ML051460517
| ML051460517 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 04/23/2004 |
| From: | Nuclear Management Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| CAP055986, FOIA/PA-2004-0282 | |
| Download: ML051460517 (1) | |
Text
TeamTrack Reports NMC >t si> Polnt Beach - Actlon Request ?Corrective Actn Program (CAP) AR Section 1 Activity Reques Id:
CAP055986 Activity.Type:
CAP Submit Date:
@ One.lIne 6escriptilon:
Evaluate use of RP Greeter at Containment hatches durinc Z, Detailed
Description:
4/2312004 11:18:23 AM -THOMAS, STU:
During a region IiI NRC RP inspection, the Inspector comrr plahts usirlg ah RPT as a greeter at the containment hatch radworkers prior to enter ng.containment to ensure proper 1 RWP, and direction with whom to check in with from RP in commented at the exit by the site's senlor resident lnsiectc through out this outage, we could have potentially prevente IfidiYdual receive a dose' alarm while working in containme Initiator THiOMAS, STU inItiatorDepartment:
Datelime of Discovery: 412312004 1 i:09:42
.DatelTime of Occurrence:
AM Identified By:
mRd System:
EqUIpment # (1st):
'(Ndn)
Equilpmlenit Type (1st):
Equipmrent #(2nd):
(None)
Equipment Type (2nd):
Equlpmeht # (3rd):
(None)
Equlpmnent Type (3rd):
Site/Unit:
Potnt Beach -
Common Why did this occur?:
il3I004 11:18:23 Al.-THOMAS, STU:
pot ritaivyUiised.1'effl.
be'iehnc arklnp. INPO also bWntlj'~rlg-tih B. b,e~st, p,~r'f~oiner'n f
industry.
Immediate Action TaIfen: 412312004 11:18:23AM -THOMAS. STU:
Wrte AR..
Recommendations:
4123/2004 11;18.23 AM -THOMAS, STU:
Peform a -condition evaluation, Page 2o£5 412312004 11:18:23 AM I outage periods-iented that he Is used to seeing other es. The greter typlcally challenges dresisPut; proper':iosimetry, proper
- Ide containment Itwas.further or, that If we'd hiale had this In place ed the.rad event of having an ent'on a PAB RWP.
PR Radiation Protection PB I I
4/2312004 11:09:42 AM (Nonej (Nobne)
- (None)
(None)
D note'd that RP was not effectively Wl Notify Me During Eval?:
Section 2 Operability Status:
Basis for Operability:
Develop guldance and station indfividual at the 66' hatch entrance.
Share thl AR wIth NMCfileet RPMs during weekly RPM phone call.
N 1 SRO ReYlow Required?:
N NA b Compensatory Actions:
N 4/2312004 2:16:02'PM - RASACH, DEAN:
This Is a suggestion f6r.site Improvement. This issue does not affect the operability of Systems.
Slructures, or Components related to safety.
N CI External Notification:
N
'§ Unplanned TSAC Entry: