ML13193A032
From kanterella
Jump to navigation
Jump to search
ML13193A032 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 07/11/2013 |
From: | NRC/RGN-III/DRMA |
To: | |
References | |
EA-13-125, IR-13-011, NRC 2013-0054 | |
Download: ML13193A032 (28) | |
Similar Documents at Point Beach | |
---|---|
Category:Note
MONTHYEARML13193A0322013-07-11011 July 2013
[Table view]Additional Equipment Height Information with Vulnerability to Flood Waters ML0832308202008-11-20020 November 2008 Teleconference Summary Regarding the 2008 Steam Generator Tube Inspection Results ML0816908552008-07-0202 July 2008 Telconference Summary Regarding Point Beach Nuclear Plant Proposed Power Uprate and Alternate Source Term Amendment ML0515202522005-05-24024 May 2005 2SI 825B Not Full Open ML0514604102005-05-24024 May 2005 Exit Notes - Holmberg, Riii, Bilik, Riii ML0514604122005-05-24024 May 2005 Exit Notes Holmberg, Riii ML0514604162005-05-24024 May 2005 Exit Notes Pederson, Riii, Holmberg, Riii, Bilik, Riii ML0514700762005-05-24024 May 2005 Note from Individual with 05/27/2004 E-Mail from J. Petrosino, NRR, to H. Heller, Riii ML0515201462005-05-24024 May 2005 Sludge Lance and Phone Line Through Containment Hatch While Fuel Movement in Progress ML0515201512005-05-24024 May 2005 Gas Turbine Reliability Not Meeting FSAR Requirements ML0515202122005-05-24024 May 2005 Questions and Notes ML0515202552005-05-24024 May 2005 Rio Entry 191 Note ML0515202562005-05-24024 May 2005 Outage Stand Down Observations ML0515202602005-05-24024 May 2005 Handwritten Notes ML0508800462005-03-22022 March 2005 Notes for Entrance Meeting ML0508400652005-03-21021 March 2005 Briefing Notes for RCS Vent Path Issue ML0505601182005-02-24024 February 2005 Letter from M. Lintz to File Transmitting e-mail to Point Beach Nuclear Plant ML0502701212005-01-25025 January 2005 Summary of Telephone Conference Held on January 05, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502606992005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502602372005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, Llc, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502602472005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502603192005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502603592005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502606362005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0502700372005-01-19019 January 2005 Summary of Telephone Conference Held on January 14, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, ML0502700462005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Draft Requests for Additional Information Pertaining to the Point Beach Nuclear ML0502604732005-01-19019 January 2005 Summary of Telephone Conference Held on January 10, 2005, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC, Concerning Requests for Additional Information Pertaining to the Point Beach Nuclear Plant, Units ML0500601672004-12-16016 December 2004 Summary of Telephone Conference Held on December 15, 2004, Between the U.S. Nuclear Regulatory Commission and Nuclear Management Company, LLC Concerning Draft Requests for Additional Information Pertaining to the Point Beach, Units 1 & 2... ML0430206312004-10-28028 October 2004 Summary of Conference Call with Nuclear Management Company, LLC (NMC) to Discuss Responses to the Severe Accident Mitigation Alternatives (SAMA) Requests for Additional Information (Rais) ML0414602652004-08-0909 August 2004 Summary of Scoping & Screening Group Methodology Audit Preparation Visit Between the NRC & NMC -Concerns Receipt of Requested Staff Documentation for Audit Preparation for the Point Beach Nuclear Plant, Units 1 & 2, LRA ML0515204662004-08-0404 August 2004 Outage Inspection Notes ML0414203162004-05-21021 May 2004 Handwritten Comment Handed to Point Beach Resident Inspector from Cassandra Dixon ML0412801022004-05-0606 May 2004 Note 05/06/2004 to All Region III Facility Training Managers Re Reprint of NRC Form 396 ML0508700512004-04-19019 April 2004 Note to U1R28 Shift Outage Managers from Sr. Management Representative, Work Prior to and During Outage Briefing ML0508700502004-04-19019 April 2004 Shift Outage Manager - Days ML0402300912004-02-10010 February 2004 Memo to File Re Facsimile Transmission for Issue Discussed in Telephone Conference ML0308005832002-11-22022 November 2002 1 Page of Handwritten Notes ML0626801962002-07-0303 July 2002 Note to J. Heller from M. Kunowski (Rill) Re Kewaunee and Point Beach Plants ML0627904142002-06-27027 June 2002 Typed Notes of Phone Call Conversation with Lynn Bartleme, Dznps at Point Beach ML0627903882002-02-23023 February 2002 Individual Interview Regarding Fitness-for-Duty Concern at Kewaunee During a Refuel Outage in 2001 ML0626405682001-11-12012 November 2001 Note to Allegation File from J. Heller, Telephone Contact with Al Capristo, Nuclear Management Company. ML0626801922001-11-0808 November 2001 Note to: USNRC Region III from Anonymous with Handwritten Notes 2013-07-11 Category:Report MONTHYEARL-2023-089, Refueling Outage Owners Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023
[Table view]Refueling Outage Owners Activity Report (OAR-1) Unit 2 for Inservice Inspections L-2023-028, And Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 And Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-168, And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2022-10-0404 October 2022 10 CFR 50.59 Evaluation and Commitment Change Summary Report L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-022022-07-29029 July 2022 Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 ML22140A1352022-05-20020 May 2022 RPS Instrumentation ML22140A1442022-05-20020 May 2022 Enclosure 8 - Attributes of the Configuration Risk Management Model NRC 2022-0007, Enclosure 11 - Monitoring Program2022-05-20020 May 2022 Enclosure 11 - Monitoring Program ML22140A1332022-05-20020 May 2022 Attachment 1 - Evaluation of the Proposed Changes ML22140A1432022-05-20020 May 2022 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models ML22140A1422022-05-20020 May 2022 Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information ML22140A1362022-05-20020 May 2022 Containment Isolation Valves ML22140A1382022-05-20020 May 2022 Containment Isolation Valves ML22140A1412022-05-20020 May 2022 Attachment 6 - Point Beach RICT Program Pre-Implementation Items ML22140A1402022-05-20020 May 2022 Attachment 5 - Evaluation of Plant-Specific Variations ML22140A1392022-05-20020 May 2022 Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes ML21214A0432021-08-0202 August 2021 SLRA June 30, 2021, Public Meeting Discussion Questions ML21126A2392021-05-0606 May 2021 Subsequent License Renewal Application, Aging Management Supplement 2 ML21040A4842021-02-0909 February 2021 Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project ML21040A4852021-02-0909 February 2021 Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report ML21008A0172020-10-25025 October 2020 Revised ANS Design Report NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure2019-08-29029 August 2019 Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2019-01-24024 January 2019 Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2018-05-0202 May 2018 10 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-022017-12-29029 December 2017 Updated Final Response to NRC Generic Letter 2004-02 NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report NRC 2017-0032, Focused Evaluation for Local Intense Precipitation2017-06-22022 June 2017 Focused Evaluation for Local Intense Precipitation ML17136A3222017-05-19019 May 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 ML17018A2712017-02-0909 February 2017 Flood Hazard Mitigation Strategies Assessment NRC 2016-0041, Submittal of 10 CFR 50.59 Summary Report for 20152016-08-31031 August 2016 Submittal of 10 CFR 50.59 Summary Report for 2015 NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan2015-12-16016 December 2015 Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan ML15300A1402015-11-0303 November 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15211A5932015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force NRC 2015-0043, Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 10072015-07-20020 July 2015 Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 NRC 2014-0041, 10 CFR 50.59 Summary Report for 20132014-08-27027 August 2014 10 CFR 50.59 Summary Report for 2013 ML14147A0342014-06-0606 June 2014 Review of the 2013 Steam Generator Tube Inspections NRC 2014-0024, NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the F2014-03-31031 March 2014 NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukush ML13338A5102014-01-27027 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14006A1872014-01-10010 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726 NRC 2013-0069, Supporting Documentation for July 22, 2013, Regulatory Conference to Discuss Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding2013-07-15015 July 2013 Supporting Documentation for July 22, 2013, Regulatory Conference to Discuss Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding ML13193A0322013-07-11011 July 2013 Additional Equipment Height Information with Vulnerability to Flood Waters NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R342013-07-0303 July 2013 Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 NRC 2013-0061, CFR 50.59 Summary Report for 20122013-06-28028 June 2013 CFR 50.59 Summary Report for 2012 NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic2012-11-26026 November 2012 NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic NRC 2011-0059, 10 CFR 50.59 Summary Report for 20102011-07-0101 July 2011 10 CFR 50.59 Summary Report for 2010 2023-07-24 Category:Technical MONTHYEARL-2022-168, And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022
[Table view]And Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2022-10-0404 October 2022 10 CFR 50.59 Evaluation and Commitment Change Summary Report L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-022022-07-29029 July 2022 Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 ML22140A1432022-05-20020 May 2022 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models ML22140A1422022-05-20020 May 2022 Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information ML22140A1412022-05-20020 May 2022 Attachment 6 - Point Beach RICT Program Pre-Implementation Items ML22140A1352022-05-20020 May 2022 RPS Instrumentation ML22140A1382022-05-20020 May 2022 Containment Isolation Valves ML22140A1332022-05-20020 May 2022 Attachment 1 - Evaluation of the Proposed Changes NRC 2022-0007, Enclosure 11 - Monitoring Program2022-05-20020 May 2022 Enclosure 11 - Monitoring Program ML22140A1442022-05-20020 May 2022 Enclosure 8 - Attributes of the Configuration Risk Management Model ML22140A1362022-05-20020 May 2022 Containment Isolation Valves ML22140A1392022-05-20020 May 2022 Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes ML22140A1402022-05-20020 May 2022 Attachment 5 - Evaluation of Plant-Specific Variations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report ML21008A0172020-10-25025 October 2020 Revised ANS Design Report NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure2019-08-29029 August 2019 Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2018-05-0202 May 2018 10 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report NRC 2017-0032, Focused Evaluation for Local Intense Precipitation2017-06-22022 June 2017 Focused Evaluation for Local Intense Precipitation ML13338A5102014-01-27027 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14006A1872014-01-10010 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726 ML13193A0322013-07-11011 July 2013 Additional Equipment Height Information with Vulnerability to Flood Waters NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R342013-07-0303 July 2013 Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic2012-11-26026 November 2012 NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic ML14006A3192010-03-31031 March 2010 LTR-PAFM-10-50-NP, Rev. 0, Section XI Flaw Evaluation of Indication Recorded on RC-32-MRCL-ALL-03 of the Point Beach Unit 1 Inlet Nozzle to Pipe Weld. NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation ML0935704152009-12-31031 December 2009 WEP-09-133 Np, Point Beach Unit 1 & Unit 2 (Wep/Wis) Extended Power Uprate License Amendment Request Responses to Request for Additional Information. ML0912505662009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Introduction Through Chapter 2, Section 2.5.7 ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0822406862008-06-30030 June 2008 WCAP-16541-NP, Revision 2, Spent Fuel Pool Criticality Safety Analysis. NRC 2008-0029, Pressure and Temperature Limits Report2008-05-30030 May 2008 Pressure and Temperature Limits Report NRC 2008-0034, License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair2008-05-28028 May 2008 License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair NRC 2007-0049, Supplement to License Amendment Request 251; Technical Specification 5.6.5., Reactor Coolant System Pressure and Temperature Limits Report2007-06-13013 June 2007 Supplement to License Amendment Request 251; Technical Specification 5.6.5., Reactor Coolant System Pressure and Temperature Limits Report NRC 2006-0061, LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program2006-07-11011 July 2006 LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program NRC 2006-0054, Public Version, Request for Review of Reactor Vessel Toughness Fracture Mechanics Analysis2006-06-0606 June 2006 Public Version, Request for Review of Reactor Vessel Toughness Fracture Mechanics Analysis ML0600400192005-12-14014 December 2005 Westinghouse LTR-RCDA-873-NP Attachment Point Beach, Unit 1 - Reactor Vessel Upper Closure Head Volume Best-Estimate Mean Fluid Temperature (Non-Proprietary) ML0533203122005-11-18018 November 2005 Reactor Vessel CMTRs (Non-Proprietary) NRC 2005-0117, Request for Withholding of Proprietary Information from Public Disclosure2005-09-0707 September 2005 Request for Withholding of Proprietary Information from Public Disclosure NRC 2005-0068, Submittal of Supporting Analyses Regarding Control of Heavy Loads2005-06-0303 June 2005 Submittal of Supporting Analyses Regarding Control of Heavy Loads ML0435700172004-12-14014 December 2004 from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations ML0514002682004-10-0808 October 2004 Enclosures V & VI Point Beach Revised EAL Submittal, Justification Matrix Reference Material NRC 2004-0004, Fitness-For-Duty (FFD) Program for Six Month Period Ending June 30, 20042004-08-30030 August 2004 Fitness-For-Duty (FFD) Program for Six Month Period Ending June 30, 2004 NRC 2004-0081, Transmittal of Point Beach Nuclear Plant, Units 1 and 2, Excellence Plan - Revision 42004-08-13013 August 2004 Transmittal of Point Beach Nuclear Plant, Units 1 and 2, Excellence Plan - Revision 4 ML0426603132004-07-31031 July 2004 BAW-2467NP, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessel of Point Beach Units I and 2 for Extended Life Through 53 Effective Full Power Years. ML0508800622004-05-0707 May 2004 Licensee Procedure, HPIP 4.58, Issuance of Respiratory Equipment Revision 14 ML0508800432004-04-30030 April 2004 NMC Incident Response Team for Issues Encountered During Unit 1 Reduced Inventory and Nozzle Dam Installation at Pbnp 2022-07-29 |
Text
For Information:
The attached document was delivered to the Point Beach NRC Resident Inspector Office on July 10, 2013, by Point Beach licensee personnel and provides information on heights of components and potential performance impacts from design basis flood waters. The document is considered as additional information to that provided in Point Beachs Response to Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding, dated June 28, 2013. (ADAMS Ascension number ML13179A333).
JER 7/11/13
Retrieved from "https://kanterella.com/w/index.php?title=ML13193A032&oldid=2061095"