 Issue dateTitleTopic
ML23208A21127 July 2023Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related DefinitionsShutdown Margin
Reactor Vessel Water Level
Packing leak
Water Inventory Control
Surveillance Frequency Control Program
Pressure Boundary Leakage
GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b6 June 2023License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4bSafe Shutdown
High winds
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Tornado Missile
Water Inventory Control
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Condition Adverse to Quality
FLEX
Tornado-Generated Missile
Abnormal operational transient
Fukushima Dai-Ichi
Seismically rugged
Tornado Missile Protection
Surveillance Frequency Control Program
Scram Discharge Volume
Large early release frequency
Tornado Missile Risk Evaluator
Earthquake
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
CNRO-2022-00015, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement Process26 May 2022Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling Using the Consolidated Line-Item Improvement ProcessSurveillance Frequency Control Program
ML21266A16123 September 2021Application to Revise Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the ActuatedUltimate heat sink
Water Inventory Control
Surveillance Frequency Control Program
Recently irradiated fuel
ML21062A1983 March 2021Supplement to License Amendment Request to Adopt TSTF-501 Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control, Revision 1Surveillance Frequency Control Program
GNRO-2019/00028, Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.13 June 2019Supplement to Revise Technical Specification (TS) 3.3.1.1, Reactor Protection System (RPS) Instrumentation, and TS 3.3.4.1, End of Cycle Recirculation Pump Trip (EOC-RPT) Instrumentation.Grace period
GNRO-2015/00002, Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/201427 March 2015Response to Electronic Request for Additional Information Regarding Modification of Technical Specification (TS) 3.8.4, DC Sources Operating Surveillance Requirements (Srs) 3.8.4.2 and 3.8.4.5. Amendment Request Dated 12/9/2014
GNRO-2014/00050, Correction of Technical Specification Typographical Error31 July 2014Correction of Technical Specification Typographical Error
ML12277A0812 October 2012Proposed Techincal Specification ChangesSafe Shutdown
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Scram Discharge Volume
Fuel cladding
Recently irradiated fuel
Offsite Circuit
Grace period
GNRO-2009/00062, License Amendment Request to Revise Minimum Critical Power Ratio Safety Limits27 October 2009License Amendment Request to Revise Minimum Critical Power Ratio Safety LimitsReactor Vessel Water Level
Anticipated operational occurrence
ENOC-09-00009, Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour Restrictions27 April 2009Entergy Nuclear Operations, Inc. - License Amendment Request; Proposed Adoption of TSTF-511 Regarding Elimination of Technical Specification Work Hour RestrictionsSafe Shutdown
Fitness for Duty
GNRO-2008/00013, License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start Testing11 September 2008License Amendment Request, Technical Specification Surveillance Requirements for Diesel Generator Slow Start TestingSafe Shutdown
Offsite Circuit
GNRO-2007/00050, Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope Habitability7 August 2007Supplemental Information for Licensing Amendment Request Pertaining to Control Room Envelope HabitabilitySafe Shutdown
Incorporated by reference
Recently irradiated fuel
Fire Protection Program
Grace period
GNRO-2007/00004, License Amendment Request, Request for a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control Material18 January 2007License Amendment Request, Request for a Technical Specification Change to Allow Use of Control Rod Assemblies with Different Control MaterialShutdown Margin
GNRO-2006/00036, License Amendment Request, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)1 November 2006License Amendment Request, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers Using the Consolidated Line Item Improvement Process (TSTF-372)Incorporated by reference
GNRO-2004/00013, Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LDC-2003/10218 February 2004Application for Technical Specification Improvement to Eliminate Requirements for Hydrogen Recombiners and Hydrogen Monitors Using the Consolidated Line Item Improvement Process, LDC-2003/102Incorporated by reference
GNRO-2003/00053, Application for Technical Specification (TS) Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process.24 October 2003Application for Technical Specification (TS) Improvement to Revise TS 3.1.8, Scram Discharge Volume (SDV) Vent and Drain Valves, Using the Consolidated Line Item Improvement Process.Incorporated by reference
Scram Discharge Volume
GNRO-2003/00044, Supplement to Amendment Request Removal of Mode Restrictions for Surveillance Testing of the Division 3 Battery7 August 2003Supplement to Amendment Request Removal of Mode Restrictions for Surveillance Testing of the Division 3 Battery
GNRO-2003/00025, License Amendment Request, Proposed Changes to Primary Containment and Drywell Isolation Instrumentation Requirements, Ldc 2003-0338 May 2003License Amendment Request, Proposed Changes to Primary Containment and Drywell Isolation Instrumentation Requirements, Ldc 2003-033Safe Shutdown
Reactor Vessel Water Level
RBG-46072, Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject Testing14 March 2003Proposed Amendment of Facility Operating License to Remove Operating Mode Restrictions for Performing Division 1 & 2 Emergency Diesel Generator Load Reject TestingSafe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Large early release frequency
Earthquake
Fuel cladding
Offsite Circuit
ML0225604006 September 2002New Special Operations Limiting Condition of Operation Suppression Pool Makeup-Mode 3. Revised TS Page 3.6-34 and the New Additional TS Page 3.10-23, 3.10-24, 3.10-25 & 3.10-26