NRC 2006-0020, Point Beach, Units 1 and 2 - Fitness-For-Duty (FFD) Program Report

From kanterella
Revision as of 02:16, 29 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Point Beach, Units 1 and 2 - Fitness-For-Duty (FFD) Program Report
ML060450467
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/07/2006
From: Koehl D L
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
FOIA/PA-2006-0113, NRC 2006-0020
Download: ML060450467 (4)


Text

sSM NM Committed to Nuclear Excell February 7, 2006 Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2006-0020 10 CFR 26.71 (d)U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 And 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Fitness-For-Duty (FFD) Program Report In accordance with 10 CFR 26.71 (d), enclosed is Point Beach Nuclear Plant Fitness-for-Duty performance data for the! six-month period ending December 31, 2005.This letter contains no new commitments and no revisions to existing commitments.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region l1l, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6610 Nuclear Road

920.755.2321 ACCD1 Fitness for Duty Program Performance Data Personnel Subaect to 1 0 CFR 26 Nuclear Management Company, LLC (NMC)Company December 31, 2005 6 Months Ending Point Beach Nuclear Plant, Units I and 2 Location Don Popp Contact Name (920) 755-7756 Phone (include area code)Cutoffs: Screen/Confirmation (ng/ml)0 Appendix A to 10 CFR 26 Marijuana Cocaine Opiates l Amphetamines Phencyclid ine Alcohol (% BAC)l l I Testing Results Licensee Employees Contractor Personnel Average Number with 774 340 Unescorted Access Categories Tested Positive Tested Positive Pre-Access 24 0 572 3 Post accident 1 0 0 0 For Cause Observed 3 1 3 0 behavior Random 222 0 82 0 Follow-up 52 0 23 0 Other 0 0 0 0 Total 302 1 680 3 Random test rate for the semi-annual period ending 12/31/05 54%

I Breakdown of Confirmed Positive Tests for Specific Substances

_ _ Marijuana Cocaine Opiates Methamphetamines l Phencyclidine Alcohol I Refusal 1 l 2 3 l 4 l 5 Licensee 000 0 0 0 0 0 1Io iI 0i 00 0 Employees Contractors 2 0 00 0 1 0 t0 0 0 0 0 Total 2 10 0 1 0 1 0 1 2 1 0 1010 0 1* One contractor employee tested positive for alcohol on a pre-access drug/alcohol test. The contractor employee was denied access. The contractor employee was provided the opportunity to appeal the denial through the NMC appeal process. The contractor employee requested to have a blood alcohol test completed.

Results of the blood test confirmed the positive alcohol results.* Two contractor employees tested positive for marijuana on a pre-access drug/alcohol test. The contractor employee was denied access. The contractor employees were provided the opportunity to appeal the denial through the NMC appeal process. There were no appeals.* One licensee employee tested positive for alcohol on a for-cause drug/alcohol test. The licensee employee was denied access. The licensee employee was granted unescorted access after satisfactory management and medical assurance was obtained regarding the individual's fitness-for-duty.

Reportable Events Point Beach Nuclear Plant reported one event as required by 10 CFR Part 26.73(a) during the period. On September 30, 2005, at 1459 (EST), a 24-hour FFD event report (EN 42030) was made in accordance with 10 CFR 26.73(a)(2)(ii).

bcc: R. Cleveland D. L. Koehl[). C. Popp F. D. Kuester (P460)D. A. Weaver (P346)E. J. Weinkarn File