Letter Sequence Withholding Request Acceptance |
---|
|
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
|
MONTHYEARRS-05-061, Response to Request for Additional Information for Review of Quad Cities Replacement Steam Dryer2005-05-12012 May 2005 Response to Request for Additional Information for Review of Quad Cities Replacement Steam Dryer Project stage: Response to RAI ML0518100572005-07-14014 July 2005 Withholding from Public Disclosure, Updated Responses to DNPS and QCNPS EPU RAIs 3B & 7, August 14, 2003 (GE Proprietary Information) Project stage: RAI ML0518200102005-07-18018 July 2005 Continuum Dynamics, Inc., Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0528704802005-12-0707 December 2005 Report of Project Manager Site Visit- Dresden Steam Dryer Licensing Issues Project stage: Other RS-06-015, Commitments and Plans Related to Extended Power Uprate Operation2006-01-26026 January 2006 Commitments and Plans Related to Extended Power Uprate Operation Project stage: Request ML0604507082006-03-0808 March 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden, Units 2 and 3 and Quad Cities, Units 1 and 2 Project stage: Withholding Request Acceptance ML0604002722006-03-16016 March 2006 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0610805702006-04-10010 April 2006 Quad Cities Unit 2 Dryer Inspection Results Project stage: Request ML0610806102006-04-13013 April 2006 Request for Additional Information - Dryer Inspection, Start-up and Power Ascension Plan Project stage: RAI RS-06-058, Operational Plan Commitments2006-04-14014 April 2006 Operational Plan Commitments Project stage: Request ML0610406142006-04-20020 April 2006 Dryer Inspection Results Decision Project stage: Other ML0610102872006-04-28028 April 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dreden Nuclear Power Station, Units 1 and 2 (TAC Nos. MC0875, MC0876, MC0877 and MC0878 Project stage: Withholding Request Acceptance ML0609603942006-04-28028 April 2006 GE Request for Withholding Information from Public Disclosure Dresden and Quad by Letter Dated May 13, 2005 Project stage: Withholding Request Acceptance ML0610200462006-04-28028 April 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0611604452006-04-28028 April 2006 RAI Related to Unit 2 Steam Dryer Inspection Project stage: RAI ML0609603632006-05-0101 May 2006 General Electric, Withholding from Public Disclosure, GE-NE-0000-0032-1827P, Quad Cities Replacement Steam Dryer Instrumentation Acceptance Criteria, Dated April 2005 Project stage: Other ML0608905262006-05-0101 May 2006 GE Request for Withholding Information from Public Disclosure for Dresden, Units 2 and 3 and Quad, Units 1 and 2 Project stage: Withholding Request Acceptance ML0610202772006-05-19019 May 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Unit 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 Project stage: Withholding Request Acceptance ML0608201332006-07-0505 July 2006 Quad Cities, Units 1 and 2 - GE, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0614401352006-07-0505 July 2006 General Electric Company, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0614406092006-07-0505 July 2006 Quad Cities, Units 1 and 2 - GE, Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0614402522006-07-25025 July 2006 GE Company, Request for Withholding Information from Public Disclosure for Dresden and Quad Cities - Quintana Ltr Project stage: Withholding Request Acceptance ML0615301212006-08-17017 August 2006 Continuum Dynamics, Inc. Request for Withholding Information from Public Disclosure, Bilanin Letter Project stage: Withholding Request Acceptance ML0507701992006-09-0505 September 2006 Withholding from Public Disclosure, C.D.I. Proprietary Report No. 04-09P, Rev. 5 and Presentation Entitled, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Dated January 25, 2005 Project stage: Other ML0615001032006-09-0505 September 2006 GE, Withholding from Public Disclosure, GENE-0000-0038-6481-01-R1-P, Exelon Steam Dryer Dynamic Time History Analyses: Dresden Unit 2 2004 Repair & Dresden Unit 3 2003 & 2004 Repair Dryer Configurations Using Loads from Plant Measurements, Project stage: Other ML0610103752006-09-21021 September 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 Project stage: Withholding Request Acceptance 2006-04-14
[Table View] |
General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2ML061020046 |
Person / Time |
---|
Site: |
Dresden, Quad Cities |
---|
Issue date: |
04/28/2006 |
---|
From: |
Banerjee M Plant Licensing Branch III-2 |
---|
To: |
Stramback G General Electric Co |
---|
M. Banerjee, LPL3-2, 415-2277 |
References |
---|
TAC MC0875, TAC MC0876, TAC MC0877, TAC MC0878 |
Download: ML061020046 (5) |
|
|
---|
Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 05000265/LER-2024-002-01, Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure2024-10-30030 October 2024 Turbine Trip and Automatic Scram Due to Digital EHC Power Supply Intermittent Failure SVP-24-065, Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor2024-10-29029 October 2024 Offsite Dose Calculation Manual (ODCM) Section 12.2.2 Radioactive Gaseous Effluent Monitoring Instrumentation Report Main Chimney High Range Noble Gas Monitor IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 IR 05000254/20240102024-10-28028 October 2024 Age Related Degradation Inspection Report 05000254/2024010 and 05000265/2024010 and Notice of Violation RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests SVP-24-059, Correction to Registration of Use of Casks to Store Spent Fuel2024-10-0404 October 2024 Correction to Registration of Use of Casks to Store Spent Fuel ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24247A1642024-09-30030 September 2024 Alternative Request RP-01 ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination IR 05000254/20244022024-09-12012 September 2024 Material Control and Accounting Program Inspection Report 05000254/2024402 and 05000265/2024402 (Public) 2024-09-30
[Table view] Category:Proprietary Information Review
MONTHYEARML22293A5802022-10-28028 October 2022 Request for Withholding Information from Public Disclosure ML22227A1152022-09-27027 September 2022 Request for Withholding Information from Public Disclosure ML22228A1782022-09-27027 September 2022 Request for Withholding Information from Public Disclosure Quad Cities Nuclear Power Station, Units 1 and 2 ML22200A0962022-07-22022 July 2022 Request for Withholding Information from Public Disclosure ML21301A2192021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel ML21301A2202021-11-10010 November 2021 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Units 1 and 2 License Amendment Request Regarding Transition to GNF3 Fuel ML21279A0062021-10-13013 October 2021 Request for Withholding Information from Public Disclosure ML21084A1352021-04-0505 April 2021 Request for Withholding Information from Public Disclosure ML20317A1342020-11-12012 November 2020 Request for Withholding Information from Public Disclosure; Guarantees of Payment of Deferred Premiums ML19336A0192019-12-0303 December 2019 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML19078A1072019-03-27027 March 2019 Request for Withholding Information from Public Disclosure ML17320A1452017-11-20020 November 2017 Request for Withholding Information Regarding Guarantees of Payment of Deferred Premiums ML16337A2762016-12-0909 December 2016 Calvert; Clinton; Dresden; LaSalle; Limerick; Nine Mile Point; Oyster Creek; Peach Bottom; Quad Cities; R.E. Ginna; Three Mile Island - Request for Withholding Information Regarding; Guarantees of Payment of Deferred Premiums ML16183A2862016-07-12012 July 2016 Second Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2 - Regarding the Transition to Areva Fuel (MF5736, MF5737, MF5738, MF5739 ML16098A3222016-04-27027 April 2016 Request to Withhold Emergency Preparedness Documents from Public Disclosure (CAC Nos. MF7504-MF7525) ML16069A2692016-03-14014 March 2016 Request for Withholding Information from Public Disclosure Quad Cities Units 1 and 2 (CAC Nos. MF7160 and MF7161) ML16064A2052016-03-0909 March 2016 Request for Withholding Information from Public Disclosure Quad Cities Units 1 and 2 ML15260B3122015-09-24024 September 2015 Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML15183A3592015-07-28028 July 2015 Acceptance of Request for Withholding of Information from Public Disclosure Concerning Transition to Areva Fuel RS-15-008, Acceptance of Request for Withholding of Information from Public Disclosure Concerning Transition to Areva Fuel2015-07-28028 July 2015 Acceptance of Request for Withholding of Information from Public Disclosure Concerning Transition to Areva Fuel ML14246A5762014-09-17017 September 2014 Request for Withholding Proprietary Information from Public Disclosure (TAC Nos. MF2422, MF2423, MF2424, and MF2425) ML14128A5632014-09-0404 September 2014 Request for Withholding Proprietary Information from Public Disclosure ML14128A5662014-07-29029 July 2014 Request for Withholding Proprietary Information from Public Disclosure ML13134A1132013-05-15015 May 2013 Request for Withholding Information from Public Disclosure ML13016A5002013-01-30030 January 2013 Request for Withholding Information from Public Disclosure for Braidwood Station, Units 1 & 2; Byron Station, Units 1 & 2; Clinton Power Station, Unit 1; Dresden Nuclear Power Station, Units 2 & 3; LaSalle County Station, Units 1 & 2 ML1133402522011-12-15015 December 2011 Request for Withholding Information from Public Disclosure for Quad Cities Nuclear Power Station, Unit 2 - Technical Specification Change for Safety Limit Minimum Critical Power Ratio ML1110502342011-04-27027 April 2011 Withholding Proprietary Information from Public Disclosure, Dresden Mode 2 High Pressure Scram Elimination RAI Responses (TAC Nos. ME4844 and ME4845) (RS-10-021) ML0907103302009-04-30030 April 2009 Corp., Request for Withholding Information from Public Disclosure ML0734101462007-12-20020 December 2007 Request for Withholding Information from Public Disclosure - Cycle 20 SLMCPR ML0728201572007-10-19019 October 2007 Request for Withholding Information from Public Disclosure Regarding Backup Stability Protection Methodology ML0722904432007-08-23023 August 2007 Request for Withholding Information from Public Disclosure - Request for License Amendment to Revise Safety Limit Minimum Critical Power Ratio - Dresden ML0711401932007-05-0303 May 2007 Withholding from Public Disclosure, Addition Information Supporting Request for TSs Change Cycle 20 Minimum Critical Power Ratio Safety Limit ML0709305112007-05-0303 May 2007 Request for Withholding Information from Public Disclosure for Quad Cities Unit 1 Cycle 20 Minimum Critical Power Ratio Safety Limit ML0626105142006-11-14014 November 2006 GE Request for Withholding Information from Public Disclosure ML0629903162006-11-0707 November 2006 Withholding from Public Disclosure, NF-BEX-06-167, Rev. 2 P-Attachment, Dresden Unit 3 Cycle 20 SLMCPR MD2706 ML0622904722006-10-13013 October 2006 Request for Withholding Information from Public Disclosure - Request for License Amendment to Increase Main Steam Safety Valve Lift Setpoint ML0610103752006-09-21021 September 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML0614500612006-09-21021 September 2006 GE Company, Request for Withholding Information from Public Disclosure for Dresden and Quad Cities RS-05-179 Stramback Ltr ML0507701992006-09-0505 September 2006 Withholding from Public Disclosure, C.D.I. Proprietary Report No. 04-09P, Rev. 5 and Presentation Entitled, Methodology to Determine Unsteady Pressure Loading on Components in Reactor Steam Domes, Dated January 25, 2005 ML0615001032006-09-0505 September 2006 GE, Withholding from Public Disclosure, GENE-0000-0038-6481-01-R1-P, Exelon Steam Dryer Dynamic Time History Analyses: Dresden Unit 2 2004 Repair & Dresden Unit 3 2003 & 2004 Repair Dryer Configurations Using Loads from Plant Measurements, ML0615301212006-08-17017 August 2006 Continuum Dynamics, Inc. Request for Withholding Information from Public Disclosure, Bilanin Letter ML0614402522006-07-25025 July 2006 GE Company, Request for Withholding Information from Public Disclosure for Dresden and Quad Cities - Quintana Ltr ML0614406092006-07-0505 July 2006 Quad Cities, Units 1 and 2 - GE, Request for Withholding Information from Public Disclosure ML0614401352006-07-0505 July 2006 General Electric Company, Request for Withholding Information from Public Disclosure ML0608201332006-07-0505 July 2006 Quad Cities, Units 1 and 2 - GE, Request for Withholding Information from Public Disclosure ML0608905262006-05-0101 May 2006 GE Request for Withholding Information from Public Disclosure for Dresden, Units 2 and 3 and Quad, Units 1 and 2 ML0609603632006-05-0101 May 2006 General Electric, Withholding from Public Disclosure, GE-NE-0000-0032-1827P, Quad Cities Replacement Steam Dryer Instrumentation Acceptance Criteria, Dated April 2005 ML0610200462006-04-28028 April 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2 ML0610102872006-04-28028 April 2006 General Electric Company, Request for Withholding Information from Public Disclosure for Dreden Nuclear Power Station, Units 1 and 2 (TAC Nos. MC0875, MC0876, MC0877 and MC0878 ML0609603942006-04-28028 April 2006 GE Request for Withholding Information from Public Disclosure Dresden and Quad by Letter Dated May 13, 2005 2022-09-27
[Table view] |
Text
April 28, 2006 Mr. George B. Stramback Manager, Regulatory Services GE Nuclear Energy 1989 Little Orchard Street M/C HME San Jose, CA 95125-1030
SUBJECT:
GENERAL ELECTRIC COMPANY, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3, AND QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS. MC0875, MC0876, MC0877 AND MC0878)
Dear Mr. Stramback:
By letter dated May 13, 2005, Exelon Generation Company submitted an affidavit dated May 1, 2005, executed by you. In the affidavit you requested that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
GE-NE-0000-0032-1827-01P, Quad Cities Replacement Steam Dryer Damping Values for Hood and Skirt Flow Induced Dynamic Analysis, Class III, dated April 2005.
A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(1) The information discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric<s competitors without license from General Electric constitutes a competitive economic advantage over other companies; and (2) The information, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
Additionally, you indicated that the information was submitted to the NRC in confidence, has consistently been held in confidence, is of a type customarily held in confidence, is not available in a public source, and qualifies under the narrower definition of trade secret.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
G. Stramback Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2277.
Sincerely,
/RA/
Maitri Banerjee, Senior Project Manager Project Directorate III, Section 2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-237, 50-249, 50-254, and 50-265 cc: See next page
ML061020046 OFFICE PM:LPL3-2 LPL3-2 LA:LPL3-2 BC:EEMB BC:LPL3-2 NAME MBanerjee:ca TWengert DClarke KManoly DCollins (LFeizolha for)
DATE 4/24/2006 4/21/2006 4/21/2006 4/21/2006 4/28/2006 Dresden and Quad Cities Nuclear Power Stations cc:
Site Vice President - Dresden Nuclear Power Station Senior Vice President of Operations Exelon Generation Company, LLC Exelon Generation Company, LLC 6500 N. Dresden Road 4300 Winfield Road Morris, IL 60450-9765 Warrenville, IL 60555 Dresden Nuclear Power Station Plant Manager Vice President - Licensing and Regulatory Exelon Generation Company, LLC Affairs 6500 N. Dresden Road Exelon Generation Company, LLC Morris, IL 60450-9765 4300 Winfield Road Warrenville, IL 60555 Regulatory Assurance Manager - Dresden Exelon Generation Company, LLC Director - Licensing and Regulatory 6500 N. Dresden Road Affairs Morris, IL 60450-9765 Exelon Generation Company, LLC 4300 Winfield Road U.S. Nuclear Regulatory Commission Warrenville, IL 60555 Dresden Resident Inspectors Office 6500 N. Dresden Road Assistant General Counsel Morris, IL 60450-9766 Exelon Generation Company, LLC 4300 Winfield Road Chairman Warrenville, IL 60555 Grundy County Board Administration Building Manager Licensing - Dresden, 1320 Union Street Quad Cities and Clinton Morris, IL 60450 Exelon Generation Company, LLC 4300 Winfield Road Regional Administrator Warrenville, IL 60555 U.S. NRC, Region III 801 Warrenville Road Site Vice President - Quad Cities Nuclear Lisle, IL 60532-4351 Power Station Exelon Generation Company, LLC Illinois Emergency Management 22710 206th Avenue N.
Agency Cordova, IL 61242-9740 Division of Disaster Assistance &
Preparedness Quad Cities Nuclear Power Station 110 East Adams Street Plant Manager Springfield, IL 62701-1109 Exelon Generation Company, LLC 22710 206th Avenue N.
Document Control Desk - Licensing Cordova, IL 61242-9740 Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555
Dresden and Quad Cities Nuclear Power Stations cc:
Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.
Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.
Cordova, IL 61242 David C. Tubbs MidAmerican Energy Company One River Center Place 106 E. Second, P.O. Box 4350 Davenport, IA 52808-4350 Vice President - Law and Regulatory Affairs MidAmerican Energy Company One River Center Place 106 E. Second Street P.O. Box 4350 Davenport, IA 52808 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, IL 61201