2006/07/28-Summary of Telephone Conference Held on March 24 and April 7 - Oyster Creek Nuclear Generating Station. LRA
ML062160052
Person / Time
Site: Oyster Creek
Issue date: 07/28/2006
From: Ashley D J
NRC/NRR/ADRO/DLR/RLRA
To:
AmerGen Energy Co
Ashley D J
References
%dam200612
Download: ML062160052 (10)


Text

July 28, 2006LICENSEE:AmerGen Energy Company, LLC FACILITY:Oyster Creek Nuclear Generating Station

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALLS HELD ON MARCH 24 AND APRIL 7, 2006, BETWEEN THE U.S. NUCLEARREGULATORY COMMISSION AND AMERGEN ENERGY COMPANY, LLC, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE OYSTER CREEK NUCLEAR GENERATING STATION,LICENSE RENEWAL APPLICATIONThe U.S. Nuclear Regulatory Commission staff (NRC or the staff), and representatives ofAmerGen Energy Company, LLC (AmerGen), held two telephone conference calls on March 24 and April 7, 2006 to discuss and clarify the staff's draft request for additional information (D-RAI) concerning the Oyster Creek Nuclear Generating Station license renewal application (LRA). The conference calls were useful in clarifying the intent of the staff's D-RAI.Enclosure 1 provides a listing of the conference call participants. Enclosure 2 contains a listingof the D-RAI discussed with the applicant, including a brief description on the status of the items.The applicant had an opportunity to comment on this summary./RA/Donnie J. Ashley, Project ManagerLicense Renewal Branch A Division of License Renewal Office of Nuclear Reactor RegulationDocket No. 50-219

Enclosures:

As statedcc w/encls: See next page

ML062160052 DOCUMENT NAME: E:\Filenet\ML062160052.wpdOFFICEPM:RLRA:DLRLA:RLRA:DLRBC:RLRA:DLRNAMEDAshleyYEdmonds LLund DATE07/ 26 /0607/ 26 /0607/ 28 /06 Oyster Creek Nuclear Generating Station cc:Site Vice President - Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731Senior Vice President of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348Kathryn M. Sutton, EsquireMorgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004Kent Tosch, ChiefNew Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Mayor of Lacey Township818 West Lacey Road Forked River, NJ 08731Senior Resident InspectorU.S. Nuclear Regulatory Commission

P.O. Box 445 Forked River, NJ 08731Director - Licensing and Regulatory AffairsAmerGen Energy Company, LLC Correspondence Control

P.O. Box 160 Kennett Square, PA 19348Manager Licensing - Oyster CreekExelon Generation Company, LLC Correspondence Control

P.O. Box 160 Kennett Square, PA 19348Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731Assistant General CounselAmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348Ron Bellamy, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415Correspondence Control DeskAmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348Oyster Creek Nuclear Generating StationPlant Manager AmerGen Energy Company, LLC

P.O. Box 388 Forked River, NJ 08731License Renewal ManagerExelon Generation Company, LLC 200 Exelon Way, Suite 230 Kennett Square, PA 19348 Oyster Creek Nuclear Generating Station cc:Mr. James RossNuclear Energy Institute 1776 I Street, NW, Suite 400 Washington, DC 20006-3708Mr. Michael P. GallagherVice President License Renewal Exelon Generation Company, LLC 200 Exelon Way, Suite 230 Kennett Square, PA 19348Mr. Christopher M. CranePresident and Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Note to: AmerGen Energy Company, LLC, Facility: Oyster Creek Nuclear Generating Stationfrom Donnie Ashley dated July 28, 2006.

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALLS HELD ON MARCH 24 AND APRIL 7, 2006 , BETWEEN THE U.S. NUCLEARREGULATORY COMMISSION AND AMERGEN ENERGY COMPANY, LLC, CONCERNING DRAFT REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE OYSTER CREEK NUCLEAR GENERATING STATION,LICENSE RENEWAL APPLICATIONHARD COPYDLR R/FE-MAIL:JFairRWeisman AMurphy RPettis GGalletti CLi GBagchi SSmith (srs3)

SDuraiswamy YL (Renee) Li RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDe RidsNrrDci RidsNrreEemb RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDss RidsNrrDnrl RidsOgcMailCenter RidsNrrAdes DLR Staff


C. Holden R. Laufer G. Miller R. Bellamy, RI R. Cureton, RI J. Lilliendahl, RIM. Modes, RI M. Sykes, RI T. Mensah M. Young OPA ENCLOSURE 1LIST OF PARTICIPANTS FOR TELEPHONE CONFERENCE CALLSTO DISCUSS THE OYSTER CREEK NUCLEAR GENERATING STATIONLICENSE RENEWAL APPLICATIONMarch 24, 2006Participants AffiliationsDonnie AshleyU.S. Nuclear Regulatory Commission (NRC)Amar PalNRC Duc NugyenNRC Don WarfelAmerGen Energy Company, LLC (AmerGen)

John HufnagelAmerGen Deborah SpamerAmerGenApril 7, 2006Participants AffiliationsDonnie AshleyU.S. Nuclear Regulatory Commission (NRC)Amar PalNRC Duc NugyenNRC Don WarfelAmerGen Energy Company, LLC (AmerGen)

George BecklAmerGen Deborah SpamerAmerGen ENCLOSURE 2DRAFT REQUESTS FOR ADDITIONAL INFORMATION (D-RAI)OYSTER CREEK NUCLEAR GENERATING STATIONLICENSE RENEWAL APPLICATIONApril 7, 2006The U.S. Nuclear Regulatory Commission staff (the staff) and representatives of AmerGenEnergy Company, LLC (AmerGen), held a telephone conference call on March 24, 2006, and April 7, 2006, to discuss and clarify the staff's draft request for additional information (D-RAI) concerning the Oyster Creek Nuclear Generating Station (OCNGS), license renewal application(LRA). The following D-RAIs were discussed during the telephone conference calls.D-RAI-3.6.2.2.5Industry operating experience as discussed in Information Notice 93-95 identified the potentialfor loss of offsite power due to salt contamination of the switchyard insulators. On March 17, 1993, Crystal River Unit 3 experienced a loss of the 230 kV switchyard (normal offsite power to safety-related busses) when a light rain caused arcing across salt-laden 230 kV insulators and opened breakers in switchyard. Since 1982, Pilgrim station has also experienced several loss of offsite power events when heavy ocean storms deposited salt on the 345 kV switchyard causing the insulator to arc to ground. The applicant stated that an incident on September 18,2003, was considered a highly unusual weather condition that resulted in wind blown salty spray deposited on insulators causing flashing. The fact that industry operating experience has shown that the potential loss of offsite power due to salt contamination of switchyard insulatorsdoes exist for facilities that are near the sea coast where salt spray is prevalent, the staffrequests the applicant to provide an aging management program (AMP) to manage the aging effects of insulator surface contamination due to salt deposits.Discussion: The applicant understands the question and will provide an answer.D-RAI-3.6.2.2.6-1Torque relaxation for bolted connections is a concern for switchyard bus connections andtransmission conductors connections. An electrical connection must be designed to remain tight and maintain good conductivity through a large temperature range. Meeting this design requirement is difficult if the material specified for the bolt and the conductor are different and have different rates of thermal expansion. For example, copper or aluminum bus/conductor materials expand faster than most bolting materials. If thermal stress is added to stresses inherent at assembly, the joint members or fasteners can yield. If plastic deformation occurs during thermal loading (i.e., heatup) when the connection cools, the joint will be loose. EPRIdocument TR-104213, "Bolted Joint Maintenance & Application Guide" recommends inspection of bolted joints for evidence of overheating, signs of burning or discoloration, and indication of loose bolts. The staff requests the applicant to provide a discussion as to why torque relaxation for bolted connection is not a concern for OCNGS. Discussion: A review of the boundary drawings showed that the switchyard bus connectionsare not in the scope of license renewal. The question will be revised to remove the reference tothe switchyard bus connections. The applicant understands the revised question and willprovide an answer.D-RAI-3.6.2.2.6-2The staff requests the applicant to compare the Ontario Hydroelectric study to Oyster Creek.

Discussion:

The applicant understands the question and will provide an answer.D-RAI-3.6.2.3.1-1In LRA Section 3.6.2.3.1, the applicant stated that "These panels are not located in adverselocalized areas of high temperature or humidity. These rooms are protected from weather variations and are not subject to significant temperature variations." The staff requests the applicant to explain how these rooms are protected from weather variations. Discussion: The applicant understands the question and will provide an answer.D-RAI-3.6.2.3.1-2In LRA Section 3.6.2.3.1, the applicant indicated that "With regard to internal moisture (i.e., formation of condensation), a walkdown revealed no signs of moisture/humidity in the area, or any sign of moisture within the enclosure." The staff requests the applicant to provide details about the walkdown (number of fuse holders inspected and condition of the fuse holders, etc.).Discussion: The applicant understands the question and will provide an answer.D-RAI-3.6.2.3.1-3In the LRA Section 3.6.2.3.1, the applicant stated that "SCRAM solenoid fuses are not subjectto frequent manipulations. When these circuits need to be de-energized, power is removed at the safety-related power supplies. When manipulated an inspection is performed..." The staff requests that the applicant discuss the disconnection means at the safety-related powersupplies. Also, discuss how often the fuses are manipulated and the reason for this manipulation.Discussion: The applicant understands the question and will provide an answer.D-RAI-3.6.2.3.2In LRA Section 3.6.2.3.2, the applicant stated that "Because of the non-EQ electricalpenetrations are the same as the EQ electrical penetrations, and the EQ penetrations havebeen shown to have a qualified life of 60 years, Amergen concludes that non-EQ electrical penetrations are also qualified for a 60-year life." The staff requests that the applicant confirm that non-EQ electrical penetrations will be exposed to the same environment as the EQpenetrations. Discussion: The applicant understands the question and will provide an answer.D-RAI-3.6.2.3.3In LRA Section 3.6.2.3.3, under the heading "Thermal Cycling, Ohmic Heating and ElectricalTransients," the applicant stated that "At Oyster Creek, power supply cables are typicallyinstalled in a continuous run from the supply, e.g., switchgear, to the load, e.g., motor. The metallic parts of connections to the supply and load are therefore part of, or internal to, activecomponents, e.g., the switchgear and motor, and therefore are not subject to aging management." The AMP XI-E6, "Electrical Cable Connections not Subject to 10 CFR 50.49 Environmental Qualification Requirements" of NUREG-1801, Rev. 1 specified that connectionsassociated with cables within the scope of license renewal are part of this program, regardless of their association with active or passive components. Also, refer to pages 107, 256 and 257 of NUREG-1833, "Technical Bases for Revision to the License Renewal Guidance Documents,"for additional information regarding AMP XI-E6. The staff requests that the applicant provide an AMP with the ten elements.Discussion: The applicant understands the question and will provide an answer.D-RAI-3.6.2.3.4In LRA Section 3.6.2.3.4, the applicant stated that "Ground connections are commonly madewith welds or compression type connectors, which include compression-, bolted-, and wedge type devices." Torque relaxation for bolted connections is a concern for ground connections.

An electrical connection must be designed to remain tight and maintain good conductivity through a large temperature range. Meeting this design requirement is difficult if the material specified for the bolt and the conductor are different and have different rates of thermal expansion. For example, copper or aluminum conductor materials expand faster than most bolting materials. If thermal stress is added to stresses inherent at assembly, the joint members or fasteners can yield. If plastic deformation occurs during thermal loading (i.e.,

heatup) when the connection cools, the joint will be loose. EPRI document TR-104213, "BoltedJoint Maintenance & Application Guide" recommends inspection of bolted joints for evidence of overheating, signs of burning or discoloration, and indication of loose bolts. The staff requests that the applicant provide a discussion as to why torque relaxation for bolted connection is not a concern for OCNGS.

Discussion: The applicant understands the question and will provide an answer.