|
---|
Category:Annual Operating Report
MONTHYEARGO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report GO2-22-038, Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462022-03-0909 March 2022 Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-21-062, 2020 Annual Environmental Operating Report2021-04-29029 April 2021 2020 Annual Environmental Operating Report GO2-21-063, Independent Spent Fuel Storage Installation, 2020 Annual Radiological Environmental Operating Report2021-04-27027 April 2021 Independent Spent Fuel Storage Installation, 2020 Annual Radiological Environmental Operating Report GO2-19-076, Submittal of 2019 Annual Environmental Operating Report2020-04-29029 April 2020 Submittal of 2019 Annual Environmental Operating Report GO2-20-070, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462020-04-22022 April 2020 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-19-066, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462019-04-17017 April 2019 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML18120A2982018-04-30030 April 2018 2017 Annual Radioactive Effluent Release Report GO2-18-056, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462018-04-12012 April 2018 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-17-091, and ISFSI - 2016 Annual Radiological Environmental Operating Report2017-05-11011 May 2017 and ISFSI - 2016 Annual Radiological Environmental Operating Report GO2-15-065, Report of Changes or Errors in ECCS LOCA Analysis Models Pursuant 10 CFR 50.462015-04-28028 April 2015 Report of Changes or Errors in ECCS LOCA Analysis Models Pursuant 10 CFR 50.46 ML14111A3442014-04-16016 April 2014 Annual Report of Individual Monitoring for 2013 Calendar Year ML13137A1082013-04-30030 April 2013 2012 Annual Radiological Environmental Operating Report ML13128A1942013-04-30030 April 2013 Annual Radioactive Effluent Release Report January Through December 2012 GO2-13-066, 2012 Annual Environmental Operating Report2013-04-29029 April 2013 2012 Annual Environmental Operating Report GO2-12-071, Independent Spent Fuel Storage Installation, 2011 Annual Radiological Environmental Operating Report2012-05-15015 May 2012 Independent Spent Fuel Storage Installation, 2011 Annual Radiological Environmental Operating Report GO2-12-063, 2011 Annual Environmental Operating Report2012-04-23023 April 2012 2011 Annual Environmental Operating Report GO2-12-060, Annual Report of Individual Monitoring2012-04-18018 April 2012 Annual Report of Individual Monitoring GO2-10-065, Annual Environmental Operating Report2010-04-26026 April 2010 Annual Environmental Operating Report ML1002609952010-01-14014 January 2010 2009 Annual Financial Report ML0807104922008-02-29029 February 2008 Transmittal of Annual Operating Report for 2007 ML0707207602007-02-26026 February 2007 Radioactive Effluent Release Report for January 2006 - December 2006 GO2-06-064, Annual Environmental Operating Report2006-04-28028 April 2006 Annual Environmental Operating Report ML0614300352005-12-31031 December 2005 2005 Annual Radiological Environment Operating Report Data Tables a and B GO2-05-183, 2005 Annual Financial Report2005-11-11011 November 2005 2005 Annual Financial Report GO2-05-030, 2004 Annual Environmental Operating Report2005-02-15015 February 2005 2004 Annual Environmental Operating Report GO2-04-095, Annual Radiological Environmental Operating Report2004-05-14014 May 2004 Annual Radiological Environmental Operating Report GO2-04-049, 2003 Annual Environmental Operating Report2004-03-30030 March 2004 2003 Annual Environmental Operating Report GO2-03-085, 2002 Annual Radiological Environmental Operating Report, January 1 to December 31, 2002, Table A-3.1 Through Table B-11.12003-05-14014 May 2003 2002 Annual Radiological Environmental Operating Report, January 1 to December 31, 2002, Table A-3.1 Through Table B-11.1 GO2-03-040, Annual Operating Report 20022003-02-27027 February 2003 Annual Operating Report 2002 GO2-02-036, Annual Operating Report 20012002-02-28028 February 2002 Annual Operating Report 2001 2024-04-30
[Table view] Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] |
Text
W. Grover Hettel ENERGY Columbia Generating Station P.O. Box 968, PE23 J'NORTHWEST Richland, WA 99352-0968 Ph. 509.377.83111 F. 509.377.4150 wghettel@energy-northwest.com April 16, 2014 10 CFR 20.2206(b)
G02-14-060 REIRS Project Manager Office of Nuclear Regulatory Research U. S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397; ANNUAL REPORT OF INDIVIDUAL MONITORING
Dear Sir or Madam:
As required by 10 CFR Part 20.2206(b), Energy Northwest's Columbia Generating Station Report of Individual Monitoring for the 2013 calendar year is being submitted in electronic format. The report includes data for individuals for whom monitoring was required and those for whom monitoring was provided, but not required.
Regulatory Guide 8.7, Revision 2, recommends using the following format on NRC Forms 4 and 5:
" "NR" (Not Required) in the blocks to indicate the areas for which monitoring was not required.
" "ND" (Not Detectable) in the blocks where monitoring was provided but not measurable, and
" "NC" (Not Calculated) in the blocks if the Committed Effective Dose Equivalent (CEDE) does not exceed 1 rem and there are no over-exposures in any dose category within the monitoring year.
Additional requested information:
Licensee Information Licensee: Energy Northwest NRC License No: NPF-21 Licensee
Contact:
Gary Burton, HP Staff Advisor Contact Phone: (509) 377-4661
- 1ý E _ý 1_2_ý
ANNUAL REPORT OF INDIVIDUAL MONITORING Page 2 of 2 Electronic Format Information File Name: form5fle-orig.dat Date Submitted: Data file was submitted on the date of this letter Method of Submittal REIRS Web Page http://www.reirs.com Should you have any questions or desire additional information, please contact DW Gregoire at (509) 377-8616.
I~pecflly4 / (-
WG Hettel Vice President, Operations cc: NRC Document Control Desk NRC Region IVAdministrator NRC NRR Project Manager NRC Sr. Resident Inspector / 988C WA Horin - Winston & Strawn MA Jones, BPA / 1399 D Hagemeyer, ORAU