MONTHYEARML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 ML18102B6081997-10-0606 October 1997 Proposed Tech Specs Revising LCOs 3.1.3.1, Movable Control Assemblies & 3.1.3.2.1, Position Indication Sys. ML18102B5571997-08-27027 August 1997 Proposed Tech Specs,Providing Revised TS Bases Pages for TS 3.7.3, CCW Sys, Which States That Three CCW Pumps Required to Meet LCO ML18102B5301997-08-19019 August 1997 Proposed Tech Specs,Providing Addl Operational Flexibility to Allow Orderly Resumption of Startup & Preclude Unwarranted Power Transients at Salem Unit 2 ML18102B5341997-08-18018 August 1997 Proposed Tech Specs,Incorporating Plant Computer (P-250) Into TS Bases for Movable Control Assemblies ML18102B4891997-08-0101 August 1997 Proposed Tech Specs Section 4.2.1 Rewording Section to State Util Will Adhere to Section 7,Incidental Take Statement Approved by Natl Maring Fisheries Svc ML18102B3911997-06-12012 June 1997 Proposed Tech Specs,Representing Addition of New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B3061997-05-14014 May 1997 Proposed Tech Specs,Revising SR 4.7.6.1.d.1,to Indicate That Specified Acceptable Filter Dp Is to Be Measured Across Filter Housing & Reflecting Filter Dp Acceptance Value Greater than 2.70 Water Gauge ML18102B2631997-05-0101 May 1997 Proposed Tech Specs,Adding New Spec 3/4.7.10, Chilled Water Sys - Auxiliary Bldg Subsystem. ML18102B2601997-05-0101 May 1997 Proposed Tech Specs 3/4.7.7 Revising Certain Allowed Outage Times & Creating 3/4.7.11 to Address Switchgear & Penetration Area Ventilation Sys ML18102B0341997-04-25025 April 1997 Proposed Tech Specs 3.5.2 Eliminating Flow Path from RHR Sys to RCS Hot Legs as Specified in LCO 3.5.2.c.2 1999-08-25
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML18107A5291999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 18 to Table of Contents,Rev 10 to Attachments 6 & 7 & Rev 11 to Attachment 9 ML20211Q8771999-08-27027 August 1999 Rev 0 to Inservice Testing Manual for Pumps & Valves Program ML18107A5171999-08-25025 August 1999 Marked-up Tech Spec Pages Deleting Footnotes That Were Added as One Time Changes & Proposing Change Identified Subsequent to 971114 Submittal That Corrects Error Issued in Amend 69 for Salem Unit 2 ML18107A5121999-08-23023 August 1999 Procedure 71151, Performance Indicator Verification. ML18107A5091999-08-23023 August 1999 Attachment 21 to Procedure 71111, Safety Sys Design & Performance Capability. ML18107A4961999-08-23023 August 1999 Proposed Tech Specs,Modifying 3/4 7.7, Auxiliary Bldg Exhaust Air Filtration Sys. ML18107A4671999-07-29029 July 1999 Proposed Tech Specs Replacing Surveillance 4.6.1.1a with Appropriate NUREG-1431 Requirements ML18107A4601999-07-23023 July 1999 Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown ML18107A4241999-07-0202 July 1999 Proposed Tech Specs,Relocating TS 3/4.3.4 Lco,Surveillance Requirements & Bases from TS to UFSAR ML18107A3811999-06-10010 June 1999 Proposed Tech Specs 3/4.6.1, Containment Integrity, Clarifying When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML18107A2961999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 16 to Table of Contents,Rev 8 to Attachment 6,rev 8 to Attachment 7 & Rev 9 to Attachment 9 ML18107A2131999-04-14014 April 1999 Proposed Tech Specs 3/4.9.12, Fhavs, Revised to Ensure Consistency Between TS Requirements for Fhavs & Sys Design Basis,As Well Better Alignment to Bases Provided in NUREG-1431 ML18106B1591999-03-31031 March 1999 Proposed Tech Specs Allowing Plant Operation to Continue to Thirteenth Refueling Outage (1R13),currently Scheduled to Begin on 990918 ML18106B0801999-02-22022 February 1999 Proposed Tech Specs Re CR Emergency Air Conditioning Sys ML18106B0641999-02-0808 February 1999 Proposed Tech Spec Pages,Modifying ECCS Subsystems Surveillance 4.5.3.2.b by Adding Option of Providing Necessary Isolation Function When Testing ML18106B0611999-02-0808 February 1999 Proposed Tech Specs SR 4.8.1.1.2.f Re Hot Restart & Definition of Standby Conditions. ML18106B0531999-02-0202 February 1999 Proposed Tech Specs 5.6.1.1,revising Max Permissible Enrichment of Stored New Fuel ML18106B0431999-01-19019 January 1999 Proposed Tech Specs Bases Section 3/4.1.2 Re Boration Sys ML18106B0241999-01-15015 January 1999 Proposed Tech Specs Re Deferral of Surveillance Requirements for Salem Generating Station,Unit 1 ML18106A9231998-10-12012 October 1998 Proposed Tech Specs Re Inserts & Marked Up Pages for LCR S98-03 ML18106A9181998-10-12012 October 1998 Proposed Tech Specs Re one-time Changes to Certain Unit 2 TS SR for Fuel Cycle 10 ML18106A8941998-09-29029 September 1998 Proposed Tech Specs Section 3/4.9.2,modified to Permit Use of Equivalent Methods to Obtain Containment Closure During Refueling Operations for Containment Equipment Hatch ML18106A8781998-09-17017 September 1998 Proposed Tech Specs Modifying 3/4.8.2.2,3/4.8.2.4 & 3/4.8.2.6 to Address Movement of Irradiated Fuel & Deleting LCO Re Requirement to Establish Containment Integrity ML18106A8371998-08-12012 August 1998 Proposed Tech Specs Modifying Allowed Continued Operation W/Inoperable Air Lock Door Provided That Operable Door Is Closed & Unlocked & Making Requirements for Inoperable Air Lock Door ML18106A7931998-07-30030 July 1998 Proposed Tech Specs,Revising Acceptance Criteria for CR Emergency Air Conditioning Sys from Maintaining CR at 1/8-inch Positive Pressure W/Respect to Adjacent Areas to Stated Phrase ML18106A6961998-07-0707 July 1998 Proposed Tech Specs Section 4.2.1 Re Aquatic Monitoring of App B for Environ Protection Plan ML18106A6631998-06-17017 June 1998 Proposed Revised Tech Specs Bases Pages 3/4.1.3,3/4.1.2, 3/4.5.5 & 3/4.9.1,ensuring Acceptable Power Distribution Limits Are Maintained,Providing Operational Flexibility & Clarifying Statements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML18106A5571998-04-16016 April 1998 Rev 21 to EOP-CFST-1, Shutdown Margin Status Tree & Rev 10 to Table of Contents ML20239A1251998-03-31031 March 1998 Rev 11 to Salem Nuclear Generating Station Odcm ML18106A4241998-03-26026 March 1998 Proposed Tech Specs Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters. ML18106A4291998-03-26026 March 1998 Proposed Tech Specs,Changing Applicability Statement from Mode 3 to Modes 1 & 2 ML18106A3921998-03-13013 March 1998 Rev 9 to ECG-SECG-TOC & Rev 2 to ECG-ATT.04, General Emergency. ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML18106A3221998-02-18018 February 1998 Marked-up TS Pages for Section 4.2.1 of App B ML18106A3091998-02-0202 February 1998 Revised TS Bases Pages for Specs 3/4.3.3.1,radiation Monitoring instrumentation,3/4.3.3.8,radioactive Liquid Effluent Monitoring Instrumentation & 3/4.3.3.9,radioactive Gaseous Effluent Monitoring Instrumentation ML18106A2541998-01-0808 January 1998 Proposed Tech Specs Pages,Adding Asterisk to Word Operable in LCO & Associated Note at Bottom of Page ML18106A2141997-12-15015 December 1997 Proposed Tech Specs Pages,Revising TS to Adopt Option B to 10CFR50,App J,For Type B & C Testing & Modify Existing TS Wording for Previous Adoption of Option B on Type a Testing ML18106A1961997-12-11011 December 1997 Proposed Tech Specs Re one-time Exemption to Allow Containment Purging in Modes 3 & 4 ML18102B6791997-11-14014 November 1997 Proposed Tech Specs Providing Surveillance Requirements to Codify Existing Procedural Commitments for SW Accumulator Vessels ML18102B6751997-11-14014 November 1997 Proposed Tech Specs Re Administrative & Editorial Corrections ML18102B6591997-11-0404 November 1997 Proposed Tech Specs,Revising Surveillance Requirement 4.6.2.1.b to Verify That on Recirculation Flow,Containment Spray Pumps Develop Differential Pressure of Greater than or Equal to 204 Psid ML18102B6631997-11-0404 November 1997 Proposed Tech Specs,Deleting 4.8.1.1.2.d.1,which Calls for Diesels to Be Subjected to Insp Based on Vendor Recommendations at Least Once Per 18 Months During Shutdown ML18102B6431997-10-29029 October 1997 Proposed Tech Specs Revising SR 4.8.1.1.2.d.2 Proposed in 960925 Request to Change EDG Voltage & Frequency Limits as Result of Updated EDG Load Calculations & Ambiguity in Testing Methodology for EDG Start Timing ML18102B6391997-10-29029 October 1997 Proposed Tech Specs Changing SG Insp Schedule to Require Next Insp within 24 Months of Mode 2 for Unit 2 Fuel Cycle 10 ML18102B6491997-10-24024 October 1997 Proposed Tech Specs Pages,Modifying TS 3/4.7.7, Auxiliary Building Exhaust Air Filtration Sys & Bases ML18102B6461997-10-24024 October 1997 Proposed Tech Specs Revising Containment Hydrogen Analyzer SRs of TS 4.6.4.1 ML18102B6321997-10-21021 October 1997 Proposed Tech Specs,Extending Applicability of Power Range Neutron Flux TS Trip to Require Operability & Surveillance Testing in Mode 3,when Reactor Trip Sys Breakers Are in Closed Position ML18102B6201997-10-14014 October 1997 Proposed Tech Specs Modifying Pressure Isolation Valves LCO, LCO Action Statement,Surveillance Requirement & Table 4.4-4 to Be Consistent W/Salem Unit 2 1999-09-10
[Table view] |
Text
ELECTRICAL PQWER SYSTEMS i\)0 fa. -rtz0
-:r;r1 +0 0 11 ly. SURVBILLANCB REQUIREMENTS (Continued)
- d. At lea*t once per 18 months during shutdown by: 1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with it* manufacturer'*
recommendations for this cla** of standby service, 2. Verifyinq that, on rejection of a load greater than or equal to 820 kw, the voltage and frequency are restored to 3950 and s 4580 volt* and 60 +/- 1.2 Hz within 4 **cond*. 3. Simulating a lo** of off*ite power by it**lf, and: a) Verifying de-energization of the vital bus and load shedding from the vital bus. b) Verifying the die*el atart* on the auto-*tart
the vital bu* with permanently connected load* within 13 second*, energizes th* auto-connected
- hutdown loada through the load *equencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with th* ahutdown load*. Th* *t*ady *tat* voltaqo and frequency of the vital bus *hall be maintained at 3950 and S 4580 volt* and 60 +/- 1.2 Hz during thi* te*t. 4. Verifying that on an ESF actuation te*t *ignal without lo*** of off nite power the diesel generator start* on the auto-start signal and operate* on *tandby for greater than or equal to 5 minutes*.
The generator voltage and frequency shall be 3950 and 4580 volts and 60 +/- 1.2 Hz within 13 second* after the auto-start signal and shall b* maintained within these limita during thia test. 5. Not U*ed. 6. Simulating a lo** of offaite power in conjunction with an ESF actuation te*t *ignal, and: _A;)_ Verifying de-energization of the vital bu* and load shedding _,.,.,.,_
-from the vital bu*. b) Verifying the diesel starta on the auto-*tart
the vital bu* with permanently connected loads within 13 **cond*, energizes the auto-connected emergency (accident) load* through the load *equencer and operate* for greater than or equal to 5 minute* while it* generator i* loaded with the emergency load*. Tho steady state voltage and frequency of the vital bu* *hall be maintained at 3950 and S 4580 volts and 60 +/- 1.2 Hz during this test.
9404250253 940412 . 1 PDR ADOCK 05000272 I P PDR SALEM -UNIT 1 3/4 8-4 Amendment No. 148 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) c) Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overspeed, lube oil pressure low, 4 KV bus differential and generator differential), are automatically bypasaed upon loss of voltage on the vital bus concurrent with a safety injection actuation signal. 7. Verifying the diesel generator operates for at least 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*. During the first 2 hour* of this teat, the diesel generator shall be loaded to 2760-2860 kw.** During the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this teat, the diesel generator shall be loaded to 2500-2600 kw*** The steady state voltage and frequency shall be maintained at 3950 and 4580 volts and 60 +/- 1.2 Hz during this te*t. Withia 5 miautea after thi* 24 haur test, perfeJ:'lll Sur?eillaaee 4.a.1.1.2.a.6.e."'
- 8. Verifying that the auto-connected load* to each diesel generator do not exceed the two hour rating of 2860 kw. 9. Verifying that with the diesel generator operating in a teat mode (connected to its bus), a aafety injection signal overrides the test mode by (1) returning the diesel generator to standby operation and (2) automatically energizing the emergency load* with offsite power. e. At least once per ten years or after any modifications which could diesel generator interdependence by starting all diesel generators simultaneously*, during shutdown, and verifying that all diesel generator*
accelerate to at least 900 rpm in le** than or equal to 10 seconds. 4.8.1.l.3 The diesel fuel oil storage and transfer system shall be demonstrated OPERABLE:
- a. At leaat once per 31 days by: affect 1. Verifying the level in each of the above required 20,000 gallon fuel *torage tanks. 2. Verifying that both fuel transfer pump* can be started and transfer fuel from the 20,000 gallon storage tanks to the day tank*. b. At leaat once per 92 days by verifying that a sample of diesel fuel from each of the above required 20,000 gallon fuel storage tanks is within the acceptable limit* specified in Table 1 of ASTM 0975-77 when checked for viscosity, water and sediment.
SALEM -UNIT 1 3/4 8-5 Amendment No. 3 Insert 1 f. At least once per 18 months, the following test shall be performed within 5 minutes of diesel shutdown after the diesel has operated for at least one hour at 2500-2600 kw**: Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*.
The generator voltage and frequency shall be 3950 volts and 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.
ELECTRICAL POWER SYSTEMS SURVBILLANCB REQUIREMENTS (Continued) 4.8.1.1.4 Report1 -All diesel generator failures, valid or non-valid, shall be reported to the Comni*nion in a Special Report pursuant to Specification
6.9.2 within
30 day*. Report* of di***l generator failures ahall include the information recommended in Regulatory Poaition c.3.b of Regulatory Guide l.108, Revision 1, Augu*t 1977. If the number of failure* in the last 100 valid te*t* (on a P9r nuclear unit ba*i*) i* greater than or equal to 7, the report *hall be *upplemented to include the additional information recommended in Regulatory Po*ition C.3.b of Regulatory Guide 1.108, Revi*ion 1, August 1977.
- Surveillance t**ting shall be conducted in accordance with the manufacturer's recommendation*
regarding engine prelube, warm-up and loading (unl*** loading time* are *pecifiad in the individual Surveillance Requirement*)*
i* meant a* guidance to preclude routine exceedances of th* di-..l 9enerator manufacturer'*
design rating*. Loada in excess ot band for *pecial te*ting or momentary variation*
due to changing bu* loada aball not invalidate the ta*t. *** FailYr* ef a per R*Cf'lirmnenc 4.S.1.1.3.d.6.b, follel'lillAq pepfe ... anee ef Re'f'l!ireme!K 4,s,1.1.2.&.7, deee that the 24 heQr tent ef 4,a,1.1,2.d.7 be A* an aleernatt***
the EgG shall be loaded to 2500-2600 kw fgr gna hoYr, or YACil have staeilieed, prier te repeatinq SQrveillanse Reqwlr .. 4,s.1.1.2.d.&.e.
SALEM = UNIT 1 3/4 8-Sa Amendment No.
ELEC'.rRIC1\L POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) f\Jc?J d'a11s9 +o ftt 1'5 f q e --;:-11 -F-o 0 YI I y.
- d. At l***t onee per lS months during shutdown by: 1. Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer'*
recommendations for this cl&** of standby uervice, 2. Verifying that, on rejection of a load of greater than or equal to 820 kw, the voltage and frequency are re*tored to 3950 and s 4580 volt* and 60 +/- 1.2 Hz within 4 seconds. 3. Simulating a lo** of offsite power by it**lf, and: a) Verifying de-energiz&tion of the vital bu* and load shedding from the vital bus. b) Verifying the diesel starts on the auto-*tart uignal*, energize*
the vital bu* with permanently connected loads within 13 ueconde, energizes th* auto-connected
- hutdown loads through the load sequencer and operate* for greater than or equal to 5 minutes while its generator i* loaded with the shutdown load*. The steady *tat* voltage and frequency of the vital bus shall be maintained at 3950 and s 4580 volt* and 60 + 1.2 Hz during thiu te*t. 4. Verifying that on an ESF actuation test signal without loss of offsite power the diesel generator start* on the auto-start signal and operate* on standby for greater than or equal to 5 minutes*.
The generator voltage and frequency uhall be 3950 and S 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the auto-start signal and shall be maintained within these limit* during this test. 5. Deleted 6. Simulating a los* of offuite power in conjunction with an ESF actuation t**t signal, and a) Verifying de-energization of the vital bus and load shedding from the vital bus. b) Verifying the diesel starts on the auto-utart signal*, energize*
the vital bus with permanently connected loads within 13 *econds, energizeu the auto-connected emergency (accident) load* through the load sequencer and operates for greater than or equal to 5 minute* while it* generator ie loaded with the emergency loads. The steady state voltage and frequency of the vital bu* shall be maintained at 3950 and S 4580 volts and 60 +/- 1.2 Hz during this test. SALEM -UNIT 2 3/4 8-4 Amendment No. 126
POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) c) Verifying that all nonessential automatic diesel generator trip* (i.e., other than engine overspeed, lube oil pressure low, 4 KV Bus differential and generator differential) are automatically bypassed upon lo** of voltage on the vital bus concurrent with a aafety injection actuation signal. 7. Verifying the diesel generator operate* for at least 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*. During the first 2 hour* of thi* teat, the diesel generator shall be loaded to 2760-2860 kw*** During the remaining 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the dieael generator
- hall be loaded to 2500-2600 kw*** The steady *tat* voltage and frequency shall be maintained at 3950 and S 4580 volt* and 60 +/- 1.2 Hz during this test. Within 5 minutes after oomplecinq chi*
t**c, perform Speoifioacion 4.8.1.1.2.d.6.b.***
- 8. Verifying that the auto-connected loads to each diesel generator do not exceed the two hour rating of 2860 kw. 9. *Verifying that with tho die*el generator operating in a test mode (connected to its bus), a *imulated safety injection signal override*
the test mode by (1) returning the diesel generator to standby operation and (2) automatically energizing the emergency loads with offsite power. e. At least once per 10 year* or after any modifications which could affect di***l generator interdependence by starting all diesel generators aimultaneou*ly*, during shutdown, and verifying that all diesel generator*
accelerate to at lea*t 900 rpm in l*** than or equal to 10 second&. 4.8.1.1.3 The diesel fuel oil storage and transfer system shall be demon*trated OPERABLE:
- a. At l*a*t once per 31 days by: 1. Verifying the level in each of the above required 20,000 gallon fuel *torage tanks. 2. Verifying that both fuel tranafer pump* can be atarted and tran*f*r fuel from th* 20,000 gallon storage tanks to the day tank*. b. At lea*t once per 92 days by verifying that a sample of diesel fuel from each of the above required 20,000 gallon fuel storage tanks i* within the acceptable limits specified in Table 1 of ASTM 0975-77 when checked for viscosity, water and sediment.
SALEM -UNIT 2 3/4 8-5 Amendment No. 126 Insert 1 f. At least once per 18 months, the following test shall be performed within 5 minutes of diesel shutdown after the diesel has operated for at least one hour at 2500-2600 kw**: Verifying the diesel starts and accelerates to 900 rpm in less than or equal to 10 seconds*.
The generator voltage and frequency shall be L 3950 volts and 5 4580 volts and 60 +/- 1.2 Hz within 13 seconds after the start signal.
- ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
' 4.8.1.1.4 Report* -All diesel generator failures, valid or non-valid, shall be reported to the Commission in a Special Report pursuant to Specification
6.9.2 within
30 day1. Reports of diesel generator failures shall include the information recommended in Regulatory Position C.3.b of Regulatory Guide 1.108, Revision 1, Augu1t 1977. If the number of failures in the last 100 valid te1t* (on a per nuclear unit ba*i*) i* greater than or equal to 7, the report shall be supplemented to include the additional information reconunended in Regulatory Po*ition C.3.b of Regulatory Guide 1.108, 1, Augu*t 1977.
- Surveillance testing shall be conducted in accordance with the manufacturer'*
recommendations regarding engine prelube, warm-up and loading (unle** loading time* are *pacified in the individual Surveillance Requirements).
- Thia band i* meant aa guidance to preclude routine exceedances of the die .. 1 generator manufacturer'*
design ratings. Loada in excess of this band for *pecial testing or momentary variation&
due to changing bus load* *hall not invalidate the te*t. *** Failure of a tent per Surveillanee Raqyirement 4.8.1.1.2.d.&.b, fellei1iRg perfermaaee of Surreillanee Requirement 4.8.1.1.2.d.?, does not require ehae the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> tese of 4.8.1.1.2.d.7 ee repeated.
A* an alternative, the EDG shall be leaded to 2§00 2500 kw fer one hour, or until operatiRg temperatYre1 have atabilimed, prier to repeatinq SYrveillanse 4.8.1.1.2.d.6.b.
SALEM -UNIT 2 3/4 8-6 Amendment No. 126