GNRO-2014/00050, Correction of Technical Specification Typographical Error

From kanterella
Revision as of 05:11, 29 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Correction of Technical Specification Typographical Error
ML14212A113
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/31/2014
From: Nadeau J J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNRO-2014/00050
Download: ML14212A113 (6)


Text

Entergy Operations, Inc.P.O.Box 756 Port Gibson, MS 39150 James Nadeau Manager, Regulatory Assurance Grand Gulf Nuclear Station Tel.(601)437-2103 GNRO-2014/00050 July 31,2014 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

REFERENCES:

Dear Sir or Madam:

Correction of Technical Specification Typographical Error Grand Gulf Nuclear Station, Unit 1 Docket No.50-416 License No.NPF-29 1.Electronic Request for Correction of Typographical Error in Condition L of Technical Specification 3.3.1.1, dated July, 18, 2014 2.Electronic Request for Additional Information Regarding Maximum Extended Load Line Limit Plus Amendment Request Date March 18, 2014 (TAC MF2798)3.Entergy Letter GNRO-2013/00012:

Maximum Extended Load Line Limit Analysis Plus (MELLLA+)License Amendment Request, dated September, 25, 2013 (ADAMS Accession No.ML 13269A140)

Entergy Operations, Inc.is providing in Attachment 1 the revised mark-up page and in Attachment 2, the revised clean technical specificationpagerequested in the Reference 1 Request for Correction of Typographical Error in Condition L of Technical Specification 3.3.1.1.This letter contains no new commitments.

If you have any questions or require additional information, please contact James Nadeau at 601-437-2103.

Sincerely,.£..--..//t.k JN/ram{7GP,./-Attachments:

1.Revised Marked-up Technical Specification Page Correcting Typographical Error 2.Revised Clean Technical Specification Page Correcting Typographical Error GNRO-2014/00050 Page 2 of 2 cc: u.s.Nuclear Regulatory Commission ATTN: Mr.A.Wang, NRRlDORL Mail Stop OWFN/8 G14 11555 Rockville Pike Rockville, MD 20852-2378 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 u.S.Nuclear Regulatory Commission ATTN: Marc L.Dapas (w/2)Regional Administrator, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 State Health Officer Mississippi Department of Health P.O.Box 1700 Jackson, MS 39215-1700 Attachment 1 to GNRO-2014/00050 Revised Marked-up Technical Specification Page Correcting Typographical Error ACTIONS (continued)

CONDITION REQUIRED ACTION RPS Instrumentation 3.3.1.1 COMPLETION TIME I.As requi red by Required Action 0.1 and referenced in Table 3.3.1.1-1.

1.1 Initiate

action to Immediately fully insert all insertable control rods in core cells containing one or more fuel assemblies.

J.1 J.As required by Required Action 0.1 and referenced in Table 3.3.1.1-1.

Initiate action to Immediately implement the Manual BSP regions defined in the COLR ANil 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> J.2 Implement the Automated BSP Scram region using the modified APRM Flow Biases Simulated Thermal Power-High rip function setpoints defined in the COLR.J.3 Initiate action to Immediately submit an OPRM report in accordance with Specification 5.6.7.K.Required Action and associated Completion Time of Condition J not met.L.Required Action and associated Time of not met.K.1 ANil K.2 ANll K.3 L.1 Initiate action to implement the Manual BSP Regions defined in the COLR.Reduce operation to below the BSP Boundary defined in the COLR.-------NOTELCO 3.0.4 is not applicable.

Restore required channels to OPERABLE.Reduce THERMAL POWER to<16.8%RTP.Immediately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> 120 days 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> GRAND GULF 3.3-2a Amendment No.+&8.+9+,__

Attachment 2 to GNRO-2014/00050 Revised Clean Technical Specification Page Correcting Typographical Error ACTIONS (continued)

CONDITION I.As required by Required Action 0.1 and referenced in Table 3.3.1.1-1.

J.As required by Required Action 0.1 and referenced in Table 3.3.1.1-1.

1.1 J.1 REQUIRED ACTION Initiate action to fully insert all insertable control rods in core cells containing one or more fuel assembl i es.Initiate action to implement the Manual BSP regions defined in the COLR RPS Instrumentation 3.3.1.1 COMPLETION TIME Immediately Immediately J.2 Implement the 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Automated BSP Scram region using the modified APRM Flow Biases Simulated Thermal Power-Hi gh rip function setpoints defined in the COLR.J.3 Initiate action to Immediately submit an OPRM report in accordance with Specification 5.6.7.K.Required Action and associated Completion Time of Condition J not met.K.1 Initiate action to implement the Manual BSP Regions defined in the COLR.Immediately Reduce operation to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> below the BSP Boundary defined in the COLR.-------NOTELCO 3.0.4 is not applicable.

120 days Restore required channels to OPERABLE.L.Required Action and associated Completion Time of Condition K not met.L.1 Reduce THERMAL POWER to<16.8%RTP.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> GRAND GULF 3.3-2a Amendment No.+&8,+9+,__