Annual Assessment Letter - Comanche Peak Steam Electric Station (NRC Inspection Report 05000445-07-001 and 05000446-07-001)
ML070610593
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/02/2007
From: Johnson C E
NRC/RGN-IV/DRP/RPB-A
To: Blevins M
TXU Power
References
IR-07-001
Download: ML070610593 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 611 RYAN PLAZA DRIVE, SUITE 400 ARLINGTON, TEXAS 76011-4005 March 2, 2007 Mike Blevins, Senior Vice President TXU Power ATTN: Regulatory Affairs Comanche Peak Steam Electric Station P.O. Box 1002 Glen Rose, TX 76043 and Chief Nuclear Officer

SUBJECT: ANNUAL ASSESSMENT LETTER - COMANCHE PEAK STEAM ELECTRIC STATION (NRC INSPECTION REPORT 05000445/2007001 AND 05000446/2007001)

Dear Mr. Blevins:

On February 8, 2007, the NRC staff completed its performance review of the Comanche Peak Steam Electric Station, Units 1 and 2. Our technical staff reviewed performance indicators for the most recent quarter and inspection results for the period from January 1 through December 31 , 2006. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will include the physical protection review and resultant inspection plan. Overall, Comanche Peak Steam Electric Station, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all performance indicators indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. The enclosed inspection plan details the inspections, less those related to physical protection scheduled through September 30, 2008.

Included in the plan are those inspections associated with the replacement of the steam generators and the reactor pressure vessel head in Unit 1 scheduled for Spring 2007. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature.

The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

TXU Power -2- In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (81 7) 860-81 48 with any questions you may have regarding this letter or the inspection plan.

Sincerely,n ca Q Claude E. Johnson,thief Project Branch A Division of Reactor Projects Dockets: 50-445 Licenses: NPF-87 50-446 NPF-89

Enclosure:

Comanche Peak In pection/Activity Plan cc w/enclosure:

Fred W. Madden, Director Regulatory Affairs TXU Power P.O. Box 1002 Glen Rose, TX 76043 George L. Edgar, Esq. Morgan Lewis 11 11 Pennsylvania Avenue, NW Washington, DC 20004 Terry Parks, Chief Inspector Texas Department of Licensing Boiler Program P.O. Box 12157 Austin, TX 7871 1 and Regulation The Honorable Walter Maynard Somervell County Judge P.O. Box 851 Glen Rose, TX 76043 Richard A. Ratliff, Chief Bureau of Radiation Control Texas Department of Health 1 100 West 49th Street Austin, TX 78756-31 89 Environmental and Natural Office of the Governor P.O. Box 12428 Austin, TX 7871 1-31 89 Resources Policy Director TXU Power Brian AImon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 7871 1-3326 Susan M. Jablonski Office of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 7871 1-3087 Chairperson Denton Field Office Chemical and Nuclear Preparedness and Protection Division Office of Infrastructure Protection Preparedness Directorate Dept. of Homeland Security Federal Regional Center 800 North Loop 288 Denton, TX 76209-3698 Greg Doyle Sheriff, Somervell County 750 E. Gibbs Blvd. Glen Rose, TX 76043 The Honorable Pam Miller Mayor of Glen Rose P.O. Box 1949 Glen Rose, TX 76043 The Honorable Andy Rash Hood County Judge 100 E. Pearl Street Granbury, TX 76048 Federal Emergency Management Agency ATTN: William E. Peterson, Regional Director Region VI, Federal Center 800 North Loop 288 Denton, TX 76209-3698 Paul Hudson, Chairman Public Utility Commission William B. Travis Bldg. P.O. Box 13326 1701 North Congress Avenue Austin, TX 7871 1-3326 William "Dub" Taylor State Energy Conservation Office 11 1 East 17'h Street, #I 114 Austin, TX 7871 1 Gene Mayo Sheriff, Hood County 400 N. Gordon Street Granbury, TX 76048 Jack Colley, State Coordinator Division of Emergency Management Texas Department of Public Safety Box 4087,5805 North Lamar Blvd. Austin, TX 78773-4087 Institute of Nuclear Power Operations (INPO) Records Center 700 Galleria Parkway SE, Suite 100 Atlanta, GA 30339 David Southern Mayor of Granbury P.O. Box 969 Granbury, TX 76048 m C 0 0 a, R 0) C a, c a, m m .- c - .- - m b 0 0 W N 0 b 0 0 N c! . 7 9 . 7 0 mm cc 00 a,a, mm cc ma, ma, .P .o an. CY -- .s .E 33 mm -- bb 00 00 $!$! se N $2 00 bb 00 00 gg m (I: 0 0 a, R m c a, C a, 0 m .- c - ._ - m b 0 0 0 m 0 b 0 0 W N m 0 c! e c! . m c 0 0 a, 0. 0 C a, C a, m m .- c - ._ - m b 0 0 W 0 * 0 b 0 0 N c! . 2 . e 0 m c 0 0 a, R m C a, c a, m m ._ e - .- - m b 0 0 I?! co 7 . m 0 b 0 0 p! 2 . m 0 mm cc 00 ma, an mm cc a,a, CC mm mm .P .o cc -- .- .- 55 mm bb 00 00 $2 2s 00 bb 00 00 rm -N 00 22 && UOa, .E - .E .E a55 mmm mmm mmm bbb 000 22% 000 000 000 333 2 E 0 0 N n 9 0 n W z W (3 0 [r z m x a, m a a 5 t3 0 5 n a a a 0 3 3 z I- -I z I- 3 o o 0 2 C 0 0 a, a m c C a, .- c - .I- E 0 m Q a, IT U m a, I a, m m a, > 0 0 m a, n - - L Y m - E R e a c 0 C 0 3 0 m a, LT 73 C m c 0 m 0 c C a, ._ .I- - ._ c .- c E m - E R e a c 0 c 0 3 0 0 a, LT 73 C m C 0 m 0 c c a, .- w - ._ .I- .- c E kk zz 33 YY 44 an z I- 0 n rn z I I- a n Y 4 - N z T- 7 T- b a W W m m N 7 . 7 a N z $! a T- b m b 0 m N In b 7 T- a m N In b 7 - a N N b z T- T- a 8 a 9 n a z m rn B 0 0 0 m a E a 2:

mmm CCC 000 oms, mmm CCC aaa, .P .e .P naa CY1 --- .E .E .E 555 mmm . tcl$$ mmrn 000 mmm FFQ? 000 000 77 5s: 000 mmw 000 000 322 qQ?c 7-cu 000 mmmm CCCC 0000 mcucua, mmmm CCCC ._ 0 .E .P .P anaa YCCC ---- mmm CCC 000 alala, QQQ mmm CCC .g .g .g --- mmmmmmm CCCCCCC 0000000 a,ala,a,ala,a, mmmmmm CCCCCCC .g .g .E .P .P .o .o ccc-Y aaaann~ ------- cumaa, mcua, arno a,a,a,a,a, a,a,a,a, ama, oaa, ma, mmmm m .E .rrr .E .E .rrr .rrr .E .E .E .E .E ----- .E .E .E .E E%% Smmm mmmm 222 222 mmmm mmm mmrn Zmmmm ---- --- --- mmmm 0000 0000 qcucucu maas cuQ?cucu 9000 cuaa mmmm 3j3j3j3j N2" 0000 0000 N"N 9000 cuaa %- mmmmm ~cucucucu OSSBS Q?cucucuN coaaaa 00000 00000 00000 mmmwm 00000 00000 "CUCUCU $$75$$ aaaaa 00000 U Po 00 .E .E 55 mm mm mm ma 00 00 $2 2% 2% 00 mm 00 00 7- &a 00 m C 0 0 a, a m C a, C .- e - .- - % m m m 0 0 2 Q? m m Q? m 0 0 0 cu b 0 . mmm CCC .g g .P c a,a,a, ann 000 mmm CCC --- mala, .E - .rrr .E m55 mmm mmrn mmm mmrn 000 000 2$2 Q?" mS& 000 mmrn 000 Q?cucu 000 &&& 000 Inr m Y m C 0 0 a, a m C a, C a, (0 m .- c - .- - m 6 0 (D N 0 b 0 0 r . 7 2 . 7 0 mm CC 00 ma, aa mm CC ma, Oa, mm ma .g .g -- .E .E mm -- bb 00 00 NN 33 ss $2 00 66 00 Q!? NN 00 mm CC 00 a,a, aa om CC ma, ma, mm mm g .g -- .E .r mm -- bb 00 00 $!g 55 bb 00 00 2s ss 00 m C 0 0 a, a u) C a, C a, u) m .- e - .- - m b 0 0 N 0 m 0 . F 6 r 0 N (D m 0 . 2 0 0 a, a m C a, C .- .c. - .- - $ m 6 s a 0 N (D 0 b 0 0 cu . 2 . 0 m C 0 0 a, a m C a, C a, .- e - .- - 2 m b 0 0 m m 0 b 0 0 * m 0 r 7 . r 7 . mm CC 00 ala, aa mm CC a,a, ala, mm am .P .P cc -- .E .E mm -- bb 00 00 $$! 5% 00 bb 00 00 Ym e2 7 a$ 00 a,a,a, a,a,a, mmm .E .E .E --- mmm mmm -2 m 0, C C C m 6 .- - a a 4 d m - E 0 0, n + 0 U C m C C C m m .- E a a a 4 t 0 .- c .- 8 c t > 0 L c ._ 8 E U C a, 0 C - 8 a 't a, mmm CCC .P .P .P ccc 000 CucUa, ana mmm KCC --- C m - a > 0 C a, P 2 W U C m - a, > a, -I C 0 .- c 2 6 P C a, 2 W z 0 mm CC 00 ma, an mu) CC ma, a,a, mu) mm .P .P cc -- .E .E mm -- coco 00 00 r?? 60 -7 q 3% mm 00 00 !?e 6;; == m C C a, .- .- L t C 0 0 a, .- c c E? a E G E .- LL a

TXU Power

-4- Electronic distribution by RIV: Regional Administrator (BSMI) DRP Director (ATH) DRS Director (DDC) DRS Deputy Director (RJCI) Senior Resident Inspector (DBA) Branch Chief, DRPIA (CEJI) Senior Project Engineer, DRPIA (TRF) Team Leader, DRPITSS (FLBZ) RITS Coordinator (MSH3) V. Dricks, PA0 (VLD) W. Maier, RSLO (WAM) L. Owen, RA Secretary (LAO) DRS Branch Chiefs (WBJ, ATG, LJS, MPSI) C. Miller, Chief, TRPS, OED0 (CGM) S. Richards, Deputy Director, DlRS (SAR) J. Lubinski, Deputy Director, DORL (JWL) C. Haney, Director, DORL, NRR (CXH) D. Terao, Chief, PLB IV, DORL, NRR (DXT) M. Thadani, NRR Project Manager for CPSES (MCT) RidsNrrDirslpab@nrc.gov ROPreports@nrc.gov SUNS1 Review Completed: -cej- ADAMS: mYes 0 No Initials: -cej Publicly Available Cl Non-Publicly Available Sensitive ix Non-Sensitive R:\ REACTORS\EOC and Midcvcle\EOC Assessment Letters\2006 - dated 3-2-07\CP.w~d 11 CEJohnson;df I DDChamberlain I ATHowell I I I I CEJohnson II 11 2/23/07 12/23/07 12/25/07 13/2/07 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax