Inspection/Activity Plan - Turkey Point Nuclear Plant (NRC Inspection Report 05000250-06-001 and 05000251-06-001)
ML060610340
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/02/2006
From: Casto C A
Division Reactor Projects II
To:
Shared Package
ML060610321 List:
References
IR-06-001
Download: ML060610340 (2)


Text

Turkey Point Inspection / Activity Plan 03/01/2006

-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:51:14 Report 22 2 EB3-ISI-U3 INSERVICE INSPECTION Baseline Inspections 03/13/2006 03/17/2006 3 7111108P IP Inservice Inspection Activities - PWR 7 EB1-CDB-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/14/2006 08/18/2006 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 08/28/2006 09/01/2006 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/11/2006 09/15/2006 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/25/2006 09/29/2006 3, 4 7111121 IP Component Design Bases Inspection 1 EB3-ISI-U4 INSERVICE INSPECTION Baseline Inspections 11/06/2006 11/10/2006 4 7111108P IP Inservice Inspection Activities - PWR 1 EB3SGISI-U4 STEAM GENERATOR ISI Baseline Inspections 11/13/2006 11/17/2006 4 7111108P IP Inservice Inspection Activities - PWR 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-4)

Event Response Insp 11/19/2006 11/24/2006 4 93812 IP Special Inspection 4 TFP-TRIENNAL FP PRE-INSPECTION VISIT Baseline Inspections 01/03/2007 01/05/2007 3, 4 7111105T IP Fire Protection [Triennial]

3 EB1-MODS-MODIFICATIONS/10CFR50.59 Baseline Inspections 01/08/2007 01/12/2007 3, 4 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/08/2007 01/12/2007 3, 4 7111117B IP Permanent Plant Modifications 3 OL PREP-INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007 3 V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES 3 OL EXAM-INITIAL EXAM WEEK1 Not Applicable 01/22/2007 01/28/2007 3 V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES 4 TFP-TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 3, 4 7111105T IP Fire Protection [Triennial]

Baseline Inspections 02/05/2007 02/09/2007 3, 4 7111105T IP Fire Protection [Triennial]

3 OL EXAM-INITIAL EXAM WEEK 2 Not Applicable 02/05/2007 02/09/2007 3 V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES 3 PS2-EP-EP EXERCISE Baseline Inspections 02/19/2007 02/23/2007 3, 4 7111401 IP Exercise Evaluation Baseline Inspections 02/19/2007 02/23/2007 3, 4 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/19/2007 02/23/2007 3, 4 71151 IP Performance Indicator Verification 1 EB3-MR-MAINTENANCE EFFECTIVENESS Baseline Inspections 07/23/2007 07/27/2007 3, 4 7111112B IP Maintenance Effectiveness 1 PSB1-RP-RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 08/06/2007 08/08/2007 3, 4 7112101 IP A ccess Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure Turkey Point Inspection / Activity Plan 03/01/2006

-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:51:14 Report 22 1 EB3-HS-HEAT SINK Baseline Inspections 08/27/2007 08/31/2007 3, 4 7111107B IP Heat Sink Performance 1 EB3-ISI-U3 INSERVICE INSPECTION Baseline Inspections 09/17/2007 09/21/2007 3 7111108P IP Inservice Inspection Activities - PWR 3 PSB1-RP-RP OCCUPATIONAL BASELINE INSP. WK1 Baseline Inspections 09/17/2007 09/21/2007 3, 4 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/17/2007 09/21/2007 3, 4 7112102 IP A LARA Planning and Controls Baseline Inspections 09/17/2007 09/21/2007 3, 4 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/17/2007 09/21/2007 3, 4 71151 IP Performance Indicator Verification 2 EB1-SUMP-PWR CONTAINMENT SUMP BLOCKAGE TI (U-3)

Event Response Insp 09/23/2007 09/28/2007 3 93812 IP Special Inspection 1 EB3SGISI-U3 STEAM GENERATOR ISI Baseline Inspections 09/24/2007 09/28/2007 3 7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.