Forwards FFD Semiannual Performance Data Rept for 960101 to 0630
ML17292A425
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/21/1996
From: Webring R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-96-169, NUDOCS 9608290135
Download: ML17292A425 (9)


Text

4f'REGULATORY INFORMATION DISTRIBUTION STEM (RIDS)ACCESSION NBR:9608290135 DOC.DATE: 96/08/21 NOTARIZED:

NO FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe AUTH.NAME AUTHOR AFFILIATION WEBRING,R.L.

Washington Public Power Supply System RECIP.NAME RECIPIENT, AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards FFD semiannual performance data rept for 960101-0630.DISTRIBUTION CODE: A021D COPIES RECEIVED:LTR-ENCL SIZE: TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" NOTES: DOCKET I 05000397 A 10CFR26.7 RECIPIENT ID CODE/NAME PD4-2 PD INTERNAL: ACRS NRR/DRPM/PSGB NUDOCS-ABSTRACT COPIES LTTR ENCL 1 1 1 1 2 2 1 1 RECIPIENT ID CODE/NAME COLBURN,T CENTER NRR DSS~A CPS RGN4 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 D U E N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED:, LTTR 11 ENCL 11 WASHINGTON PUBLIC POWER SUPPLY SYSTEM PO.Box 968~3000 George Washington Way~Riehiand, Washington 99352-0968

~(509)372-5000 August 21, 1996 G02-96-169 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 FITNESS FOR DUTY SEMIANNUAL PERFORMANCE DATA REPORT JANUARY I, 1996, TO JUNE 30, 1996 Pursuant to 10 CFR 26.71(d), enclosed is the Washington Public Power Supply System's Fitness for Duty Semiannual Performance Data report for January 1, 1996, to June 30, 1996.The data has been analyzed and management actions have been taken to enhance the FFD program.Should you have any questions or desire additional information regarding this matter, please call me or D.W.Martin, Manager, Security Programs at (509)377-8628.Respectfully, R.L.Webring Vice President, Operations Support/PIO Mail Drop PE08

Attachment:

WNP-2 Fitness for Duty Program, Performance Data Report for January 1, 1996, to June 30, 1996.CC: LJ Callan-NRC RIV KE Perkins, Jr.-NRC RIV, Walnut Creek Field Office NS Reynolds-Winston&Strawn TG Colburn-NRR DL Williams-BPA/399 NRC Sr.Resident Inspector-927N 9608290i35 96082i PDR ADQCK 05000397 R PDR Fitness for Duty Program Performance Data Personnel Sobject to 10CFR 26 Washington Public Power Supply System, WNP-2 3000 George Washington Way Contact Name: D.W.Martin 6 Months Ending: June 30, 1996 Richland, WA 99352 Phone: (509)377-8628[x]Appendix A to 10CFR26 Cutoffs: Marijuana Cocaine Opiates Screen/Confirmation 50 15 300 150 300 300 Screen/Confirmation Amphetamines 1000 500 Phencyclidine 25 25 Alcohol (%BAC).04 Testing Results Licensee Employees Long-Term Contractors Short-Term Contractors Average¹Unescorted Access;1199 94 353 Category¹Tested¹Positive¹Tested¹Positive¹Tested¹Positive Pre-Access Post-Accident Observed Behavior 167 20 872 14 Random Follow-Up Refuse To Test 358 10 19 92 17 Total 543 39 982 17 Page 1 Fitness for Duty Performance Data Personnel Subject to 10CFR 26 Breakdown of Confirmed Positive Tests for Specific Substances:

Licensee Employees Long-Term Contractors Short-Term Contractors THC 50ng THC 100ng Cocaine Opiates Amphetamines PCP Alcohol Total Licensee Employees Long-Term Contractors Short-Term Contractors Total Cocaine/Amphetamine Cocaine/Opiates (Heroin)Refused To Test Page 2

~4~~'

'P NUCLEAR PLANT NO.2 PERFORI'NANCE DATA REPORT January 1 to June 30, 1996 FI S F R DUTY PR RAM

SUMMARY

During this reporting period, approximately 28.5 percent of the population eligible for random selection have been randomly tested.The rate of positive from random testing is 0.04 percent.ITIVE R UI T Twenty-two chemical tests yielded positive results during this reporting period.Calculated from an historical perspective, positives recorded from January 1990 until June 1996, show that marijuana remains the drug of preference, accounting for 58 percent of all the positive results.Cocaine is second with 21 percent of positive results.MANA EMENT ACTI N: Pre-Access Access was denied for four employees and fourteen short-term contractor employees that tested positive on pre-access analysis.Management was notified and the individual's files were annotated of the positive result and management's actions.Refusal To Test Access was denied for one employee and one short-term contractor for refusal to test for pre-access.Both were terminated for cause.Management was notified and the individual's files were annotated of the refusal to test and termination for cause.Random Two short-term contractor employees who tested positive during random testing had their access removed for a minimum of fourteen days.Management was notified and their files were annotated of the positive results and management's actions.Page 3 C

NUCLEAR PLANT NO.2 PERFORMANCE DATA REPORT January 1 to June 30, 1996 Follow-Up One short-term contractor employee, participating in the follow-up program, tested positive during follow-up testing and had their access removed for three years.Management was notified and the individual's file was annotated of the positive result and termination for cause.Presently, there are two employees participating in the follow-up program.ADMINISTRATIVE ACTION: Two short-term contractors with unescorted access privileges were temporarily suspended, pending confirmation of the tests results.One individual initially tested positive by on-site EMIT testing for marijuana during random testing.The sample confirmed positive and the individual was denied access to the Protected Area of WNP-2 for fourteen days and referred to treatment.

Subsequent to the fourteen day access denial, this individual's employment was terminated.

The other short term contractor tested positive during a follow-up test for cocaine.The sample confirmed positive and the individual was denied access to the Protected Area of WNP-2 for three years and employment was terminated, EVENTS REPORTED TO THE NUCLEAR REGULATORY COMMISSION C: During this reporting period, there were no violations of the Fitness for Duty program that were reportable.

PROGRAM WEAKNESSES:

During this reporting period, no program weaknesses were identified.