CP-201700402, Response to RIS 2017-03
ML17143A232 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 04/28/2017 |
From: | Cox D Luminant Power |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
CP-201700402, RIS-17-003 | |
Download: ML17143A232 (2) | |
Similar Documents at Comanche Peak | |
---|---|
Category:Letter type:CP
MONTHYEARCP-202400335, License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel2024-09-12012 September 2024
[Table view]License Amendment Request to Adopt TSTF-51, TSTF-471, and TSTF-571-T to Eliminate Use of the Term Core Alterations and Revise Requirements During Handling of Irradiated Fuel CP-202400294, (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 (CPNPP) - Response to RAI for Exemption Request from 10 CPR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202400319, (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-13013 August 2024 (CPNPP) - Revision to CPNPP Letter to the NRC, Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400315, (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality2024-08-0505 August 2024 (Cpnpp), Multiple Relief Requests for Unit 2 Third Ten-Year Inservice Inspection Interval from 10CFR50.55(a) Inspection Requirements Due to Impracticality CP-202400253, (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 52024-06-26026 June 2024 (Cpnpp), Units 1 & 2 Inservice Testing Plan for Pumps & Valves Third Interval, Revision 5 CP-202400235, (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 02024-06-18018 June 2024 (Cpnpp), Units 1 & 2, Inservice Testing Plan for Pumps & Valves Fourth Interval, Revision 0 CP-202400205, (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval2024-05-30030 May 2024 (Cpnpp), Units 1and 2, Submittal of the Snubber Inservice Program Plan for the Fourth Ten Year Interval CP-202400175, (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-05-16016 May 2024 (CPNPP) - Supplement to License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400153, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters2024-04-29029 April 2024 (Cpnpp), Registration of Dry Spent Fuel Storage Canisters CP-202400107, (CPNPP) - 2023 Annual Radiological Environmental Operating Report2024-04-18018 April 2024 (CPNPP) - 2023 Annual Radiological Environmental Operating Report CP-202400099, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters2024-04-0909 April 2024 (CPNPP) - Registration of Dry Spent Fuel Storage Canisters CP-202400092, (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-04-0101 April 2024 (CPNPP) - Supplement to Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202400089, Property Damage Insurance2024-03-25025 March 2024 Property Damage Insurance CP-202400087, (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable2024-03-21021 March 2024 (CPNPP) - Notification of Deviation from Electric Power Research Institute (EPRI) MRP 2019-008, Interim Guidance for NEI 03-08 Needed Requirements for Us PWR Plants for Management of Thermal Fatigue in Non-Isolatable CP-202400085, (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-03-0707 March 2024 (CPNPP) - Revised Requested Compliance Date - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CP-202400073, (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator2024-03-0404 March 2024 (CPNPP) - Response to RAI for License Amendment Request to Extend Allowed Outage Time for an Inoperable Emergency Diesel Generator CP-202400072, (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation2024-02-29029 February 2024 (Cpnpp), Unit 1, Special Report 1-SR-24-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300470, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown CP-202300474, (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-02-28028 February 2024 (Cpnpp), Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions CP-202400063, (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23)2024-02-12012 February 2024 (CPNPP) - Inservice Inspection (ISI) Owners Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 23 (1RF23) CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 12024-01-31031 January 2024 License Renewal Application Revision 0 - Supplement 3, Revision 1 CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)2024-01-29029 January 2024 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1) CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 22023-12-13013 December 2023 (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2 CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation2023-12-12012 December 2023 (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation CP-202300494, License Renewal Application Revision 0, Supplement 32023-12-0606 December 2023 License Renewal Application Revision 0, Supplement 3 CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation2023-11-20020 November 2023 License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-10-12012 October 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 42023-10-0404 October 2023 Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4 CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program2023-09-15015 September 2023 (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2023-08-24024 August 2023 (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)2023-08-17017 August 2023 (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20) CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report2023-08-17017 August 2023 (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 0182023-08-15015 August 2023 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018 CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1122023-08-0101 August 2023 (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112 CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 32023-07-27027 July 2023 Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3 CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)2023-07-18018 July 2023 (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48) CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 12023-07-12012 July 2023 Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1 CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 22023-06-20020 June 2023 Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2 CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements2023-06-15015 June 2023 Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 12023-06-13013 June 2023 Response to Request for Additional Information Regarding License Renewal Application - Set 1 CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review2023-06-0606 June 2023 Response to Request for Additional Information - License Renewal Application Environmental Review CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-052023-05-25025 May 2023 Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05 CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application2023-05-0808 May 2023 Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)2023-05-0404 May 2023 (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0) CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Effluent Release Report CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 (Cpnpp), 2022 Annual Radiological Environmental Operating Report CP-202300165, License Renewal Application Revision 0 - Supplement 22023-04-24024 April 2023 License Renewal Application Revision 0 - Supplement 2 CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)2023-04-20020 April 2023 Submittal of 2022 Annual Environmental Operating Report (Non-Radiological) CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements2023-04-20020 April 2023 License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements 2024-09-12 Category:License-Operator MONTHYEARIR 05000445/20243012024-10-15015 October 2024
[Table view]NRC Initial Operator Licensing Examination Approval 05000445/2024301 and 05000446/2024301 ML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination CP-202100559, (CPNPP) - Initial Operator Licensing Examination2021-08-17017 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML20174A6092020-05-21021 May 2020 05 Final Outlines ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18086B0842018-02-16016 February 2018 Facility Cover Letter - Riv - March 2018 - GFE ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML16262A0362016-07-18018 July 2016 2016-07 Post-Exam Comments and Analysis ML16262A0382016-07-18018 July 2016 2016-07 Final Written Exams ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test 2024-10-15 Category:Part 55 Examination Related Material MONTHYEARIR 05000445/20243012024-10-15015 October 2024
[Table view]NRC Initial Operator Licensing Examination Approval 05000445/2024301 and 05000446/2024301 ML23226A2342023-06-22022 June 2023 Post Exam Comments and Analysis with Letter ML23262A9942023-06-22022 June 2023 CP-2023-06 Public Forms CP-202200219, (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 20262022-05-18018 May 2022 (Cpnpp), NRC Form 536, Operator Licensing Examination Data for Calendar Years 2023, 2024, 2025, and 2026 ML21285A0372021-09-23023 September 2021 CP-2021-08-FINAL Operating Test ML21285A0382021-09-23023 September 2021 CP-2021-08-FINAL Written Exam ML21299A0212021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam Comments ML21299A0142021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outline Comments ML21299A0162021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test ML21299A0152021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Outlines ML21299A0182021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test ML21299A0172021-09-23023 September 2021 CP-2021-08-DRAFT Operating Test Comments ML21299A0202021-09-23023 September 2021 CP-2021-08-DRAFT Outlines ML21299A0192021-09-23023 September 2021 2021-08-DRAFT Outline Comments ML21299A0132021-09-23023 September 2021 CP-2021-08-DRAFT Make Up Op Test Comments ML21299A0252021-09-23023 September 2021 CP-2021-08-FINAL Outlines ML21299A0452021-09-23023 September 2021 CP-2021-08-Public Forms ML21299A0232021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test Outlines ML21299A0222021-09-23023 September 2021 CP-2021-08-DRAFT Written Exam ML21285A0392021-09-23023 September 2021 CP-2021-08-Post Exam Comments ML21299A0242021-09-23023 September 2021 CP-2021-08-FINAL Make Up Op Test CP-202100570, (CPNPP) - Initial Operator Licensing Examination2021-08-24024 August 2021 (CPNPP) - Initial Operator Licensing Examination ML20174A6052020-05-21021 May 2020 05 Draft Outline Comments ML20174A6062020-05-21021 May 2020 05 Draft Outlines ML20174A6072020-05-21021 May 2020 05 Draft Written Examination Comments.Pdf ML20174A6082020-05-21021 May 2020 05 Draft Written Examination ML20174A6102020-05-21021 May 2020 05 Final Written Examination ML20174A6092020-05-21021 May 2020 05 Final Outlines ML18309A3502018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 IR 05000445/20183012018-11-0505 November 2018 Notification of NRC Initial Operator Licensing Examination 05000445/2018301 and 05000446/2019301 ML18157A0602018-06-0606 June 2018 NRC Initial Operator Licensing Examination Approval 05000445/2018301; 050000446/2018301 CP-201800217, Transmittal of NRC Form 536, Licensed Operator Examination Data2018-04-18018 April 2018 Transmittal of NRC Form 536, Licensed Operator Examination Data ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17179A0082017-06-19019 June 2017 2017-06-DRAFT Written Exam ML17179A0062017-06-19019 June 2017 2017-06-DRAFT Outlines ML17179A0032017-06-19019 June 2017 2017-06-DRAFT Operating Test Comments ML17179A0052017-06-19019 June 2017 2017-06-DRAFT Outline Comments ML17179A0072017-06-19019 June 2017 2017-06-DRAFT Written Exam Comments ML17179A0102017-06-19019 June 2017 2017-06-FINAL Outlines ML17179A0112017-06-19019 June 2017 2017-06-FINAL Written Exam ML17198B2822017-06-19019 June 2017 2017-06-Public Forms ML17179A3462017-06-19019 June 2017 2017-06-Post Examination Comments CP-201700402, Response to RIS 2017-032017-04-28028 April 2017 Response to RIS 2017-03 ML16262A0382016-07-18018 July 2016 2016-07 Final Written Exams ML16262A0372016-07-18018 July 2016 2016-07 Final Operating Test ML16262A0362016-07-18018 July 2016 2016-07 Post-Exam Comments and Analysis ML16293A9752016-07-11011 July 2016 2016-07 Proposed OP Test Comments ML16293A9762016-07-11011 July 2016 2016-07 Final Outlines ML16293A9712016-07-11011 July 2016 2016-07 Proposed Outline Comments ML16293A9722016-07-11011 July 2016 2016-07 Proposed Written Exam 2024-10-15 |
Text
/ 'I Luminant April 2s; 2017 CP-201700402 David Coit Operat!ons Initial Tra!nlng Supeivisor David.Gox@luminant.com U.S. Nuclear Regulatory Commission
_ ATI'.N': Document Control Oesk Washington, DC 20S55-0001 Re: Response to RIS 2017-03 T,o whom it may concern, Luminant Power P 0Box1002 6322 North FM 56 Glen Rose, TX 76043 T 254 897 5578 F 254 897 5400 Please find attached NRC 'Form *536 for Comanche Peak. This is in response to RJS 2017-03, requesting update of initial examination schedules for CY s 2019 through 2022. The attached document has also been electronically submitted to Vincent Gaddy in the Region . IV office, as requested in the RIS.
- Art: NRC Form 536, Comanche Peak Nuc::lear Power Plant
..........
NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016)
Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, This " .... 0 OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send " comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 /!! n < 0 F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to ; i EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory
- Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means ,..,.. ...... used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Comanche Peak Nuclear Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 -------ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRG-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 19 CY 20 CY 21 CY 22 ---------NUMBER OF REACTOR 6 3 3 3 OPERATORS NUMBER OF SENIOR REACTOR 6 3 3 3 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 9 9 6 6 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS
-LIMITED PROPOSED DATES PRIMARY DATE 06/10/2019 06/15/2020 06/14/2021 06/13/2022 I ALTERNATE DATE 06/17/2019 06/22/2020 06/21/2021 06/20/2022
- c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY CY ---NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF CANDIDATES NRG FORM 536 (05-2016)