ML18052A926

From kanterella
Jump to navigation Jump to search
Attachment 3 of Rev 4 to Procedure EI-6.13, Protective Action Recommendation for Offsite Population.
ML18052A926
Person / Time
Site: Palisades Entergy icon.png
Issue date: 04/02/1987
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
EI-6.13, NUDOCS 8704130125
Download: ML18052A926 (2)


Text

l. ~** ' - ~

    • .~. -
  • Proc No EI* .13 Attachme t 3 Revisi n 4 Pager: of 1 PERMANENT AND SEASONAL POPULATION ANALYSIS Winter Clear Time

~

Summer Winter Estimates Analysis Clear Time Clear Time Adverse Areas Radii (Estimates) (Estimates) (Estimates) 1 . 0-2 Mi 2 hr 50 min 2 hr 25 2 hr 30 min 2 0-5 Mi, SE 2 hr 45 min min 2 hr 55 min 3 0-5 Mi, NE 3 hr 25 min min 5 hr 20 min

\

4 0-10 Mi, SE 4 hr 45 m.in 4 hr 5 min 4 hr 55 min

~

lV") .

")

~ 5 0-10 Mi, NE 5 hr 5 hr 40 min 7 hr 10 min fi ~ 6 V)

Entire EPZ 5 hr 5 hr 40 min 7 hr 10 min

1. All residents, transients nd special fa~ilities within the evacuation analysis area would be e~ cuated. .Time estimates are rounded t6 the nearest five-minute per.od and include times associated with notification, preparation and mobili ation events.
2. Snowstorm adverse w ther, represented by a reduction in roadway capacity and travel speed o 30 percent.
3. Reference ocument Number 84-668. Prepared by: HMM Associates, Inc. 336 Massachusetts 01742. June, 1984.

ei0383-0049dl54-91