GO2-13-066, 2012 Annual Environmental Operating Report

From kanterella
Revision as of 20:12, 11 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
2012 Annual Environmental Operating Report
ML13128A275
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/29/2013
From: Atkinson D K
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GO2-13-066
Download: ML13128A275 (2)


Text

Dale K. Atkinson Vice President, Employee Development/Corporate Services ENERGY P.O. Box 968, Richland, WA 99352-0968 NORTHW EST Ph. 509.377.4302 F. 509.377.4098 dkatkinson

@ energy-northwest.com Apdl 29, 2013 G02-13-066 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 2012 ANNUAL ENVIRONMENTAL OPERATING REPORT

Dear Sir or Madam:

This letter is submitted per the reporting requirements of Section 5.4.1 of the Columbia Generating Station Environmental Protection Plan (EPP; Appendix B to Facility Operating License No. NPF-21).There were no EPP noncompliances in 2012 and there were no changes in station design or operation, tests, and experiments that involved an unreviewed environmental question.

No non-routine, non-radiological reports (within the context of EPP Section 5.4.2) were required for 2012. A summary of the effluent data reported to the State of Washington Energy Facility Site Evaluation Council on the monthly discharge monitoring reports is attached.There are no commitments being made to the NRC by this letter. Should you have any questions or desire additional information regarding this report, please call BC Barfuss at (509) 377-4541.Respectfully, DK Atkinson Vice President, Employee Development/Corporate Services Attachment cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector

-988C AJ Rapacz -BPA/1 399 WA Horin -Winston & Strawn 2012 ANNUAL ENVIRONMENTAL OPERATING REPORT Attachment Page 1 of 1 COLUMBIA GENERATING STATION COOLING WATER BLOWDOWN DISCHARGES, 2012 ITotal Maximum Discharge Volume Days of pH Residual Total (millions of gallons)Month Discharge Halogen Copper ( o)Low High (mg/L) (pg/L) Average(a)

Maximum(b)

Jan 31 7.8 8.5 <0.1 12 1.6 2.1 Feb 29 8.1 8.4 <0.1 10 1.6 2.0 Mar 31 8.0 8.5 <0.1 9.9 1.6 2.0 Apr 30 7.9 8.4 <0.1 12 1.5 2.3 May 31 7.9 8.4 <0.1 14 2.1 5.1 Jun 26 7.9 8.3 <0.1 13 1.3 5.1 Jul 31 7.9 8.3 <0.1 16 1.4 2.5 Aug 31 7.8 8.2 <0.1 21 1.6 2.5 Sep 30 8.0 8.3 <0.1 14 1.6 2.8 Oct 31 7.9 8.4 <0.1 15 1.6 4.8 Nov 30 7.9 8.3 <0.1 12 1.5 2.7 Dec 31 7.9 8.3 <0.1 13 1.6 2.1 Permit 6.5 9.0 0.1 ) 5.6 9.4 Limit (a) Average daily discharge for the month (b) Maximum daily discharge during the month (c) Copper limits are: 70 pg/L monthly average, 108 Ig/L daily max, Dec -Feb 223 pg/L monthly average, 345 Ig/L daily max, Mar -Nov