Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
CP-202400030, License Renewal Application Revision 0 - Supplement 3, Revision 131 January 2024License Renewal Application Revision 0 - Supplement 3, Revision 1
CP-202400034, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)29 January 2024(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 1)
CP-202300575, (Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 213 December 2023(Cpnpp), License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Supplement 2Safe Shutdown
High winds
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Incorporated by reference
FLEX
Fukushima Dai-Ichi
Open Phase Condition
Large early release frequency
Seismic Walkdown Report
CP-202300566, (Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring Instrumentation12 December 2023(Cpnpp), Special Report 1-SR-23-001-00, Inoperable Post Accident Monitoring InstrumentationPost Accident Monitoring
CP-202300494, License Renewal Application Revision 0, Supplement 36 December 2023License Renewal Application Revision 0, Supplement 3Boric Acid
Finite Element Analysis
Aging Management
License Renewal
CP-202300349, License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear Instrumentation20 November 2023License Amendment Request (Lar) 23-004 Technical Specifications (TS) 3.9.3, Nuclear InstrumentationShutdown Margin
Probabilistic Risk Assessment
CP-202300416, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements12 October 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements
CP-202300432, Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 44 October 2023Response to Request for Additional Information Regarding the Safety Review of the License Renewal Application - Set 4Boric Acid
Fire Barrier
Coatings
Aging Management
License Renewal
Subsequent License Renewal
Through-Wall Leak
Fire Protection Program
CP-202300442, (CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) Program15 September 2023(CPNPP) - Request to Use Later Code Edition for Inservice Inspection (ISI) ProgramIncorporated by reference
CP-202300391, (CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule24 August 2023(CPNPP) - Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Update ScheduleIncorporated by reference
Exemption Request
CP-202300411, (Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)17 August 2023(Cpnpp), Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 2 Refueling Outage 20 (2RF20)
CP-202300361, (CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day Report17 August 2023(CPNPP) - Unit 2 Refueling Outage 20 (2RF20) Steam Generator 180 Day ReportNondestructive Examination
CP-202300401, 10CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 01815 August 202310CFR50.59 Evaluation Summary Report 024, 10CFR72.48 Evaluation Summary Report 009, and Commitment Material Change Evaluation Report 018Operator Manual Action
CP-202300358, (Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 1121 August 2023(Cpnpp), Transmittal of Electronic Licensing Basis Documents Including Certified FSAR Amendment 112
CP-202300322, Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 327 July 2023Response to Requests for Additional Information Regarding Review of the License Renewal Application Sets 2 and 3Boric Acid
Fire Barrier
Coatings
Nondestructive Examination
Aging Management
Moisture barrier
License Renewal
Subsequent License Renewal
Through-Wall Leak
Fire Protection Program
CP-202300348, (Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)18 July 2023(Cpnpp), Transmittal of Revised Emergency Plan (Revision 48)Health Physics Network
Fukushima Dai-Ichi
CP-202300285, Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 112 July 2023Response to Request for Additional Information Regarding Review of the License Renewal Application - Set 1Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Aging Management
License Renewal
Earthquake
Pressure Boundary Leakage
Pressure boundary leak
Dissimilar Metal Weld
Stretch Power Uprate
CP-202300262, Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 220 June 2023Response to Request for Confirmation of Information Regarding Review of the License Renewal Application - Set 2Boric Acid
Fire Barrier
Aging Management
Fire Protection Program
CP-202300263, Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System Requirements15 June 2023Supplemental Information to Facilitate Acceptance of Licensee Amendment Request 23-002, Application Regarding GDC-5 Shared System RequirementsSafe Shutdown
CP-202300248, Response to Request for Additional Information Regarding License Renewal Application - Set 113 June 2023Response to Request for Additional Information Regarding License Renewal Application - Set 1
CP-202300209, Response to Request for Additional Information - License Renewal Application Environmental Review6 June 2023Response to Request for Additional Information - License Renewal Application Environmental Review
CP-202300207, Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-0525 May 2023Revision to Comanche Peak Nuclear Power Plant'S Response to Notice of Violation (NOV) 05000445/2021011-05
CP-202300182, Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal Application8 May 2023Response to Requests for Confirmation of Information Regarding the Environmental Review of the License Renewal ApplicationSafe Shutdown
CP-202300201, (CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)4 May 2023(CPNPP) - Core Operating Limits Report (Colr), Unit 2 Cycle 21, (ERX-23-001, Revision 0)Shutdown Margin
CP-202300160, (Cpnpp), 2022 Annual Radiological Environmental Operating Report27 April 2023(Cpnpp), 2022 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
CP-202300159, (Cpnpp), 2022 Annual Radiological Effluent Release Report27 April 2023(Cpnpp), 2022 Annual Radiological Effluent Release ReportAnnual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
CP-202300165, License Renewal Application Revision 0 - Supplement 224 April 2023License Renewal Application Revision 0 - Supplement 2Boric Acid
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Coatings
Finite Element Analysis
Aging Management
Moisture barrier
License Renewal
Subsequent License Renewal
Earthquake
EVT-1
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Dissimilar Metal Weld
Stretch Power Uprate
CP-202300175, Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)20 April 2023Submittal of 2022 Annual Environmental Operating Report (Non-Radiological)
CP-202300181, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments20 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI, Corrected Affidavit for Application for Order Consenting to Transfer of Licenses and Conforming License Amendments
CP-202300096, License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems Requirements20 April 2023License Amendment Request (LAR) 23-002 Application Regarding GDC-5 Shared Systems RequirementsSafe Shutdown
Operator Manual Action
Surveillance Frequency Control Program
CP-202300140, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-00119 April 2023Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors. LAR 23-001Safe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Large early release frequency
CP-202300157, ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License Amendments14 April 2023ISFSI, Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, and ISFSI, Application for Order Consenting to Transfer of Licenses and Conforming License AmendmentsSafe Shutdown
Probabilistic Risk Assessment
Cyber Security
Decommissioning Funding Plan
Large early release frequency
Safeguards Contingency Plan
License Renewal
Fire Protection Program
CP-202300135, License Renewal Application Revision 0 - Supplement 16 April 2023License Renewal Application Revision 0 - Supplement 1Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Aging Management
Foreign Material Exclusion
Moisture barrier
License Renewal
Subsequent License Renewal
Fire Protection Program
Flow Induced Vibration
CP-202300144, (CPNPP) - Decommissioning Report30 March 2023(CPNPP) - Decommissioning ReportDecommissioning Funding Plan
Authorized possession limits
CP-202300139, (CPNPP) - Property Damage Insurance30 March 2023(CPNPP) - Property Damage Insurance
CP-202300098, (Cpnpp), Annual Report of Changes in Peak Cladding Temperature16 March 2023(Cpnpp), Annual Report of Changes in Peak Cladding Temperature
CP-202200481, Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)7 December 2022Response to Request for Additional Information - Relief Request Application P-1, Inservice Testing (IST)Probabilistic Risk Assessment
CP-202200454, (Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .1 December 2022(Cpnpp), Reply to a Notice of Violation Transmitted Via NRC Letter from Gregory Werner to Ken Peters Dated 11/01/2022, Comanche Peak Nuclear Power Plant, Units 1 and 2 Integrated Inspection Report 05000445/2022003 .Safe Shutdown
CP-202200355, Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-00221 November 2022Application to Revise Technical Specifications to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model LAR 22-002Reactor Vessel Water Level
Loop seal
Stroke time
Anticipated operational occurrence
Hydrostatic
Coatings
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fuel cladding
CP-202200380, (CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specifications21 November 2022(CPNPP) - Non-Voluntary License Amendment Request to Revise Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical SpecificationsBoric Acid
Shutdown Margin
Anticipated operational occurrence
Hydrostatic
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Fuel cladding
Power change
CP-202200450, (CPNPP) - Registration of Dry Spent Fuel Storage Canisters16 November 2022(CPNPP) - Registration of Dry Spent Fuel Storage Canisters
CP-202200435, (Cpnpp), Registration of Dry Spent Fuel Storage Canisters8 November 2022(Cpnpp), Registration of Dry Spent Fuel Storage Canisters
CP-202200419, (CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day Report3 November 2022(CPNPP) - Unit 1 Refueling Outage 22 (1RF22) Steam Generator 180 Day ReportNondestructive Examination
CP-202200357, (CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report14 September 2022(CPNPP) Unit 2 - Response to Request for Additional Information, Fall 2021 (2RF19) Steam Generator Tube Inspection Report
CP-202200358, (CPNPP) - Transmittal of Revised Emergency Plan (Revision 46)14 September 2022(CPNPP) - Transmittal of Revised Emergency Plan (Revision 46)Health Physics Network
Fukushima Dai-Ichi
CP-202200246, Evacuation Time Estimate Analysis25 August 2022Evacuation Time Estimate AnalysisPandemic
Coronavirus
COVID19
CP-202200306, (CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)11 August 2022(CPNPP) - Inservice Inspection (ISI) Owner'S Activity Reports (OAR-1 Forms) for Unit 1 Refueling Outage 22 (1RF22)
CP-202200273, Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative20 July 2022Third Supplement to License Amendment Request (LAR) 20-006 Application to Revise Technical Specifications to Adopt Risk Informed Completion Times, TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF InitiativeSurveillance Frequency Control Program
CP-202200276, (CPNPP) - Relief Request Application P-1, Inservice Testing (IST)20 July 2022(CPNPP) - Relief Request Application P-1, Inservice Testing (IST)Safe Shutdown
Probabilistic Risk Assessment
CP-202200247, (CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 01730 June 2022(CPNPP) - 10CFR50.59 Evaluation Summary Report 023, 10CFR72.48 Evaluation Summary Report 008 and Commitment Material Change Evaluation Report 017