Corrected Monthly Operating Rept for Apr 1980
ML18139A598
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/16/1980
From: DUNN S D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139A597 List:
References
NUDOCS 8010200392
Download: ML18139A598 (4)


Text

.... I '-.,\ VIRGINIA ELECTRIC Af.l"D POWER COMPAlN SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 80-09 SEPTEMBER, 1980 APPROVED:

Section Operating Data Report -Unit #1 CONTENTS Operating Data Report -Unit #1 (APRIL CORRECTED REPORT) Operating Data Report -Unit #1 (MARCH CORRECTED REPORT) Operating Data Report -Unit #2 Unit Shutdowns and Power Reductions

-Unit #1 Unit Shutdowns and Power Reductions

-Unit #2 Load Reductions Due to Environmental Restrictions

-Unit #1 Load Reductions Due to Environmental Restrictions Unit #2 Average Daily Unit Power Level -Unit #1 Average Daily Unit Power Level -Unit #2 Summary of Operating Experience .Amendments to Facility License or Technical Specifications Facility Changes Requiring NRC Approval Facility Changes That Did Not Require NRC Approval Tests and Experiments Requiring NRC Approval Test and Experiments That Did Not Require NRG Approval Other Changes, Tests and Experiments Chemistry Report Description of All Instances Where Thermal Discharge Lim.its Were Exceeded Fuel Handling Procedure Revisions That Changed The Operating Mode Described In The FSAR Description of Periodic Tests Which Were Not Completed Within The Time Lim.its Specified In Technical Specifications Inservice Inspection Reportable Occurrences Pertaining to Any Outage or Power Reductions Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Mechanical Maintenance

... ' Page* l 2 3 4 5 6 8 9 10 11 12 14 15 15 16 16 17 18 19 20 22 23 24 26 27 31 1** .. ...... ' ..... Section ii CONTENTS Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Engineering Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Instrument Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Instrument Maintenance Heal th Physics Procedure Deviations Reviewed By Station Nuclear Safety and Operating Committee After Time Limits Specified In Technical Specifications 33 35 37 39 41 43 44

' OPERATING DATA REP'JRT OPERATING STATUS 1. UNIT NAME 2. REPORTING PERI'JD D'JCKET NO. 50-280 DATE 09 OC:T 80 C'JMPLETED BY SUE D. DUNN TELEPHONE 804-357-3184 SURRY UNIT 1 090180 T'J 093080 3. LIC:ENSED THERMAL PJ'rr'ER (M'l'IT) 2441 ,----------------------1

4. NAMEPLATE RATING (GROSS MwE) 5. DESIGN ELECTRICAL RATING (NET l&E) 6. MAXIMUM DEPENDABLE

':APACITY (GR'JSS MWE) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) . 8. IF CHANGES 'JCCUR IN CAPACITY RATINGS (ITEMS 3 TH.ROUGH 7) SINCE LAST REPORT. GIVE REAS'JNS 847.5 !NOTES I 822 I I 740 704 NIA 9. POWER LEVEL T'J RESTP.ICTED.

IF ANY NIA (NET MwE) 10. REAS'JNS F'JR RESTRICTI'JflS.

IF ANY NIA 11. HOURS IN REP'JRTING PEP.IOD 12. NUMBER OF HOURS REACT'JR WAS CRITICAL -13. REACT'JR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR

!JN-LINE 15. UNIT RESERVE SHUTD'Yr/N H'JURS 16. GROSS THERNAL ENERGY GENERATED

(."fwH) 17. GR'JSS ELECTRICAL ENERGY GENERATED (Ml'IH) 18. NET ELECTRIC:AL ENERGY GENERATED (l.fn'H) 19. UNIT SERVICE FACT'JR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPAt;ITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACT:JR (USING DER NET) 23. UNIT FORCED 'JUTAGE RATE 24. SHUTD'JWNS SCHEDULED

.'JVER NEXT 6 M'JNTHS (TYPE.DATE.AND DURATI')N JF EACH) 2 5. IF SHUT D 'JYI N AT END .'JF REP'JRT PERI OD. ESTIMATE DATE OF STARTUP 26. UllITS IN TEST STATUS (PRI'JR TJ COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY C'JMMERC:IAL

'JPERATI'JN THIS MONTH YR-TO-DATE CUMULATIVE 720.0 6575.0 68159.0 324.2 3786.9 42538.S o.o 182.6 3731. 5 323.7 3763.8 41668.8 o.o 183.6 3736.2 618659.0 8674529.0 963891+01.

0 173010.0 2621245.0 31301743.0 160829.0 2473025.0 29699924.0 45.0 olo 57.2 olo 61.1 o /o 45.0 o lo 60.0 olo 66.6 olo 31. 7 olo 53.4 o lo 61.9 olo 27.2 o lo 45.8 olo 53.0 olo 0.0 olo 39.1 r>I<> 26.4 olc-September 1, 1981 F'JRECAST ACHIEVED ..... . .. '