Inspection/Activity Plan - Turkey Point Nuclear Plant (NRC Inspection Report 05000250-06-001 and 05000251-06-001)
ML060610340
Person / Time
Site: Turkey Point  
Issue date: 03/02/2006
From: Casto C
Division Reactor Projects II
To:
Shared Package
ML060610321 List:
References
IR-06-001
Download: ML060610340 (2)


Text

Turkey Point Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/02/2006 11:51:14 Report 22

EB3-ISI

- U3 INSERVICE INSPECTION Baseline Inspections 03/13/2006 03/17/2006

7111108P IP Inservice Inspection Activities - PWR

EB1-CDB

- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 08/14/2006 08/18/2006 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 08/28/2006 09/01/2006 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/11/2006 09/15/2006 3, 4 7111121 IP Component Design Bases Inspection Baseline Inspections 09/25/2006 09/29/2006 3, 4 7111121 IP Component Design Bases Inspection

EB3-ISI

- U4 INSERVICE INSPECTION Baseline Inspections 11/06/2006 11/10/2006

7111108P IP Inservice Inspection Activities - PWR

EB3SGISI

- U4 STEAM GENERATOR ISI Baseline Inspections 11/13/2006 11/17/2006

7111108P IP Inservice Inspection Activities - PWR

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-4)

Event Response Insp 11/19/2006 11/24/2006

93812 IP Special Inspection

TFP

- TRIENNAL FP PRE-INSPECTION VISIT Baseline Inspections 01/03/2007 01/05/2007 3, 4 7111105T IP Fire Protection [Triennial]

EB1-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 01/08/2007 01/12/2007 3, 4 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 01/08/2007 01/12/2007 3, 4 7111117B IP Permanent Plant Modifications

OL PREP

- INITIAL EXAM PREP Not Applicable 01/08/2007 01/12/2007

V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES

OL EXAM

- INITIAL EXAM WEEK1 Not Applicable 01/22/2007 01/28/2007

V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES

TFP

- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 01/22/2007 01/26/2007 3, 4 7111105T IP Fire Protection [Triennial]

Baseline Inspections 02/05/2007 02/09/2007 3, 4 7111105T IP Fire Protection [Triennial]

OL EXAM

- INITIAL EXAM WEEK 2 Not Applicable 02/05/2007 02/09/2007

V23260 TURKEY POINT/JANUARY 2007 EXAM AT POWER FACILITIES

PS2-EP

- EP EXERCISE Baseline Inspections 02/19/2007 02/23/2007 3, 4 7111401 IP Exercise Evaluation Baseline Inspections 02/19/2007 02/23/2007 3, 4 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 02/19/2007 02/23/2007 3, 4 71151 IP Performance Indicator Verification

EB3-MR

- MAINTENANCE EFFECTIVENESS Baseline Inspections 07/23/2007 07/27/2007 3, 4 7111112B IP Maintenance Effectiveness

PSB1-RP

- RP OCCUPATIONAL PRE-INSP VISIT Baseline Inspections 08/06/2007 08/08/2007 3, 4 7112101 IP Access Control to Radiologically Significant Areas This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.

Enclosure

Turkey Point Inspection / Activity Plan 03/01/2006 - 09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/02/2006 11:51:14 Report 22

EB3-HS

- HEAT SINK Baseline Inspections 08/27/2007 08/31/2007 3, 4 7111107B IP Heat Sink Performance

EB3-ISI

- U3 INSERVICE INSPECTION Baseline Inspections 09/17/2007 09/21/2007

7111108P IP Inservice Inspection Activities - PWR

PSB1-RP

- RP OCCUPATIONAL BASELINE INSP. WK1 Baseline Inspections 09/17/2007 09/21/2007 3, 4 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/17/2007 09/21/2007 3, 4 7112102 IP ALARA Planning and Controls Baseline Inspections 09/17/2007 09/21/2007 3, 4 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/17/2007 09/21/2007 3, 4 71151 IP Performance Indicator Verification

EB1-SUMP

- PWR CONTAINMENT SUMP BLOCKAGE TI (U-3)

Event Response Insp 09/23/2007 09/28/2007

93812 IP Special Inspection

EB3SGISI

- U3 STEAM GENERATOR ISI Baseline Inspections 09/24/2007 09/28/2007

7111108P IP Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedures.