ML18087A750
ML18087A750 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 05/13/1982 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18087A720 | List:
|
References | |
QAI-4-3, NUDOCS 8303160625 | |
Download: ML18087A750 (6) | |
Text
- REVIEW OF PROCUREMENT DOCUMENTS 1 . SCOPE DOCUMENT NO.: STATION SALEM REVISION:
- JATE: PAGE 1 OF QF.I .:;-3 1 0 *r::*r .... -: I c 8/'7J l*.*c_uME 2 This instruction applies to the Quality Assurance Department's view of procurement documents for designated items and services.
- 2. PURPOSE The purpose of this instruction is to describe the Quality Assurance Department review of procurement documents for specified items. 3. REFERENCE DOCUMENTS 10CFR Part 21 -Reporting of Defects and Noncompliance.
- 4. IMPLEMENTATION The documents listed below shall be reviewed by *the Quality ance pepartment (QAD) as described.
4.1 .1 SPECIFICATIONS Specifications shall be reviewed and approved by the QA Engineering and Construction Division in accordance with the applicable QAI. 4.1.2 BID PACKAGE 4.1 .2.1 Bid packages for items or services on Salem Q or non-safety related.with QA provisions or any other item or*service to which the QA Program applies shall be reviewed by the applicable QA division for quality content. This review shall be accomplished prior to* submittal to prospective suppliers through the Purchasing Department.
If the review is satisfactory, the Manager -QA ices shall initial and date the bid request cover letter and ward it to the Purchasing Department.
Comments resulting from the review shall be documented and to the requesting partment for resolution.
Bid packages shall be approved by the Manager -QA Services upon resolution of all comments and forwarded to the Purchasing Department.
4.1.3 SUPPLIER
QUOTATIONS Quotations or proposals from successful bidders shall be reviewed the applicable QA division for compliance with quality requirements and engineering specifications.
Discrepancies noted be mented and brought to the attention of the sponsor engineer. plier quotations or proposals shall be approved by the applicable manager upon resolution of all comments.
M P82 48 10/1 : B303-f6o625 830314 ___ -
I \'()L!JME:
2 REVISION:
1 0 DOCUMENT "<C. QAI 4-3 .1-"'-°' 4.
PAGE 3 Of 8 DATE:.. S/13/82 MATERIAL REQUEST AND RECEIVING RECORD
- 4.1.5.1 Material Request and Receiving Record (MR/RR) forms which are designated safety related or non-safety related with quality provisions shall be submitted to the following QAD organizations:
(1) MR/RR forms initiated at Salem Generating Station shall be reviewed and approved by the QA Operations and Maintenance Division.
(2) MR/RR forms initiated by the Engineering Department shall be reviewed and approved by the QA Services Division.
Non-safety related requisitions which do not include quality sion do not require QA approval for reorders.
4.1.5.2 Items requiring provisions shall not be included on material requisitions or purchase orders with items that do not quire quality provisions.
4.1.5.3 The following information shall be supplied in the "Quality Assurance" block (see Attachment
- 1) by the requesting organization.
Key (a) 1 ( b) 2 ( c) 3 Note: (a) 4 ( e) 5 Check safety related "yes", or Check safety related "no", or Check Commercial Cataloq Item (CCI) One of the above and only one shall be checked. Check "QA provisions" block. "yes",
tion, forms, etc. may be required.
If "no", nothing is required other than item number and definition of what is being procured.
The "QA provisions" block shall be checked "yes" for non-safety related items which require QA Program provisions, e.g., Fire tection Equipment.
Check the applic?bility of lOCFR Part 21. 4.1.5.4 The material request shall be reviewed by the responsible QAE for the following, prior to submittal to Purchasing or further processing to the initiating department.
(1) Equipment specification is included, approved by QAD. (2) Adequate material description per 4.3.2.1 through 4.3.2.3. (3) Completion of Assurance" block per 4.1.5.3 . M P82 48 10/3
- 2 SP.LEM R=:VtSlON:
1 Q DOCUM=:NT
>.;CJ. Qf..I *4-3. DATE:
4.1 .6.2 Examples of services include: Consultant services Calibration services Design analyses/stress calculations Inspection Nondestructive examination Security Operating procedures preparation Radiation monitoring/protection Radwaste Seismic and geologic surveys Station Emergency Plan PJ...GE Fire protection inspection by fire consultants Maintenance and betterment Meteorological data collection program Environmental Qualification Testing 4.1.7 ISSUED PURCHASE ORDERS/CONTRACTS 5 of 8 . 4.1.7.1 Local orders less than $50 which are not processed through the Purchasing Department shall not be used for procurement of items requiring quality provisions.
- 4. 1. 7 up-on receipt of a copy of the issued purchase order, the QA Services Division shall review it for inclusion of the previously established quality assurance requirements and correct tion.* Discrepancies shall be brought to the attention of the chasing Department representative and resolved.
4.1.8 SUPPLIER
DOCUMENTS Review of supplier documents shall be in accordance with cable QAis. 4.2 CHANGES TO PROCUREMENT DOCUMENTS . 4!2.1 Changes to documents already approved and/or reviewed shall be handled in the same manner as was the original document.
4,2.2. Changes in classification of previously approved procurement documents (i.e., safety related to non-safety related and versa) shall be reviewed and approved by the responsible QA Division prior to issuance.
4.2.3 Change
orders involving technical or quality requirements shall not be issued without an approved material request form. M P82 48 10/5
- 2 SALEM ( c) ( d) ( e) 1 0 REVISION:
QAI 4-3 DO CUM ENT "10. 7 of 8 DATE'. " I l"J Ip,.., ,,./I ...) I .._,I c... PAGE Suppliers of Fire Protection hardware when the only QA provisions is a UL or FM listing need not be included on the list. Sales Office, if other than the specified facility, need not be included on the list. In these cases the purchase order shall specify that the procured item be supplied by the approved facility as identified on the list. A completed and approved QAF 34 has been issued. QAD ap-I proval of a MR/RR is not sufficient documentation of sup-plier approval.
(5) Allow no substitution_
of the identified Commercial Catalog Item unless authorized by and Quality Assurance ment representatives.
(6) Forward copies of purchase orders and contracts with ments, to the responsible Manager -Quality Assurance in lel with those going to the requisitioner.
4.3.2 ENGINEERING
AND CONSTRUCTION DEPARTMENT, NUCLEAR FUEL DEPARTMENT AND NUCLEAR DEPARTMENT The shall, on the MM/RR form, specification or attachments:
4.3.2.1 Completely identify the intended procurement item(s) cluding quantity, component type, part number and intended use. Either part number, size class, or rating should be included as applicable.
4.3.2.2 Where codes or standards apply, furnish a complete fication consisting of: (for ASME) (for ASTM, ANSI and others) material designation B&PVC edition addendum referenced code cases considered material designation standard number year of issuance supplementary requirements M P82 48 10/7 TITLE PSE&G MATERIAL FOR.M (PURCHASE REQUEST DOC. NO.
NO. l. QAI 4-3 SALEM REV. 3 PAGEl VOLUME 2 DATE4/29/80 MATERIAL REQUEST ANC RECEIVING RECORD D Pl..lftCMAIC 111111'.QUl*ITIO'f NO, 0 P.i cjs;;_-rffi*' G Public &!rvlco *:* ""' & * , El..ctrlc and Gaa , Company D l..GC4L P\JACHA*ll DlllDIUlll lltO, o."l ..... &HT 0,. MAT.RIAL
.. D lllSWO*A 0 ND-UW P'O* CNAlll*l*l,.<UIOS
.. "'" " K .. " 0
- r L *I " I "' T OL ... ......, ....
.. &*
.... -&*T DIU.J y &.&&.c
- T JriilEW JEP\S(Y MLU AND LIU lA.X OHUCT P'AYMENT rERWIT -Df"-22"1*:rl
....Ca1..,.IOM1 D&..UVUT T1can 110, D AUTM/ACCT
..... 0. *TOC.K COOi. ,.0, c.o9T HT& 11T1w .. T1D O u1ru* "" DUH a QUI ***u111T1.o""'
TCL. llr.T. COIT AlllOIJllCT , ..... ff l"ATlllllJllT APP*O'W'&D 1 *&1*MT MOJ&l'°'O CO,.Ti>IMl.aa OAT& a&C&l'YllP
!.] ,..,,.,,.,a C JO ,OLLOW 0 PAID LOCALLY*
Accou*T OF 1
- * *-_, ,, 0 -* -1 3: I--' iJ> , .. Cu ' ' rn -0 ' (fl ;;-CD (fl CJ .....i. I-'* -ti .,.. MATERIAL ORDERL!TEM CLASSIFICATION
-.....i. f-'* OJ +-0 <T -..J VENDOR R/C EST. COST OJ iO rt ...., 0 ADDRESS AUTH. CE f-'* ... -..J 0 OJ -ACCT. LDC. CODE :J I--' CD I SYSTEM/COMPONENT 000000 ., 0 (fl SUPERVISOR'S CONTROL NUMBER ...., CONFIRMING ORDER: YES 0 NO D ' DATE REQ. ' 0 t; ...., 2. Cl.. FOUO *nEM QUALITY 3 INJ OAMATION CLASSIFICATION PROVISIONS (1) ITEM " c OR cW1 ...., NO. QTY U/M MATERIAL DESC..AIPTION/SEAVICf REQUIRED E L COOE PT. OR SE NU 1-E QA OAF-19/0TH[A
- -..... 0 21 --,,.,....., ? H s p__, rt '-" (1) 3 (Jl en OJ --l f-' )> :1> -f 3 0 z I -i I l *-.o N );> < HO 'SE* SEISMIC 1, 2, 3. NA 0 lg SUPERVISOR DATE ____ DEPT. HEAD DATE r NU: NUCLEAR CLASS 1. 2. 3. NA c .p-* IE CLASS 1 E ELECTRICAL EQUIP. NA z 10CFR21 APPLIES' Y-YES N*NO s:
.. QA, 1 *SAFETY-REL.IQ/I PROVISIONS m SPONSOR ENG. DATE 2
- NON-SAFFTV-AEL./OA PROVISIONS J COMMERCIAL CATALOG llEM 4 *NON SAFETY-AEL./NO QA PROVISIOl'JS SOAE DATE OAD DATE 0 :IJ )> )> rn --l --l .< --l m * )> 0 n REO. NO. LOCAt P. 0. NO. BLANKET REO NO. P.O. NO .....i. I --" -.,, rn )> 7 .......
AP'*l ... 1 ......... , .....i. G --l N rn z OFFICE ........ _, 0 en --" ['. 0 *n --" I *---* ________ ) -*------------
... ***-*---------***--