Request for Withholding Information from Public Disclosure - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint
ML062290472
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 10/13/2006
From: John Honcharik
NRC/NRR/ADRO/DORL/LPLIII-2
To: Crane C
Exelon Generation Co
Banerjee M, NRR/ADPT, 415-2277
References
TAC MD2166, TAC MD2167
Download: ML062290472 (4)


Text

October 13, 2006 Mr. Christopher M. Crane President and Chief Nuclear Officer Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

EXELON GENERATION COMPANY REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 (TAC NOS. MD2166 AND MD2167)

Dear Mr. Crane:

By letters to the Nuclear Regulatory Commission (NRC) dated June 2 and August 18, 2006, Exelon Generation Company, LLC (Exelon) submitted affidavits dated May 23 and July 28, 2006, respectively, executed by Louis M. Quintana, General Electric Company (GE), requesting that the information contained in the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

General Electric Report, GE-NE-0000-0053-8435-R1P, Revision 1, Dresden 2 & 3 and Quad Cities 1 & 2 Safety Valve Setpoint Tolerance Relaxation, May 2006 General Electric Report, Request for Additional Information for Plot of Vessel Pressure during ATWS [Anticipated Transient Without Scram] PRFO [Pressure Regulator Failure Open] Event at BOC [Beginning of Cycle] Dresden and Quad Cities, Enclosure 1 to Letter No. 06-07-003 Nonproprietary copy of these documents have been placed in the NRC's Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

(i) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEs competitors without license from GE constitutes a competitive economic advantage over other companies; and (ii) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

C. Crane Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1157.

Sincerely,

/RA/

John Honcharik, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249 cc: See next page

C. Crane Therefore, the versions of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-1157.

Sincerely,

/RA/

John Honcharik, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237 and 50-249 cc: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 RidsNrrLADClarke RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrPMJHoncharik RidsNrrDssSbwb RidsNrrDciCptb ADAMS ACCESSION NO.:ML062290472 OFFICE LPL3-2/PM LPL3-2/LA CPTB/(A)BC SBWB/BC LPL3-2/BC NAME JHoncharik DClarke TLiu GCranston DCollins DATE 10/5/2006 9/25/2006 10/11/2006 10/11/2006 10/13/2006 OFFICIAL RECORD COPY

Dresden Nuclear Power Units 2 and 3 cc:

Site Vice President - Dresden Senior Vice President - Midwest Operations Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Plant Manager - Dresden Nuclear Power Station Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Manager Regulatory Assurance - Dresden Vice President - Regulatory & Legal Affairs Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 U.S. Nuclear Regulatory Commission Assistant General Counsel Dresden Resident Inspectors Office Exelon Generation Company, LLC 6500 N. Dresden Road 200 Exelon Way Morris, IL 60450-9766 Kennett Square, PA 19348 Chairman Manager Licensing - Dresden Grundy County Board Exelon Generation Company, LLC Administration Building 4300 Winfield Road 1320 Union Street Warrenville, IL 60555 Morris, IL 60450 Mr. Louis Quintana Regional Administrator, Region III Manager, Licensing U.S. Nuclear Regulatory Commission GE Nuclear Energy Suite 210 P.O. Box 780, M/C A-30 2443 Warrenville Road Wilmington, NC 28401 Lisle, IL 60532-4351 Illinois Emergency Management Agency Division of Disaster Assistance &