance of Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML14226A9402014-12-24024 December 2014 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training (TAC Nos. MF3003, MF3004, MF3005, MF3006, MF3007, MF3008.. ML14008A3502014-05-27027 May 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement... ML13079A3722013-06-20020 June 2013 Issuance of Amendments Staff Qualifications Education and Experience Eligibility Requirments for Licensed Operators (ME9047) ML1118613412011-08-10010 August 2011 Issuance of License Amendments Regarding Exelon Cyber Security Plan ML1113101532011-06-28028 June 2011 Issuance of Amendment Changes to Appendix B, Environmental Technical Specifications ML1111701942011-06-16016 June 2011 Issuance of Amendment Elimination of Daily Testing of an Operable Emergency Diesel Generator ML1024305512010-10-18018 October 2010 Issuance of Amendment Secondary Containment Boundary Definition During Shutdown Conditions ML1019301722010-09-27027 September 2010 Issuance of Amendment Relocation of Surveillance Requirement Frequencies to a Licensee Controlled Document Based on TSTF-425, Revision 3 ML0925305612009-10-22022 October 2009 Issuance of Amendment Control Rod Drive System Rod Notch Testing Frequency ML0912708182009-08-11011 August 2009 Fleet, License Amendment, Application for TS Change Revision of Control Rod Notch Surveillance Test Frequency, Clarification of Source Range Monitor Insert Control Rod Action, & Clarification of a Frequency Example Using the Consolidated. ML0802804402009-04-0808 April 2009 Transmittal Letter - Oyster Creek Renewed License ML19095A4612009-04-0808 April 2009 License Transfer Conforming Amendment ML0835002172009-03-23023 March 2009 Issuance of Amendments Related to Removal of References to NRC Generic Letter 82-12 ML0828908782009-02-24024 February 2009 Issuance of Amendment Deletion of Section 6.5, Review and Audit ML0831903372009-02-23023 February 2009 Fleet, License Amendment, Adopt TS Task Force Change Traveler TSTF-308 ML0827705682009-01-0808 January 2009 Unit 1, Issuance of Conforming Amendments Direct Transfer of Facility Operating License to Exelon Generation Co., LLC ML0827502532008-12-23023 December 2008 Draft Amendment to Facility Operating License ML0826817542008-10-10010 October 2008 Issuance of Amendment Revision to Mechanical Snubber Functional Test Requirements ML0823906852008-09-30030 September 2008 Issuance of Amendment 269 Relocation of Pressure and Temperature Curves to the Pressure and Temperature Limits Report ML0806003302008-08-28028 August 2008 License Amendment, TSTF Change Traveler TSTF-479 & TSTF-497 ML0823907072008-08-21021 August 2008 Revised T.S. Pages Oyster Creek Nuclear Generating Station and Peach Bottom Atomic Power Station, Unit 3-Correction to Facility Operating Licenses ML0808606702008-07-25025 July 2008 Braidwood/Byron/Clinton/Dresden/Lasalle/Oyster Creek/Peach Bottom/Quad Cities/Three Mile Island - Issuance of Amds to Change TS Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators. (Tacs MD6364 ML0812303282008-05-30030 May 2008 Issuance of Amendment Primary Containment Oxygen Concentration ML0810505322008-04-30030 April 2008 License Amendment No. 265 the Incorporation of TSTF-448, Revision 3, Control Room Habitability. (Tac MD5281) ML0721406062007-08-0909 August 2007 Revised Pages of Facility Operating License DPR-16 ML0716504372007-08-0808 August 2007 Issuance of Amendment Request to Revise Annual Radioactive Effluent Release Report Sutmittal Date ML0711002372007-07-27027 July 2007 License Amendment, Issuance of Amendment Request to Change Technical Specification Definition of Channel Calibration, Channel Check, and Channel Test ML0710800192007-04-26026 April 2007 License Amendment Application of Alternate Source Term Methodology ML0622600272006-09-13013 September 2006 Issuance of Amendment Request to Increase Safety Valve As-Found Setpoint Tolerance from 1 Percent to 3 Percent ML0622001142006-09-0101 September 2006 Issuance of License Amendment 260 Regarding Revision to Electromatic Relief Valve Surveillance Requirement ML0620901592006-08-25025 August 2006 Issuance of Amendment Deletion of Reporting Requirement in Facility Operating License 2021-06-25
[Table view] Category:Safety Evaluation
MONTHYEARML21119A0632021-06-25025 June 2021 Safety Evaluation Report ISFSI Only Tech Specs ML21119A0622021-06-25025 June 2021 Letter to A. Sterdis Re Oyster Creek Issuance of Amendment to Revise Permanently Defueled Tech Specs ML19179A2052019-09-18018 September 2019 Safety Evaluation Report Oyster Creek Amendment No. 298 Issuance of License Amendment for Removal of Cyber Security Plan Requirements ML19095A4572019-06-20020 June 2019 License Transfer SER ML19095A8732019-06-11011 June 2019 Letter, Exemption from the Effective Date of Exemptions from Certain Emergency Planning Requirements, Change of Adiabatic Heat-up Calculation ML19098A2582019-06-11011 June 2019 Issuance of Amendment No. 296, Change to the Effective and Implementation Dates of License Amendment for Emergency Plan and Emergency Action Level Scheme Based on Adiabatic Calculation ML18227A3382018-10-26026 October 2018 Issuance of Amendment No. 295, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition ML18221A4002018-10-17017 October 2018 Issuance of Amendment No. 294, Revise the Site Emergency Plan and Emergency Action Level Scheme for the Permanently Defueled Condition (CAC No. MG0160; L-2017-LLA-0307) ML18220A9802018-10-16016 October 2018 Letter and Safety Evaluation, Exemption from Portions of 10 CFR 50.47 and Appendix E to 10 CFR 50 to Reduce Emergency Planning Requirements Consistent with Permanently Defueled Condition (CAC MG0153; EPID L-2017-LLE-0020) ML18226A3302018-09-28028 September 2018 Review of Update to Spent Fuel Management Plan ML18165A1362018-06-27027 June 2018 Independent Spent Fuel Storage Installation - Review and Acceptance of Changes Decommissioning Quality Assurance Program ML17356A2132018-03-0707 March 2018 Issuance of Amendment No. 293, Revise the Site Emergency Plan for On-Shift and Emergency Response Organization Staffing for Permanently Defueled Condition (CAC No. MF9352; L-2017-LLA-0177) ML17289A2222017-12-22022 December 2017 Issuance of Amendment No. 292, Request to Revise Cyber Security Plan Implementation Schedule for Milestone 8 and Associated License Condition (CAC No. MF9550; EPID L-2017-LLA-0193) ML17163A3552017-08-31031 August 2017 Calvert Cliff, Clinton, Dresden, LaSalle, Limerick, Nine Mile Point, Peach Bottom, Quad Cities, R. E. Ginna, and Three Miles Island - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules(Cac Nos. MF9470-MF9490) ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML17067A0422017-06-23023 June 2017 Issuance of Amendment No. 291, Request to Delete Decommissioning Trust Provisions in License Conditions 3.F Through 3.K of the Renewed Facility Operating License ML17150A0912017-06-0505 June 2017 Fleet - Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques (CAC Nos. MF8763-MF8782 and MF9395) ML16235A4132017-03-0707 March 2017 Issuance of Amendment No. 290, Changes to Administrative Controls Section of the Technical Specifications No Longer Applicable to Facility in Permanently Defueled Condition ML16222A7872016-09-0606 September 2016 Unit 1; and Quad Cities Nuclear Power Station, Units 1 and 2 - Review of Certified Fuel Handler Training and Retraining Program ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML16131A7502016-07-0606 July 2016 Staff Assessment Preliminary Decommissioning Cost Estimate and Spent Fuel Management Program (Cac. No. MF5577) ML15245A3462015-09-15015 September 2015 Review of Physical Security Plan, Revision 13 ML15153A2822015-07-30030 July 2015 Issuance of Amendments Revising the Completion Date for Milestone 8 of the Cyber Security Plan (TAC Nos. MF4728, MF4729, MF4730, MF4731, MF4732, MF4733, MF4734, MF4735, MF4736, MF4737, MF4738, MF4739, MF4740 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15097A1532015-05-0101 May 2015 Fourth 10-Year Interval Inservice Inspection Program Plan Requests for Relief and R-45 (TAC Nos. MF3406 and MF3407) ML15040A7212015-04-0303 April 2015 Issuance of Amendment to Revise Technical Specification for the Snubber Surveillance Requirements ML14329A6252015-03-30030 March 2015 Issuance of Amendment Regarding Reactor Building Vital Area Access Control ML14295A3002015-01-29029 January 2015 Issuance of Amendments Regarding Adoption of Technical Specifications Task Force Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs. ML14226A9402014-12-24024 December 2014 Issuance of Amendments Regarding the Emergency Plan Definition of Annual Training (TAC Nos. MF3003, MF3004, MF3005, MF3006, MF3007, MF3008.. ML14175B5932014-07-31031 July 2014 Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI Division1 ML14008A3502014-05-27027 May 2014 Issuance of Amendment to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month, Using the Consolidated Line Item Improvement... ML14100A3592014-04-30030 April 2014 Peach Bottom... Proposed Alternative to Utilize Code Case N-649, Alternative Requirements for IWE-5240 Visual Examination Section XI ML13175A1112013-08-0707 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-06 ML13175A1252013-08-0606 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-07 ML13169A0622013-08-0505 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-01 ML13175A1002013-08-0505 August 2013 Relief from the Requirements of the ASME Code, Relief Request No. I5R-02 ML13079A3722013-06-20020 June 2013 Issuance of Amendments Staff Qualifications Education and Experience Eligibility Requirments for Licensed Operators (ME9047) ML13092A4012013-04-18018 April 2013 Relief from the Requirements of the ASME Code, Relief Request No. l5R-01 for Expanded Applicability for Use of ASME Code Case N-661-1 ML12145A7032012-06-14014 June 2012 Relief Request to Extend the Fourth Inservice Inspection Interval ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML1208202662012-03-29029 March 2012 Request to Use Later Edition of Code for Listed Plants ML1200503502012-01-24024 January 2012 Relief from the Requirements of the ASME Code, Relief Request No. VR-02 for Fifth Inservice Testing Interval ML1118613412011-08-10010 August 2011 Issuance of License Amendments Regarding Exelon Cyber Security Plan ML1116500972011-06-30030 June 2011 Fleet - Approval of Change from Emergency Action Level Scheme Based on NEI 99-01, Revision 4, to NEI 99-01, Revision 5 ML1113101532011-06-28028 June 2011 Issuance of Amendment Changes to Appendix B, Environmental Technical Specifications ML1111701942011-06-16016 June 2011 Issuance of Amendment Elimination of Daily Testing of an Operable Emergency Diesel Generator ML1024305512010-10-18018 October 2010 Issuance of Amendment Secondary Containment Boundary Definition During Shutdown Conditions ML1019301722010-09-27027 September 2010 Issuance of Amendment Relocation of Surveillance Requirement Frequencies to a Licensee Controlled Document Based on TSTF-425, Revision 3 ML0925305612009-10-22022 October 2009 Issuance of Amendment Control Rod Drive System Rod Notch Testing Frequency ML0925200392009-09-15015 September 2009 Relief Request for Alternative Examination for Reactor Pressure Vessel Circumferential Shell Welds 2021-06-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 June 23, 2017
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION -ISSUANCE OF AMENDMENT RE: DELETION OF FACILITY OPERATING LICENSE CONDITIONS RELATED TO DECOMMISSIONING TRUST PRO\'llSIONS (CAC NO. MF9293)
Dear Mr. Hanson:
The U.S. Nuclear Regulatory Commission has issued the enclosed Amendment No. 291 to Renewed Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek), in response to your application dated February 20, 2017. The amendment deletes from the Oyster Creek facility operating license certain license conditions which impose specific requirements on the decommissioning trust fund agreement.
The provisions of Title 10 of the Code of Federal Regulations Section 50. 75(h) that specify the regulatory requirements for decommissioning trust funds will apply to Oyster Creek. A copy of the related Safety Evaluation is also enclosed.
Notice of Issuance will be included in the Commission's biweekly Federal Register notice. Docket No. 50-219
Enclosures:
Sincerely, IRA/ John G. Lamb, Senior Project Manager Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
- 1. Amendment No. 291 to Renewed DPR-16 2. Safety Evaluation cc: Listserv UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 EXELON GENERATION COMPANY. LLC DOCKET NO. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 291 Renewed License No. DPR-16 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The application for amendment by Exelon Generation Company, LLC (the licensee), dated February 20, 2017, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I;' B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Enclosure 1 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.F through 3.K of Renewed Facility Operating License No. DPR-16 are hereby amended to,read as follows: F. Deleted G. Deleted H. Deleted I. Deleted J. Deleted K. Deleted 3. This license amendment is effective as of the date of issuance and shall be implemented within 60 days of issuance.
Attachment:
Changes to the Renewed Facility Operating License No. DPR-16 Date of Issuance:
June 23, 2017 FOR THE NUCLEAR REGULATORY COMMISSION
/RAJ Eva Brown for/ Douglas A. Broaddus, Chief Special Projects and Process Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ATTACHMENT TO LICENSE AMENDMENT NO. 291 OYSTER CREEK NUCLEAR GENERATING STATION RENEWED FACILITY OPERATING LICENSE NO. DPR-16 DOCKET NO. 50-219 Replace the following pages of the Renewed Facility Operating License with the attached revised pages. The revised pages are identified by amendment number and contains marginal lines indicating the areas of change. Renewed Facility Operating License No. DPR-16 REMOVE INSERT -8--9-
- 3. These exemptions granted pursuant to 10 CFR 50.12 are authorized by law, will not present an undue risk to the public health and safety, and are consistent with the common defense and security.
With these exemptions, the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.
E. Deleted F. The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims. Sale and License Transfer Conditions:
A. Deleted. B. Deleted. C. Deleted. D. Deleted E. Deleted F. Deleted G. Deleted H. Deleted I. Deleted J. Deleted Renewed License No. DPR-16 Amendment No. 291 K. Deleted L. DELETED M. At the time of the closing of the transfer of Oyster Creek, and the respective license from AmerGen Energy Company, LLC (AmerGen) to Exelon Generation Company, AmerGen shall transfer to Exelon Generation Company ownership and control of AmerGen Oyster Creek NQF, LLC, and AmerGen Consolidation, LLC shall be merged into Exelon Generation Consolidation, LLC. Also at the time of the closing, decommissioning funding assurance provided by Exelon Generation Company, using an additional method allowed under 10 CFR 50.75 if necessary, must be equal to or greater than the minimum amount calculated on that date pursuant to, and required by 10 CFR 50.75 for Oyster Creek. Furthermore, funds dedicated for Oyster Creek prior to closing shall remain dedicated to Oyster Creek following the closing. The name of AmerGen Oyster Creek NQF, LLC shall be changed to Exelon Generation Oyster Creek NQF, LLC at the time of the closing. 4. This license is effective as of the date of issuance and shall expire at midnight on April 9, 2029.
Attachment:
Appendices A and B -Technical Specifications Date of Issuance:
April 8, 2009 FOR THE NUCLEAR REGULATORY COMMISSION
/RA/ Bruce S. Mallett Deputy Executive Director for Reactor and Preparedness Programs Office of the Executive Director for Operations Renewed License No. DPR-16 Amendment No. 291 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 291 TO RENEWED FACILITY OPERATING LICENSE NO. DPR-16 EXELON GENERATION COMPANY, LLC OYSTER CREEK NUCLEAR GENERATING STATION DOCKET NO. 50-219
1.0 INTRODUCTION
By application dated February 20, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17051A003), Exelon Generation Company, LLC (Exelon or the licensee), requested changes to the Renewed Facility Operating License (FOL) No. DPR-16 for the Oyster Creek Nuclear Generating Station (Oyster Creek). Exelon requested U.S. Nuclear Regulatory Commission (NRC) approval of an amendment to delete from the Oyster Creek FOL certain license conditions which impose specific requirements on the decommissioning trust fund agreement.
Once the decommissioning trust provisions are deleted from the Oyster Creek FOL, the provisions of Title 1 O of the Code of Federal Regulations (1 O CFR) Section 50. 75(h) that specify the regulatory requirements for decommissioning trust funds will apply to Oyster Creek.
2.0 REGULATORY EVALUATION
On December 24, 2002, the NRC issued a final rule promulgating new regulatory provisions at 1 O CFR 50.75(h)(1
)-(4) that govern financial assurance mechanisms for licensees that are not "electric utilities." 1 The provisions in 1 O CFR 50.75(h)(1
)-(3) include substantially similar decommissioning trust agreement requirements as those found in the Oyster Creek operating license conditions.
The NRC established these requirements stating that, "the NRC has always believed that it is preferable and more efficient to adopt standard rules, as opposed to applying specific license conditions on a case-by-case basis." Decommissioning Trust Provisions, Final Rule, 67 Fed. Reg. 78,332, 78,334 (Dec. 24, 2001 ). In the rulemaking, the NRC also addressed several comments regarding potential conflicts or inconsistencies between the provisions of 10 CFR 50.75(h)(1
)-(3) and a licensee's existing decommissioning trust agreement-related license conditions.
The NRC explained that, "licensees will have the option of maintaining their existing license conditions or submitting to the new requirements" and "will be able to decide for themselves 1 The term "electric utility" is defined in 10 CFR 50.2, "Definitions," as: "any entity that generates or distributes electricity and which recovers the cost of this electricity, either directly or indirectly, through rates established by the entity itself or by a separate regulatory authority.
Investor-owned utilities, including generation or distribution subsidiaries, public utility districts, municipalities, rural electric cooperatives, and State and Federal agencies, including associations of any of the foregoing, are included within the meaning of 'electric utility."'
Enclosure 2 After the promulgation of 1 O CFR 50.75(h)(1
)-(4), the NRC received a comment that the rule language did not sufficiently reflect the NRC's intent that individual licensees should have the option of retaining their existing license conditions.
In response, on November 20, 2003, the NRC promulgated 1 O CFR 50.75(h)(5), which provided, explicitly, that licensees could either maintain their existing facility-specific decommissioning trust agreement license conditions or eliminate them in favor of complying with the generic decommissioning trust agreement regulatory requirements.
Changes to Decommissioning Trust Fund Provisions, Direct final rule, 68 Fed. Reg. 65,386 (Nov. 20, 2003). Specifically, 1 O CFR 50.75(h}(5) states: The provisions of paragraphs (h)(1) through (h)(3) of this section do not apply to any licensee that as of December 24, 2003, has existing license conditions relating to decommissioning trust agreements, so long as the licensee does not elect to amend those license conditions.
If a licensee with existing license conditions relating to decommissioning trust agreements elects to amend those conditions, the license amendment shall be in accordance with the provisions of paragraph (h) of this section. Oyster Creek retained its original license conditions and now seeks to amend its license to delete those license conditions in favor of the regulatory provisions in 10 CFR 50.75(h)(1
)-(3). 3.0 TECHNICAL EVALUATION 3.1 Existing FOL License Conditions Related to Decommissioning Trust Provisions The Oyster Creek FOL has the following license conditions related to decommissioning trust provisions in paragraph 3: F. The decommissioning trust agreement for Oyster Creek must be in a form acceptable to the NRC. G. With respect to the decommissioning trust fund, investments in the securities or other obligations of Exelon Corporation, Exelon Generation Company, or their affiliates, successors, or assigns shall be prohibited.
Except for investments tied to market indexes or other nonnuclear sector mutual funds, investments in any entity owning one or more nuclear power plants are prohibited.
H. The decommissioning trust agreement for Oyster Creek must provide that no disbursements or payments from the trust shall be made by the trustee unless the trustee has first given the NRC 30-days prior written notice of payment. The decommissioning trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the Director, Office of Nuclear Reactor Regulation.
I. The decommissioning trust agreement must provide that the agreement cannot be amended in any material respect without 30-days prior written notification to the Director, Office of Nuclear Reactor Regulation.
J. The appropriate section of the decommissioning trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.
K. Exelon Generation Company shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for approval of the transfer of the Oyster Creek license and the requirements of the Order approving the transfer, and consistent with the safety evaluation supporting such Order. 3.2 Proposed Changes to the FOL Exelon proposed to replace the current Oyster Creek FOL license conditions 3.F through 3.K with "Deleted." 3.3 NRC Staff Technical Evaluation License Condition
- 3. F Exelon proposed to delete Oyster Creek license condition 3.F, which states: F. The decommissioning trust agreement for Oyster Creek must be in a form acceptable to the NRC. The NRC staff finds that license condition 3.F is related to decommissioning trust agreements, that it is implicit in the regulations in 10 CFR 50. 75( e) and (h) and, thus its deletion would result in the licensee instead being governed by the applicable provisions of 1 O CFR 50.75(h), consistent with 1 O CFR 50.75(h}{5).
License Condition 3.G Exelon proposed to delete Oyster Creek license condition 3.G, which states: G. With respect to the decommissioning trust fund, investments in the securities or other obligations of Exelon Corporation, Exelon Generation Company, or their affiliates, successors, or assigns shall be prohibited.
Except for investments tied to market indexes or other nonnuclear sector mutual funds, investments in any entity owning one or more nuclear power plants are prohibited.
This license condition is addressed in the Commission's regulations at 10 CFR 50.75(h}{1)(A) (Decommissioning Trust Final Rule, 67 FR 78336; December 24, 2002). Based on this information, the NRC staff finds that license condition 3.G is related to decommissioning trust agreements and, thus its deletion would result in the licensee instead being governed by the applicable provisions of 10 CFR 50.75(h), consistent with 10 CFR 50.75(h}{5). License Condition 3.H Exelon proposed to delete Oyster Creek license condition 3.H, which states: H. The decommissioning trust agreement for Oyster Creek must provide that no disbursements or payments from the trust shall be made by the trustee unless the trustee has first given the NRC 30-days prior written notice of payment. The decommissioning trust agreement shall further contain a provision that no disbursements or payments from the trust shall be made if the trustee receives prior written notice of objection from the Director, Office of Nuclear Reactor Regulation.
This license condition is addressed in the Commission's regulations at 1 O CFR 50.75(h)(1
)(iv) (Decommissioning Trust Final Rule, 67 FR 78336; December 24, 2002). Based on this information, the NRC staff finds that license condition 3.H is related to decommissioning trust agreements and, thus its deletion would result in the licensee instead being governed by the applicable provisions of 10 CFR 50.75(h), consistent with 10 CFR 50.75(h)(5).
License Condition 3.1 Exelon proposed to delete Oyster Creek license condition 3.1, which states: I. The decommissioning trust agreement must provide that the agreement cannot be amended in any material respect without 30-days prior written notification to the Director, Office of Nuclear Reactor Regulation.
This license condition is addressed in the Commission's regulations at 10 CFR 50.75(h)(1)(iii) (Decommissioning Trust Final Rule, 67 FR 78336; December 24, 2002). Based on this information, the NRC staff finds that license condition 3.1 is related to decommissioning trust agreements and, thus its deletion would result in the licensee instead being governed by the applicable provisions of 10 CFR 50.75(h), consistent with 10 CFR 50.75(h)(5).
License Condition 3.J Exelon proposed to delete Oyster Creek license condition 3.J, which states: J. The appropriate section of the decommissioning trust agreement shall state that the trustee, investment advisor, or anyone else directing the investments made in the trust shall adhere to a "prudent investor" standard, as specified in 18 CFR 35.32(a)(3) of the Federal Energy Regulatory Commission's regulations.
This license condition is addressed in the Commission's regulations at 1 O CFR 50. 75(h)(1 )(i)(B) (Decommissioning Trust Final Rule, 67 FR 78336; December 24, 2002). Based on this information, the NRC staff finds that license condition 3.J is related to decommissioning trust agreements and, thus its deletion would result in the licensee instead being governed by the applicable provisions of 10 CFR 50.75(h), consistent with 1 O CFR 50.75(h)(5). License Condition 3.K Exelon proposed to delete Oyster Creek license condition
- 3. K, which states: K. Exelon Generation Company shall take all necessary steps to ensure that the decommissioning trust is maintained in accordance with the application for approval of the transfer of the Oyster Creek license and the requirements of the Order approving the transfer, and consistent with the safety evaluation supporting such Order. This license condition is addressed in the Commission's regulations at 10 CFR 50.75(h)(1
)(i)(B) (Decommissioning Trust Final Rule, 67 FR 78336; December 24, 2002). Based on this information, the NRC staff finds that license condition 3.K is related to decommissioning trust agreements and, thus its deletion would result in the licensee instead being governed by the applicable provisions of 10 CFR 50.75(h), consistent with 10 CFR 50.75(h)(5).
3.4 NRC Staff Technical Conclusion The Oyster Creek FOL license conditions 3.F through 3.K relating to decommissioning trust agreements existed prior to December 24, 2003; therefore, the provisions of paragraphs 10 CFR 50.75(h)(1) through (h)(3) did not apply to Oyster Creek. Oyster Creek has elected to delete FOL license conditions 3.F through 3.K, and therefore, it will be governed by the applicable provisions of 50.75(h).
In accordance with 10 CFR 50.75(h)(5), the license amendment shall be in accordance with the provisions of paragraph (h) of 10 CFR 50.75. Oyster Creek shall meet the provisions of 1 O CFR 50.75(h).
Based on the above, the NRC staff concludes that the proposed changes are acceptable.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the New Jersey State official was notified of the proposed issuance of the amendment on May 19, 2017. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION The amendment changes a requirement with respect to installation or use of a facility component located within the restricted area as defined in 1 O CFR Part 20. The NRC staff has determined that the amendment involves no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure.
The Commission has previously issued a proposed finding that the amendment involves no significant hazards consideration, and there has been no public comment on such finding published in the Federal Register on March 28, 2017 (82 FR 15381 ). In addition, the regulation in 1 O CFR 50.75(h)(4) states that in the absence of a determination by the Commission otherwise, an amendment "that does no more than delete specifc license conditions relating to the terms and conditions of decommissioning trust fund agreement involves no significant hazards consideration." The Commission made no determination that the Oyster Creek amendment involved significant hazards. Accordingly, the amendment meets the eligibility criteria for categorical exclusion set forth in 1 O CFR 51.22(c)(9).
Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendment.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) there is reasonable assurance that such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. Principal Contributor:
J. Lamb Date: June 23, 2017
SUBJECT:
OYSTER CREEK NUCLEAR GENERATING STATION -ISSUANCE OF AMENDMENT RE: DELETION OF FACILITY OPERATING LICENSE CONDITIONS RELATED TO DECOMMISSIONING TRUST PROVISIONS (CAC NO. MF9293) DATED JUNE 23, 2017. DISTRIBUTION:
PUBLIC LSPB R/F RidsACRS_MailCTR Resource RidsNrrDirslfib Resource RidsNrrDorlLspb Resource RidsNrrLAIBetts Resource RidsNrrLAJBurkhardt Resource RidsNrrPMOysterCreek Resource RidsRgn1 MailCenter Resource ADAMS Accession No.: ML17067A042 OFFICE NRR/DORL/LSPB/PM NRR/DORL/LSPB/LA NAME JLamb I Betts DATE 05/18/17 05/08/17 OFFICE OGC (NLO) NRR/DORL/LSPB/BC NAME BMizuno DBroaddus EBrown for DATE 06/21/17 06/23/17 NRR/DORL/LSPB/LA JBurkhardt 05/18/17 NRR/DORL/LSPB/PM Jlamb 06/23/17 OFFICIAL RECORD COPY NRR/DIRS/IFIB/BC AB owe rs 06/20/17 '