ML18052A926

From kanterella
Revision as of 09:05, 14 December 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Attachment 3 of Rev 4 to Procedure EI-6.13, Protective Action Recommendation for Offsite Population.
ML18052A926
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/02/1987
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
EI-6.13, NUDOCS 8704130125
Download: ML18052A926 (2)


Text

l. * ' -* fi

-* PERMANENT AND SEASONAL POPULATION ANALYSIS Summer Winter Proc No EI* .13 Attachme t 3 Revisi n 4 Pager: of 1 Winter Clear Time Estimates Analysis Clear Time Clear Time Adverse Areas Radii (Estimates) (Estimates) (Estimates) 1 2 \ 3 lV") . 4 ") 5 6 V) 1. 2. 3. . 0-2 Mi 2 hr 50 min 2 hr 25 2 hr 30 min 0-5 Mi, SE 2 hr 45 min min 2 hr 55 min 0-5 Mi, NE 3 hr 25 min min 5 hr 20 min 0-10 Mi, SE 4 hr 45 m.in 4 hr 5 min 4 hr 55 min 0-10 Mi, NE 5 hr 5 hr 40 min 7 hr 10 min Entire EPZ 5 hr 5 hr 40 min 7 hr 10 min All residents, transients nd special within the evacuation analysis area would be cuated. .Time estimates are rounded t6 the nearest five-minute per.od and include times associated with notification, preparation and mobili ation events. Snowstorm adverse w and travel speed o ther, represented by a reduction in roadway capacity 30 percent. Reference Inc. 336 ocument Number 84-668. Prepared by: HMM Associates, June, 1984. Massachusetts 01742. ei0383-0049dl54-91