Letter Sequence RAI |
---|
|
|
MONTHYEARML0405600102004-03-18018 March 2004 Withholding from Public Disclosure, Exelon 10/10/2003 Letter Responding to NRC Request for Additional Information Re Change to Technical Specifications Re Operability Requirements of Main Steam Safety Valves Project stage: RAI ML0416703802004-06-25025 June 2004 Request for Additional Information, Main Steam Safety Valve Operability Requirements. TAC Nos. MB6537 and MB6538 Project stage: RAI ML0421500542004-07-30030 July 2004 Technical Specifications, Increase the Required Number of Operable Main Steam Safety Valves Project stage: Other ML0420903222004-07-30030 July 2004 License Amendment, Increase the Required Number of Operable Main Steam Safety Valves Project stage: Other 2004-06-25
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] Category:Proprietary Information Review
MONTHYEARML22200A0962022-07-22022 July 2022 Request for Withholding Information from Public Disclosure ML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML19078A1072019-03-27027 March 2019 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16183A2862016-07-12012 July 2016 Second Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2 - Regarding the Transition to Areva Fuel (MF5736, MF5737, MF5738, MF5739 ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML15260B3122015-09-24024 September 2015 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML14246A5762014-09-17017 September 2014 Request for Withholding Proprietary Information from Public Disclosure (TAC Nos. MF2422, MF2423, MF2424, and MF2425) ML14128A5662014-07-29029 July 2014 Request for Withholding Proprietary Information from Public Disclosure ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML1110502342011-04-27027 April 2011 Withholding Proprietary Information from Public Disclosure, Dresden Mode 2 High Pressure Scram Elimination RAI Responses (TAC Nos. ME4844 and ME4845) (RS-10-021) ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0728201572007-10-19019 October 2007 Request for Withholding Information from Public Disclosure Regarding Backup Stability Protection Methodology ML0722904432007-08-23023 August 2007 Request for Withholding Information from Public Disclosure - Request for License Amendment to Revise Safety Limit Minimum Critical Power Ratio - Dresden ML0626105142006-11-14014 November 2006 GE Request for Withholding Information from Public Disclosure ML0629903162006-11-0707 November 2006 Withholding from Public Disclosure, NF-BEX-06-167, Rev. 2 P-Attachment, Dresden Unit 3 Cycle 20 SLMCPR MD2706 ML0622904722006-10-13013 October 2006 Request for Withholding Information from Public Disclosure - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint ML0614500612006-09-21021 September 2006 GE Company, Request for Withholding Information from Public Disclosure for Dresden and Quad Cities RS-05-179 Stramback Ltr ML0610103752006-09-21021 September 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML0615001032006-09-0505 September 2006 GE, Withholding from Public Disclosure, GENE-0000-0038-6481-01-R1-P, Exelon Steam Dryer Dynamic Time History Analyses: Dresden Unit 2 2004 Repair & Dresden Unit 3 2003 & 2004 Repair Dryer Configurations Using Loads from Plant Measurements, ML0507701992006-09-0505 September 2006 Withholding from Public Disclosure, C.D.I. Proprietary Report No. 04-09P, Rev. 5 and Presentation Entitled, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Dated January 25, 2005 ML0615301212006-08-17017 August 2006 Continuum Dynamics, Inc. Request for Withholding Information from Public Disclosure, Bilanin Letter ML0614402522006-07-25025 July 2006 GE Company, Request for Withholding Information from Public Disclosure for Dresden and Quad Cities - Quintana Ltr ML0614406092006-07-0505 July 2006 Quad Cities, Units 1 and 2 - GE, Request for Withholding Information from Public Disclosure ML0608201332006-07-0505 July 2006 Quad Cities, Units 1 and 2 - GE, Request for Withholding Information from Public Disclosure ML0614401352006-07-0505 July 2006 General Electric Company, Request for Withholding Information from Public Disclosure ML0608905262006-05-0101 May 2006 GE Request for Withholding Information from Public Disclosure for Dresden, Units 2 and 3 and Quad, Units 1 and 2 ML0609603632006-05-0101 May 2006 General Electric, Withholding from Public Disclosure, GE-NE-0000-0032-1827P, Quad Cities Replacement Steam Dryer Instrumentation Acceptance Criteria, Dated April 2005 ML0610200462006-04-28028 April 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML0610102872006-04-28028 April 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dreden Nuclear Power Station, Units 1 and 2 (TAC Nos. MC0875, MC0876, MC0877 and MC0878 ML0609603942006-04-28028 April 2006 GE Request for Withholding Information from Public Disclosure Dresden and Quad by Letter Dated May 13, 2005 ML0607303242006-03-29029 March 2006 Company Request for Withholding Information from Public Disclosure ML0604002722006-03-16016 March 2006 Request for Withholding Information from Public Disclosure ML0604507082006-03-0808 March 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden, Units 2 and 3 and Quad Cities, Units 1 and 2 ML0518100572005-07-14014 July 2005 Withholding from Public Disclosure, Updated Responses to DNPS and QCNPS EPU RAIs 3B & 7, August 14, 2003 (GE Proprietary Information) ML0516601362005-07-0505 July 2005 7/5/05, Dresden and Quad Cities - Exelon Generation Company Request for Withholding Information from Public Disclosure ML0517503642005-07-0505 July 2005 7/5/05, Dresden and Quad Cities - Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML0514302632005-05-25025 May 2005 Quad Cities - Proprietary Determination for Handouts for April 14, 2005, Meeting with Westinghouse on Application of Optima2 Topical Reports ML0507703902005-03-24024 March 2005 Withholding from Public Disclosure, GE Proprietary Report GE-NE-0000-0011-0531-R3, Dresden and Quad Cities Neutron Flux Evaluation, Revision 3, Class III, Dated March 2005 ML0507701262005-03-23023 March 2005 GE, Withholding from Public Disclosure, GE Proprietary Reports GE-NE-0000-0002-9629-01R1, GE-NE-0000-0002-9600-01R2, GE-NE-0000-0002-9600-02R2 and GE-NE-0000-0002-9600-03R2 for Dresden Nuclear, Units 2 and 3, Quad Cities, Units 1 and 2 ML0405600102004-03-18018 March 2004 Withholding from Public Disclosure, Exelon 10/10/2003 Letter Responding to NRC Request for Additional Information Re Change to Technical Specifications Re Operability Requirements of Main Steam Safety Valves ML0404404252004-02-13013 February 2004 (Egc), Withholding Information from Public Disclosure, Jeffrey A. Benjamin 02/05/2004 Letter Addressing an Issue Related to EGC Plants ML0329010432003-12-29029 December 2003 Withholding from Public Disclosure, Enclosures to Ltrs Dated 07/31/2003 & 09/11/2003 Which Contained Information Regarding Proposed Change to Reactor Coolant System Pressure & Temperature Limits ML0318808352003-07-24024 July 2003 Review of Request for Withholding Information from Public Disclosure, TAC Nos. MB7850 and MB7851 ML0307602832003-03-31031 March 2003 Proprietary Information Review, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 2 2022-07-22
[Table view] |
Text
March 18, 2004 Mr. Ron Engel General Electric Company 175 Curtner Avenue San Jose, CA 95125
SUBJECT:
GENERAL ELECTRIC COMPANY, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (TAC NOS. MB6537 AND MB6538)
Dear Mr. Engel:
In a letter dated October 10, 2002, addressed to the U.S. Nuclear Regulatory Commission (NRC), P. R. Simpson, Manager, Licensing, Exelon Generation Company, requested a change to facility operating licenses DPR-19 and DPR-25 and the Technical Specifications for Dresden Nuclear Power Station, Units 2 and 3, regarding the operability requirements of the main steam safety valves. In subsequent communications from the NRC staff, the NRC requested additional information concerning the proposed change. In response, Exelon sent several letters with additional information, including one dated October 10, 2003.
In the letter dated October 10, 2003, that provided additional information to the NRC, Exelon enclosed a document containing a complete version of the information, as well as a version from which some of the material contained in the complete version had been expunged. The complete version had the words "GE Proprietary Information" marked at the top of each page of the document. The letter also enclosed an affidavit executed by you as the Technical Lead, Plant Services, General Electric Company (GE), requesting that NRC withhold the complete version of the information from public disclosure in accordance with Sections 2.790 and 9.17 of Title 10 of the Code of Federal Regulations (10 CFR) and stating the basis for the request.
The affidavit executed by you states that the information sought to be withheld from public disclosure is of a sort that GE customarily holds in confidence, that public disclosure of the information is likely to foreclose or reduce the availability to GE of profit-making opportunities, and will cause substantial harm to GEs competitive position.
As you may be aware, the text of 10 CFR 2.790 was amended by the NRC in June 2003. In addition, the section number was changed from 2.790 to 2.390 in February of this year.
We have reviewed your affidavit and the material supplied by Exelon, and have determined that the complete version of the GE information referred to above will be withheld from public disclosure pursuant to 10 CFR 2.390 (formerly 2.790). Copies of the version of the information, from which the material you stated to be proprietary has been expunged, have been placed in the NRCs Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
R. Engel Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the complete GE documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling the withheld information.
In addition, circumstances may arise in the future in which the NRC may reevaluate the determination to withhold from the public material expunged from the publicly available document. For example, if we received a Freedom of Information request to which such material is responsive, we will review the document again in that context. You will be notified in advance of any public disclosure, if in the course of such a reevaluation the NRC makes a determination adverse to your request.
If the basis for your request for withholding from the public material expunged from the publicly available document should change in the future, you should promptly notify the NRC.
If you have any questions regarding this matter, I may be reached at 301-415-2277.
Sincerely,
/RA/
Maitri Banerjee, Project Manager Project Directorate III, Section 2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: 50-237 and 50-249 cc: See next page
R. Engel Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the complete GE documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling the withheld information.
In addition, circumstances may arise in the future in which the NRC may reevaluate the determination to withhold from the public material expunged from the publicly available document. For example, if we received a Freedom of Information request to which such material is responsive, we will review the document again in that context. You will be notified in advance of any public disclosure, if in the course of such a reevaluation the NRC makes a determination adverse to your request.
If the basis for your request for withholding from the public material expunged from the publicly available document should change in the future, you should promptly notify the NRC.
If you have any questions regarding this matter, I may be reached at 301-415-2277.
Sincerely,
/RA/
Maitri Banerjee, Project Manager Project Directorate III, Section 2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos.: 50-237 and 50-249 cc: See next page DISTRIBUTION:
PUBLIC PDIII-2 R/F WRuland AMendiola MBanerjee DPickett PCoates CHammer MRing FAkstulewicz OGC TFord ADAMS ACCESSION No.: ML040560010 *See previous concurrences OFFICE PM:PDIII-2 LA:PDIII-2 DSSA/SRXB DSSA/SRXB OGC SC:PDIII-2 NAME MBanerjee PCoates TFord
- FAkstulewicz* SFonner* AMendiola DATE 03/18/04 03/16/04 2/25/04 2/26/04 3/11/04 03/17/04 OFFICIAL RECORD COPY
Dresden Nuclear Power Units 2 and 3 cc:
Site Vice President - Dresden Nuclear Power Station Senior Vice President, Nuclear Services Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Dresden Nuclear Power Station Plant Manager Vice President of Operations - Mid-West Exelon Generation Company, LLC Boiling Water Reactors 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9765 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC Vice President - Licensing and Regulatory 6500 N. Dresden Road Affairs Morris, IL 60450-9765 Exelon Generation Company, LLC 4300 Winfield Road U.S. Nuclear Regulatory Commission Warrenville, IL 60555 Dresden Resident Inspectors Office 6500 N. Dresden Road Director - Licensing and Regulatory Affairs Morris, IL 60450-9766 Exelon Generation Company, LLC 4300 Winfield Road Chairman Warrenville, IL 60555 Grundy County Board Administration Building Associate General Counsel 1320 Union Street Exelon Generation Company, LLC Morris, IL 60450 4300 Winfield Road Warrenville, IL 60555 Regional Administrator U.S. NRC, Region III Manager Licensing - Dresden, 801 Warrenville Road Quad Cities and Clinton Lisle, IL 60532-4351 Exelon Generation Company, LLC 4300 Winfield Road Illinois Emergency Management Warrenville, IL 60555 Agency Division of Disaster Assistance &
Preparedness 110 East Adams Street Springfield, IL 62701-1109 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555