ML061500103

From kanterella
Revision as of 13:16, 27 October 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

GE, Withholding from Public Disclosure, GENE-0000-0038-6481-01-R1-P, Exelon Steam Dryer Dynamic Time History Analyses: Dresden Unit 2 2004 Repair & Dresden Unit 3 2003 & 2004 Repair Dryer Configurations Using Loads from Plant Measurements,
ML061500103
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 09/05/2006
From: Banerjee M
NRC/NRR/ADRO/DORL/LPLIII-2
To: Stramback G B
General Electric Co
Banerjee M, NRR/ADPT, 415-2277
References
TAC MC0875, TAC MC0876
Download: ML061500103 (5)


Text

September 5, 2006Mr. George B. Stramback Manager, Regulatory Services GE Nuclear Energy 1989 Little Orchard Street M/C HME San Jose, CA 95125-1030

SUBJECT:

GENERAL ELECTRIC COMPANY, REQUEST FOR WITHHOLDINGINFORMATION FROM PUBLIC DISCLOSURE FOR DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (TAC NOS. MC0875 AND MC0876)

Dear Mr. Stramback:

By letter to the Nuclear Regulatory Commission (NRC) dated March 29, 2006, ExelonGeneration Company, LLC submitted an affidavit dated March 10, 2006, executed by you. Inthe affidavit you requested that the information contained in the following document be withheldfrom public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2,Section 2.390:GENE-0000-0038-6481-01-R1-P, "Exelon Steam Dryer Dynamic Time HistoryAnalyses: Dresden Unit 2 2004 Repair and Dresden Unit 3 2003 and 2004 Repair Dryer Configurations using Loads from Plant Measurements," Revision 1, dated March 2006A nonproprietary copy of this document has been placed in the NRC's Public Document Roomand added to the Agencywide Documents Access and Management System Public Electronic Reading Room.The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons: (1)The information discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; and(2)The information, if used by a competitor, would reduce his expenditure of resources orimprove his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.Additionally, you indicated that the information was submitted to the NRC in confidence, hasconsistently been held in confidence, is of a type customarily held in confidence, is not available in a public source, and qualifies under the narrower definition of trade secret.

G. StrambackWe have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-2277. Sincerely,/RA/Maitri Banerjee, Senior Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-237 and 50-249cc: See next page G. Stramback

ML061500103OFFICEPM:LPL3-2LPL3-2LA:LPL3-2BC:EEMBBC:LPL3-2NAMEMBanerjeeTWengertDClarkeKManolyDCollinsDATE9/5/069/1/069/1/069/1/069/5/06 Dresden Nuclear Power Units 2 and 3 cc:

Site Vice President - DresdenExelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765Plant Manager - Dresden Nuclear Power StationExelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765Manager Regulatory Assurance - DresdenExelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765U.S. Nuclear Regulatory CommissionDresden Resident Inspectors Office 6500 N. Dresden Road Morris, IL 60450-9766ChairmanGrundy County Board Administration Building 1320 Union Street Morris, IL 60450Regional Administrator, Region IIIU.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville RoadLisle, IL 60532-4351Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109Document Control Desk - LicensingExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Director - Licensing & Regulatory AffairsExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Vice President - Regulatory & Legal AffairsExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555Assistant General CounselExelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348Manager Licensing - DresdenExelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555