NRC 2006-0020, Fitness-For-Duty (FFD) Program Report
| ML060450467 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 02/07/2006 |
| From: | Koehl D Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2006-0113, NRC 2006-0020 | |
| Download: ML060450467 (4) | |
Text
sSM NM Committed to Nuclear Excell February 7, 2006 Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC NRC 2006-0020 10 CFR 26.71 (d)
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 And 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Fitness-For-Duty (FFD) Program Report In accordance with 10 CFR 26.71 (d), enclosed is Point Beach Nuclear Plant Fitness-for-Duty performance data for the! six-month period ending December 31, 2005.
This letter contains no new commitments and no revisions to existing commitments.
Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC Enclosure cc:
Administrator, Region l1l, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC 6610 Nuclear Road
- Two Rivers, Wisconsin 54241-9516 Telephone: 920.755.2321 ACCD1
Fitness for Duty Program Performance Data Personnel Subaect to 1 0 CFR 26 Nuclear Management Company, LLC (NMC)
Company December 31, 2005 6 Months Ending Point Beach Nuclear Plant, Units I and 2 Location Don Popp Contact Name (920) 755-7756 Phone (include area code)
Cutoffs: Screen/Confirmation (ng/ml) 0 Appendix A to 10 CFR 26 Marijuana Cocaine Opiates l
Amphetamines Phencyclid ine Alcohol (% BAC) l l
I Testing Results Licensee Employees Contractor Personnel Average Number with 774 340 Unescorted Access Categories Tested Positive Tested Positive Pre-Access 24 0
572 3
Post accident 1
0 0
0 For Cause Observed 3
1 3
0 behavior Random 222 0
82 0
Follow-up 52 0
23 0
Other 0
0 0
0 Total 302 1
680 3
Random test rate for the semi-annual period ending 12/31/05 54%
I Breakdown of Confirmed Positive Tests for Specific Substances Marijuana Cocaine Opiates Methamphetamines l Phencyclidine Alcohol I Refusal 1 l 2 3 l 4 l 5 Licensee 000 0
0 0
0 0
1Io iI 0i 00 0
Employees Contractors 2
0 00 0
1 0
t0 0 0 0 0 Total 2
10 0
1 0
1 0
1 2 1 0 1010 0
1
- One contractor employee tested positive for alcohol on a pre-access drug/alcohol test. The contractor employee was denied access. The contractor employee was provided the opportunity to appeal the denial through the NMC appeal process. The contractor employee requested to have a blood alcohol test completed. Results of the blood test confirmed the positive alcohol results.
- Two contractor employees tested positive for marijuana on a pre-access drug/alcohol test. The contractor employee was denied access. The contractor employees were provided the opportunity to appeal the denial through the NMC appeal process. There were no appeals.
- One licensee employee tested positive for alcohol on a for-cause drug/alcohol test. The licensee employee was denied access. The licensee employee was granted unescorted access after satisfactory management and medical assurance was obtained regarding the individual's fitness-for-duty.
Reportable Events Point Beach Nuclear Plant reported one event as required by 10 CFR Part 26.73(a) during the period. On September 30, 2005, at 1459 (EST), a 24-hour FFD event report (EN 42030) was made in accordance with 10 CFR 26.73(a)(2)(ii).
bcc:
R. Cleveland D. L. Koehl
[). C. Popp F. D. Kuester (P460)
D. A. Weaver (P346)
E. J. Weinkarn File