Submittal of 2019 Annual Environmental Operating Report
ML20121A094
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/29/2020
From: Vance S
Energy Northwest
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DIC 1316.13, GO2-19-076
Download: ML20121A094 (4)


Text

          

ENERGY Scott A. Vance Vice President, Corporate Governance and General Counsel P.O. Box 968, MD PE13 NORTHWEST Richland, WA 99352-0968 Ph. 509.377-4650 l F. 509.372.5330 savance@energy-northwest.com April 29, 2020 GO2-19-076 DIC 1316.13 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

COLUMBIA GENERATING STATION, DOCKET NO. 50-397 2019 ANNUAL ENVIRONMENTAL OPERATING REPORT

Dear Sir or Madam:

This letter is submitted pursuant to Section 5.4.1 of the Columbia Generating Station Environmental Protection Plan (EPP), Appendix B to the Facility Operating License No.

NPF-21, which requires Energy Northwest (EN) to submit an Annual Operating Report for the EPP to the Nuclear Regulatory Commission (NRC) for the prior calendar year.

Through this letter, EN is notifying NRC of one nonconformance to the EPP in 2019. A 2019 nonconformance occurred when EN failed to submit a copy of the modified National Pollutant Discharge Elimination System permit within 30 days of the issued date of March 19, 2019, pursuant to Section 3.2 of the EPP. This was entered into the Corrective Action Program on April 25, 2019, for resolution (CR #392585). The conformance resolution was submitted in letter GO2-19-076 (ML19120A483).

No other non-routine, non-radiological reports were required for 2019 as there were no changes in station design or operation, testing, or experiments that involved an unreviewed environmental question. A summary of the effluent data reported to the State of Washington Department of Health and the Energy Facility Site Evaluation Council on the monthly discharge monitoring reports are provided in the Attachment.

          

April 29, 2020 GO2-19-076 Page 2 of 2 There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Mr. RL Phillips at (509) 377-5350.

Executed on the _____  

day of ___________, 2020.

Respectfully, DocuSigned by:

[

~L.

D58EB905 5F2F498 ...

Scott A. Vance Vice President, Corporate Governance and General Counsel

Attachment:

Summary of Discharge Monitoring Reports cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident Inspector CD Sonada - BPA/1399 SAV/np

          

ATTACHMENT

          

2019 ANNUAL ENVIRONMENTAL OPERATING REPORT Page 1 of 1 COLUMBIA GENERATING STATION 2019 COOLING WATER BLOWDOWN DISCHARGES Total Maximum Residual Total Discharge Volume Days of pH Halogen (ug/L) (millions of gallons/day)

Month Discharge Low High (mg/L) Copper (c) Chromium(d) Zinc (e) Average (a) Maximum (b)

Jan 31 8.0 8.5 <0.1 16 <1.0 21 2.0 3.7 Feb 28 7.9 8.4 <0.1 14 1.3 20 1.8 3.0 Mar 31 7.7 8.4 <0.1 10 <1.0 18 2.0 4.3 Apr 30 8.0 8.4 <0.1 12 <1.0 16 2.0 4.8 May 31 7.6 8.4 <0.1 12 <1 12 2.2 3.4 Jun 30 7.1 8.5 <0.1 12 <1 15 2.6 4.5 Jul 31 7.8 8.4 <0.1 17 1.5 34 2.14516 4.3 Aug 31 7.7 8.7 <0.1 11 <1 12 3.3 5.3 Sep 30 7.6 8.7 <0.1 8.2 <1 10 2.9 4.9 Oct 31 8.0 8.5 <0.1 12 <1 15 2.1 3.4 Nov 30 7.5 8.6 <0.1 9.9 1.1 13 2.2 2.8 Dec 31 7.2 8.2 <0.1 19 2.0 42 2.2 2.7 Permit 6.5 9.0 0.1 (c) (d) (e) 5.6 9.4 Limit (a) Average daily discharge for the month (b) Maximum daily discharge for the month (c) No permit limit for copper (d) Chromium limits are: 8.2 ug/L monthly average, 16.4 ug/L daily maximum (e) Zinc limits are: 53 ug/L monthly average, 107 ug/L daily maximum